ILLINOIS POLLUTION CONTROL BOARD
    October 17, 1996
    VILLAGE OF ROCKDALE,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-13
    (Variance - Public Water Supply)
    OPINION AND ORDER OF THE BOARD (by J. Theodore Meyer):
    This matter is before the Board on the Village of Rockdale’s (Rockdale) petition for
    variance filed on July 16, 1996. Rockdale is seeking a variance from the requirements of 35
    Ill. Adm. Code 602.105(a), “Standards for Issuance” and 35 Ill. Adm. Code 611.106(a)
    “Restricted Status”, to the extent these requirements involve 35 Ill. Adm. Code 611.330(a)
    and (b) which establishes the maximum contaminant level (MCL) for combined radium-226
    and radium-228 of 5.0 picocuries per liter (pCi/L), and gross alpha particle activity level of
    15.0 pCi/L, respectively. The Village requests a five-year variance.
    On August 12, 1996 the Illinois Environmental Protection Agency (Agency) filed its
    variance recommendation. The Agency recommends that a five-year variance be granted
    subject to certain conditions. Rockdale waived hearing and no hearing was held.
    The Board’s responsibility in this matter arises from the Illinois Environmental
    Protection Act (Act). (415 ILCS 5/1
    et seq.
    (1994).) The Board is charged with the
    responsibility of granting variance from Board regulations whenever it is found that immediate
    compliance with the regulations would impose an arbitrary or unreasonable hardship upon the
    petitioner. (415 ILCS 5/35(a).) The Agency is required to appear at hearings on variance
    petitions (415 ILCS 5/4(f)), and is charged, among other things, with the responsibility of
    investigating each variance petition and making a recommendation to the Board as to the
    disposition of the petition. (415 ILCS 5/37(a).)
    For the following reasons, the Board finds that Rockdale has presented adequate proof
    that immediate compliance with the Board’s regulations for “Standards for Issuance” and
    “Restricted Status” would impose an arbitrary or unreasonable hardship. Accordingly, the
    request for a variance from the Board’s “Standards of Issuance” and “Restricted Status” is
    granted, beginning on the date of this opinion and subject to the conditions set forth in the
    attached order.

    2
    BACKGROUND
    Rockdale is a municipality located in Will County, Illinois. (Pet. at 1.)
    1
    Rockdale
    provides a potable water supply and distribution system to a population of approximately 640
    residential representing approximately 1,700 residents and 44 industries and businesses
    employing approximately 900 people. (Pet. at 3.) Rockdale’s water supply and distribution
    system consists of one deep well, two shallow wells, pumps and distribution facilities. (
    Id.
    )
    Rockdale is not part of a regional public water supply. (
    Id.
    )
    In a letter dated June 10, 1986, the Agency first advised Rockdale that its water supply
    showed a gross alpha particle activity level of 23.0 pCi/L, exceeding the 15.0 pCi/L MCL.
    (Rec. at 6, Pet. at 4.) However, the most recent gross alpha particle activity level analyses,
    completed on April 12, 1996, showed a level of 1.0 pCi/L, which does not exceed the 15.0
    pCi/L MCL. (Rec. at 5, 6.) Therefore, the Agency found that Rockdale is currently in
    compliance with the gross alpha particle activity level. (Rec. at 2, 6.)
    The Agency first advised Rockdale that its water supply exceeded the MCL for
    combined radium in a letter dated August 23, 1985. (Pet. at 4.) The Agency’s analyses
    showed a level of 11.8 pCi/L for combined radium content, exceeding the 5.0 pCi/L MCL .
    (
    Id.
    ) The most recent analyses of Rockdale’s water supply completed at Tap 2, Well 2 was on
    April 24, 1995. (Rec. at 5.) This sample revealed that the water supply has a combined
    radium content of 5.9 pCi/L. (
    Id.
    ) This level exceeds the 5.0 pCi/L combined standard for
    radium-226 and radium-228. (
    Id
    .)
