ILLINOIS POLLUTION
    CONTROL BOARD
    January
    4,
    1996
    GENERAL
    ELECTRIC CONTROL
    )
    PRODUCTS,
    Petitioner,
    )
    PCB 96—96
    v.
    )
    (Permit-Appeal Ninety-Day
    )
    Extension)
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    )
    )
    Respondent.
    ORDER OF THE BOARD
    (C.A. Manning):
    Ofl November
    1,
    1995, the Illinois Environmental Protection
    Agency (Agency) and General Electric Control Products filed a
    notice of extension of the 35-day appeal period pursuant to
    Section 40 of the Act, relating to a September 27,
    1995 Agency
    final determination.
    By order of November 16,
    1995, the Board reserved Docket PCB
    96-96 for any petition which might be filed by General Electric
    Control Products.
    The order stated “in the event that General
    Electric Control Products fails to file an appeal on or before
    December 26, 1995
    (the 90th day after September 27,
    1995), the
    Board will dismiss the docket as unnecessary”.
    No petition has been filed.
    This matter is dismissed and
    the docket is closed as unnecessary.
    IT IS SO ORDERED.
    I,
    Dorothy M. Gunn,
    Clerk of the Illinois Pollution Contro,~t
    Board, here
    ertify that the above order was adopted on the
    -~
    day of
    ~.-
    ,
    1996, by a vote of
    _______
    ~
    Dorothy
    M./9’unn, Clerk
    Illinois t?tlution
    Control Board

    Back to top