ILLINOIS POLLUTION CONTROL BOARD
~:
or:
~
~(on
STEPHEN G.BR~LL,
)
)
Complainant,
)
APPLICATION TO EXTEND
)
DEADLINE REGARDING
vs.
)
INSTALLATION OF
)
INTERLOCK DEVICES
HENRY LATORIA, Individually and
)
Doing Business As T.L. TRUCKING
)
Case PCB 00-219
FOODLINER,
).
(Enforcement/Noise, Citizens)
)
Respondent.
)
COMES NOW, Respondent,
T.L. Trucking Foodliner, and in support oftheir Application,
states as follows:
1.
The Illinois Pollution Control Board ordered numerous remedies
be completed by
Respondent in its Order dated August 7, 2003.
2.
All items to be completed within 40 days of the ruling have been completed.
3.
Items b, c and d, which were to be completed within 90 days ofthe ruling, have been
completed.
4.
Item a, namely installation ofan interlock device, has not yet been completed.
5.
Respondent has hired an expert to complete the interlock device.
6.
Attached hereto as Exhibit A is a letterfrom AppliedMechanical Technology, LLC,
indicating that due to back order ofsomeofthe parts and the necessity oftesting before installation,
these interlock doors cannotbe completed until approximately December
12, 2003.
7.
Given that all other matters set out by the Board were met in a timely fashion,
and
delay
in
completion
of this
item
is
due
to
factors
outside
Respondent’s
control,
Respondent
respectfully requests that they be allowed until December 12, 2003, to finish the interlockoverhead
door system.
WHEREFORE,
Respondent respectfully requests that the Board enter an Order allowing
extension ofthedeadline to its requiredrulingunder paragraph4(a), namely, installationofinterlock
doors, until December
12, 2003.
Page
1
of
2
HENRY
LATORIA,
Individually
and
Doing
Business
as
T.L.
TRUCKING FOODLINER, Respondent, By:
KINTZINGER LAW FIRM, P.L.C.
By:
Attorneys for Respondent
100 West
12th
Street
P. 0. Box 703
Dubuque, IA 52004-0703
(563)
588-0547
Fax (563) 588-1981
cc.
Stephen G. Brill
9204 Crescent Drive
Franklin Park, IL 6013 1-2008
Mike Birkett
Truck Country ofIowa
Highway
151
and 61
S
Dubuque, IA 52003
AU Bradley Halloran
IllinoisPollution Control Board
James R.
Thompson Center, Suite 11-500
100 W.
Randolph Street
Chicago, IL 60601
PROOF
OF SERVICE
The undersigned certifies that the foregoing instrument
was served
upon all parties to the
above
cause or to
each of the
attorneys of
record
herein
t
eir
respective
addresses
disclosed
on
the
pleadi
gs
tls
day of October, 2003.
• By:
U.S.
ii
FAX
~1
000015428
E:~Users\SUE\truckappIication.ct
Page 2 of
2
OCT—27—2003
13: ii
FOODL I NER
530
Morhenca
Illinois
60954-0530
815-472-2700
Phcr~e
377-4S9.26&
I
Toll-free
815-472..2930
Fax
Mr. Mike O’Connor
10/24/03
Foodliner / Quest Logistics
9200 King
Street
FranklinPark,IJ.,
60131
Re: Scheduling fir
ElectricalJrnerloc1thig
Wehavereviewedour scheduling,
aM checked invemoay with ourvendors on ths
suppliesneeded to
manufacture thenew elecizical
control panels ~r interlockingthetank
cleaningequip~emwiththeoverhead
doors. Sonwofthe
parts
arebackordered arid will
not beatourfacility urttiliheweekofNovember
l7~.
Wcwfflthenneed
5—6
claysto
build and
test the panels. With theábeve
availabilitywe will start ott-site installation
either the 1a~t
week
oiNovember
or the first Week
ofDeceinber with completion being
10—12 days after start date. I
estimate
that on orby 12/12/03 the newcontrol panels
wilt
be insrailed &
testet
Iwould again like to thank-you fbr being awarded this
contract
Ifyou have any
question
or cotcetnsI can be reached
®
(815)472-2700.
Thank-You
Patrick Lynch
~
President
“fri The World of Technology Quality Makes The DIfference”