CLERR~
    ~
    ILLINOIS POLLUTION CONTROL BOARD
    ~:
    or:
    ~
    ~(on
    STEPHEN G.BR~LL,
    )
    )
    Complainant,
    )
    APPLICATION TO EXTEND
    )
    DEADLINE REGARDING
    vs.
    )
    INSTALLATION OF
    )
    INTERLOCK DEVICES
    HENRY LATORIA, Individually and
    )
    Doing Business As T.L. TRUCKING
    )
    Case PCB 00-219
    FOODLINER,
    ).
    (Enforcement/Noise, Citizens)
    )
    Respondent.
    )
    COMES NOW, Respondent,
    T.L. Trucking Foodliner, and in support oftheir Application,
    states as follows:
    1.
    The Illinois Pollution Control Board ordered numerous remedies
    be completed by
    Respondent in its Order dated August 7, 2003.
    2.
    All items to be completed within 40 days of the ruling have been completed.
    3.
    Items b, c and d, which were to be completed within 90 days ofthe ruling, have been
    completed.
    4.
    Item a, namely installation ofan interlock device, has not yet been completed.
    5.
    Respondent has hired an expert to complete the interlock device.
    6.
    Attached hereto as Exhibit A is a letterfrom AppliedMechanical Technology, LLC,
    indicating that due to back order ofsomeofthe parts and the necessity oftesting before installation,
    these interlock doors cannotbe completed until approximately December
    12, 2003.
    7.
    Given that all other matters set out by the Board were met in a timely fashion,
    and
    delay
    in
    completion
    of this
    item
    is
    due
    to
    factors
    outside
    Respondent’s
    control,
    Respondent
    respectfully requests that they be allowed until December 12, 2003, to finish the interlockoverhead
    door system.
    WHEREFORE,
    Respondent respectfully requests that the Board enter an Order allowing
    extension ofthedeadline to its requiredrulingunder paragraph4(a), namely, installationofinterlock
    doors, until December
    12, 2003.
    Page
    1
    of
    2

    HENRY
    LATORIA,
    Individually
    and
    Doing
    Business
    as
    T.L.
    TRUCKING FOODLINER, Respondent, By:
    KINTZINGER LAW FIRM, P.L.C.
    By:
    Attorneys for Respondent
    100 West
    12th
    Street
    P. 0. Box 703
    Dubuque, IA 52004-0703
    (563)
    588-0547
    Fax (563) 588-1981
    cc.
    Stephen G. Brill
    9204 Crescent Drive
    Franklin Park, IL 6013 1-2008
    Mike Birkett
    Truck Country ofIowa
    Highway
    151
    and 61
    S
    Dubuque, IA 52003
    AU Bradley Halloran
    IllinoisPollution Control Board
    James R.
    Thompson Center, Suite 11-500
    100 W.
    Randolph Street
    Chicago, IL 60601
    PROOF
    OF SERVICE
    The undersigned certifies that the foregoing instrument
    was served
    upon all parties to the
    above
    cause or to
    each of the
    attorneys of
    record
    herein
    t
    eir
    respective
    addresses
    disclosed
    on
    the
    pleadi
    gs
    tls
    day of October, 2003.
    • By:
    U.S.
    ii
    FAX
    ~1
    000015428
    E:~Users\SUE\truckappIication.ct
    Page 2 of
    2

    OCT—27—2003
    13: ii
    FOODL I NER
    530
    Morhenca
    Illinois
    60954-0530
    815-472-2700
    Phcr~e
    377-4S9.26&
    I
    Toll-free
    815-472..2930
    Fax
    Mr. Mike O’Connor
    10/24/03
    Foodliner / Quest Logistics
    9200 King
    Street
    FranklinPark,IJ.,
    60131
    Re: Scheduling fir
    ElectricalJrnerloc1thig
    Wehavereviewedour scheduling,
    aM checked invemoay with ourvendors on ths
    suppliesneeded to
    manufacture thenew elecizical
    control panels ~r interlockingthetank
    cleaningequip~emwiththeoverhead
    doors. Sonwofthe
    parts
    arebackordered arid will
    not beatourfacility urttiliheweekofNovember
    l7~.
    Wcwfflthenneed
    5—6
    claysto
    build and
    test the panels. With theábeve
    availabilitywe will start ott-site installation
    either the 1a~t
    week
    oiNovember
    or the first Week
    ofDeceinber with completion being
    10—12 days after start date. I
    estimate
    that on orby 12/12/03 the newcontrol panels
    wilt
    be insrailed &
    testet
    Iwould again like to thank-you fbr being awarded this
    contract
    Ifyou have any
    question
    or cotcetnsI can be reached
    ®
    (815)472-2700.
    Thank-You
    Patrick Lynch
    ~
    President
    “fri The World of Technology Quality Makes The DIfference”
    TOTAL