ILLINOIS POLLUTION CONTROL BOARD
    June
    17, 1993
    IN THE MATTER OF:
    )
    PETITION OF ILLINOIS POWER COMPANY
    )
    (CLINTON POWER STATION), FOR
    )
    PCB 92-142
    HEARING PURSUANT TO 35 ILL. ADN.
    )
    (Thermal Demonstration)
    CODE 302.211 TO DETERMINE
    )
    SPECIFIC THERMAL STANDARDS
    )
    ORDER OF THE BOARD (by G.
    T. Girard):
    On June 16,
    1993,
    the Board received a filing which was
    entitled a “Request for Decision”.
    The Board will construe the
    filing as a motion for expedited decision.
    The Board notes that
    this petition was originally filed on September 30,
    1992.
    The
    Board grants the motion for expedited decision consistent with
    the Board resources and time constraints.
    I, Dorothy N.
    Gunn,
    Clerk of the
    Illinois Pollution Control
    Board, hereby c
    ify that the above order was adopted on the
    /
    7t~
    day of
    ______,
    1993,
    by a vote of
    7—0.
    /
    (/1,
    Dorothy N. 5~nn, Clerk
    Illinois P~J’lutionControl Board
    UI
    t~.3~-O
    I
    79.

    Back to top