ILLINOIS POLLUTION CONTROL BOARD
June
17, 1993
IN THE MATTER OF:
)
PETITION OF ILLINOIS POWER COMPANY
)
(CLINTON POWER STATION), FOR
)
PCB 92-142
HEARING PURSUANT TO 35 ILL. ADN.
)
(Thermal Demonstration)
CODE 302.211 TO DETERMINE
)
SPECIFIC THERMAL STANDARDS
)
ORDER OF THE BOARD (by G.
T. Girard):
On June 16,
1993,
the Board received a filing which was
entitled a “Request for Decision”.
The Board will construe the
filing as a motion for expedited decision.
The Board notes that
this petition was originally filed on September 30,
1992.
The
Board grants the motion for expedited decision consistent with
the Board resources and time constraints.
I, Dorothy N.
Gunn,
Clerk of the
Illinois Pollution Control
Board, hereby c
ify that the above order was adopted on the
/
7t~
day of
______,
1993,
by a vote of
7—0.
/
(/1,
Dorothy N. 5~nn, Clerk
Illinois P~J’lutionControl Board
UI
t~.3~-O
I
79.