ORDER OF THE BOARD (by C.A. Manning):
On September 3, 2002, the parties timely filed a joint notice to extend the 35-day period
within which Hannel Oil Company (Hannel) may appeal a July 29, 2002 determination of the
Illinois Environmental Protection Agency (Agency).
See
415 ILCS 5/40(a)(1) (2000)
as
amended by
P.A. 92-0574, eff. June 26, 2002; 35 Ill. Adm. Code 105.406. The Agency denied
part of Hannel’s request for reimbursement from the Underground Storage Tank Fund regarding
a leaking underground storage tank site on Rural Route 100 in Bluffs, Scott County. The Board
extends the appeal period until December 2, 2002, as the parties request.
See
415 ILCS
5/40(a)(1) (2000)
as amended by
P.A. 92-0574, eff. June 26, 2002; 35 Ill. Adm. Code 105.406.
If Hannel fails to file an appeal on or before that date, the Board will dismiss this case and close
the docket.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on September 19, 2002, by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board