    On July 23, 1996, the Agency notified Rockdale that it violated the Environmental
    Protection Act (Act) by not providing public notice to the users of the water supply that the
    water exceeded the MCL levels for radium-226 and radium-228. (415 ILCS 5/18 (1994), 35
    Ill. Adm. Code 611.852.) (Rec. at 4.) However, on July 29, 1996, the Mayor of Rockdale,
    James Jimenez, signed a Letter of Commitment with the Agency that Rockdale will comply
    with the Act by sending its customers notice that the water supply exceeds the MCL levels for
    radium-226 and radium-228. (Rec. at 4-5.)
    Rockdale is requesting a variance to allow for expansion or extension of its water
    supply and distribution system. Rockdale foresees extending its water mains to serve the
    following: (1) Banner Western, an existing industrial facility; (2) Berryman Transfer, an
    existing industrial facility; and (3) the American Legion Hall. (Pet. at 4.) Rockdale has not
    filed a previous variance petition. (Pet. at 7.)
    REGULATORY FRAMEWORK
    In determining whether any variance is to be granted, the Act requires the Board to
    ascertain whether a petitioner has presented adequate proof that immediate compliance with the
    Board regulations at issue would impose an arbitrary or unreasonable hardship. (415 ILCS
    1
    Rockdale’s Petition for Extension of Variance will be cited as (Pet. at __); the Agency’s
    Recommendation will be cited as (Rec. at __.).

    3
    5/35(a).) Furthermore, the burden is upon petitioner to show that its claimed hardship
    outweighs the public interest in attaining compliance with regulations designed to protect the
    public. (Willowbrook Motel v. Pollution Control Board, 135 Ill.App.3d 343, 481 N.E.2d
    1032 (1st Dist. 1977).) The petitioner must establish this burden in order for the claimed
    hardship rise to the level of arbitrary or unreasonable hardship.
    Rockdale does not seek a variance from the MCL of 5.0 pCi/L for combined radium.
    (Pet. at 13.) The radium standard will remain applicable to Rockdale’s water supply
    irrespective of the action taken by the Board. Rather, the instant variance request concerns
    two features of the Board’s public water supply regulations: Standards for Issuance and
    Restricted Status. These features are found at 35 Ill. Adm. Code 602.105 and 602.106,
    respectively, and in pertinent part read:
    Section 602.105
    Standards for Issuance
    a)
    The Agency shall not grant any construction or operating permit required by
    this Part unless the applicant submits adequate proof that the public water supply will
    be constructed, modified or operated so as not to cause a violation of the
    Environmental Protection Act...or of this chapter.
    (35 Ill. Adm. Code 602.105.)
    Section 602.106
    Restricted Status
    a)
    Restricted status shall be defined as the Agency determination pursuant to
    Section 39(a) of the Act and Section 602.105, that a public water supply facility may
    no longer be issued a construction permit without causing a violation of the Act or this
    Chapter.
    b)
    The Agency shall publish and make available to the public, at intervals of nor
    more than six months, a comprehensive and up-to-date list of supplies subject to
    restrictive status and the reasons why.
    (35 Ill. Adm. Code 602.106.)
    The principal effect of these regulations is that public water suppliers are prohibited
    from extending water service due to their inability to obtain the requisite permits, unless and
    until their water meets all the standards for finished water supplies. A grant of variance from
    “Standards for Issuance” and “Restricted Status” neither absolves a petitioner from compliance
    with the drinking water standards at issue, nor insulates a petitioner from possible enforcement
    actions for violating those standards. The underlying standards remain applicable to the
    petitioner regardless of whether the variance is granted or denied.
    Standards for combined radium in drinking water were first adopted as National Interim
    Primary Drinking Water Regulations by the United States Environmental Protection Agency
    (USEPA) in 1976. The standard adopted was 5.0 pCi/L for the sum of two isotopes of

    4
    radium: radium-226 and radium-228 (“combined radium”). Shortly thereafter Illinois
    adopted the same limits. Although characterized as “interim” limits, these standards are the
    MCLs under both federal and Illinois law, and will remain so unless modified by the USEPA.
