ILLINOIS POLLUTION CONTROL BOARD
March 11,
1992
IN THE MATTER OF:
PETITION OF THE REYNOLDS METAL
)
AS 91-8
COMPANY FOR ADJUSTED STANDARD
)
(Adjusted Standard)
FROM 35 ILL. AD~1. CODE 218.980
)
ORDER OF THE BOARD
(by M.
Nardulli):
This matter
conies before the Board
on the February
28,
1992
filing of a status report by the Reynolds Metal Company.
Reynolds
states that the USEPA has indicated it will reconsider the rules
involved
as expeditiously as practicable but has not yet made
a
decision.
The Board
accepted this matter
for hearing
on January
23,
1992,
but delayed assigning a hearing
officer until USEPA takes
final action.
This delay
is necessary because the petition could
result
in
a
revision
to
the
State
Implementation
Plan
(SIP).
Before a revision to the SIP can be accepted, the USEPA must first
revise
the
Federal
Implementation
Plan
(FIP).
Reynolds
has
petitioned USEPA for the revision to the FIP and is waiting for
USEPA’s decision.
The
parties
are
directed
to
file
a
status
report
in
the
Board’s offices by June 10,
1992.
IT IS SO ORDERED.
I,
Dorothy
M.
Gunn,
Clerk of the Illinois Pollution Control
Board,
hereby
certify that
the
above
Order
was
adopted
on
the
___________
day
of
~a~
,
1992,
by
a
vote
of
7
-
,712
~
~
Dorothy
M. ~inn, Clerk
Illinois Pdllution Control Board
131—59