ILLINOIS POLLUTION CONTROL BOARD
January 23,
1992
NATURAL GAS PIPELINE CO.
OF
AMERICA,
Petitioner,
v.
)
PCB 92—13
(Provisional Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD
(by J.
C.
Marlin):
This matter comes before the Board upon receipt of an Agency
Recommendation dated January
21,
1992
The recommendation refers
to
a request from Petitioner,
Natural Gas Pipeline Co.
of America
for
a
30 day provisional variance
for its Macon County facility
from the 90-day on-site limitations for hazardous wastes set forth
in
35 Ill.
Adm.
Code 722.134(b).
Upon
receipt
of
the
request
the
Agency
issued
its
recommendation,
finding that the hazardous wastes must remain on—
site
for
longer
than
90
days
due
to
unforeseen,
temporary
and
uncontrollable
circumstances
and
failure
to grant
the. requested
30-day
provisional
variance
would
impose
an
arbitrary
or
unreasonable hardship on Petitioner.
The
responsibilities
of
the Agency
and the
Board
in
these
short—term
provisional
variances
are
different
from
the
responsibilities in standard variances.
See Ill.
Rev.
Stat.
1989,
ch. 1l1~, pars.
1035(b)
&
(c).
In provisional variances it
is the
responsibility of the Agency to make the technical determinations
and
finding
of arbitrary
or unreasonable
hardship.
The Boardts
responsibility
is
to adopt
a
formal
Order,
to assure
the formal
maintenance
of
the
record,
to
assure
the
enforceability
of
the
variance,
and
to
provide
notification
of the action
by
a
press
release.
Having
received
the
Agency
recommendation
finding
that
a
denial
of
the
request
relief
would
impose
an
arbitrary
and
unreasonable
hardship
the
Board
hereby
grants
Petitioner
a
provisional variance from 35 Ill. Adm. Code 722.134(b)
from January
12,
1992
to February
11,
1992.
IT IS SO ORDERED.
129—33 7
—2—
I,
Dorothy N.
Gunn,
Clerk of the Illinois Pollution Control
Board, hereby cer
y that the above Order was adopted on the
7~/~_(~~
day of ____________________________,
1992, by a vote of
Control Board
129—338