    In anticipation of USEPA’s revision of the radium standard, the Illinois legislature amended
    the Act at Section 17.6 in 1988 to provide that any new federal radium standard will
    immediately supersede the current Illinois standard. The state standard is therefore inexorably
    tied to the federal standard, and cannot be greater than or less than the federal limit.
    Since their original promulgation, the current radium standards have been under review
    at the federal level. The USEPA has been evaluating the interim radium standards pursuant to
    Sections 1412(b)(1)(B) and 1412(b)(2) of the Safe Drinking Water Act that require USEPA to
    propose and promulgate the National Revised Primary Drinking Water Regulations. On
    October 5, 1983 USEPA announced its intention of revising the interim radionuclides
    standards in an Advanced Notice of Proposed Rulemaking (ANPR). (48 Fed.Reg. 45502). In
    that notice, USEPA stated that it would perform a comprehensive reassessment of the interim
    standards in order to optimize public health protection without unnecessary economic burdens
    on states and communities. It later republished this ANPR in September 1986, establishing
    MCL goals for radionuclides and providing information related to establishing MCLs for
    radionuclides. (51 Fed.Reg. 34836).
    On July 18, 1991 the USEPA published a rulemaking proposal which included a
    revision of the interim standards for radium-226 and radium-228. (56 Fed.Reg. 33050).
    USEPA proposes to replace the 5.0 pCi/L combined radium standard with separate MCLs of
    20.0 pCi/L each for radium-226 and radium-228. In proposing the revised MCLs, USEPA
    gave consideration to available technologies and associated costs, analytical capabilities and
    health risks associated with the contaminants. USEPA determined that alternatives at the 10
    -4
    lifetime risk level, approximately 20.0 pCi/L for both radium-226 and radium-228, are
    protective to human health. Hence, the USEPA concluded that it was not cost effective to set
    MCLs for radium at the technically feasible level of 5.0 pCi/L.
    This change in the radium standard was to be promulgated by April 1995, but the
    deadline was later extended to September 1995. However, Congress prohibited funds for the
    promulgation of final radionuclide standards for fiscal year 1994 and 1995. Mr. Joseph
    Harrison, Chief of the Safe Drinking Water Division, USEPA Region V, announced that in
    light of the projected proposal for the relaxed standard, the USEPA would not force any
    municipality to spend funds to comply with the federal combined standard.
    COMPLIANCE PLAN
    Rockdale does not have any existing controls for reducing its combined radium levels.
    (Pet. at 5.) Rockdale proposes to use other wells for blending purposes to achieve compliance.
    (Pet. at 5, Rec. at 6.) The estimate construction costs is $66,000, and the estimated
    implementation time is eighteen to twenty-four months. (Pet. at 5, 6.) In addition, Rockdale
    intends to retain an outside consultant to assist in reviewing and evaluating the radium levels in

    5
    the water. (Pet. at 6.) The outside consultant will also prepare recommendations for
    achieving compliance with the radium standards. (
    Id.
    )
    Rockdale points to the uncertain status of the federal standard for combined radium,
    and states that the most appropriate course of action is to seek a variance that is linked to the
    adoption or non-adoption of revised radium standards. (Pet. at 12.) Rockdale believes that a
    variance would relieve it from expending significant public funds to design and construct
    facilities which may become unnecessary by the time it is completed. (
    Id
    .)
    ARBITRARY OR UNREASONABLE HARDSHIP
    Rockdale states that denial of its request for a variance would pose an arbitrary or
    unreasonable hardship because significant development would be delayed or precluded. (Pet.
    at 10, 12.) In addition, Rockdale states that denial of its requested variance would be an
    arbitrary or unreasonable hardship because it would require the Agency to keep Rockdale on
    its restricted status list. Placing Rockdale on restricted status requires the Agency to reject
    construction and operating permits until compliance with the standards is achieved, which in
    turn means that no new water main extensions could be constructed, and further development
    would be obstructed. (Pet. at 3, 10, 12.)
    ENVIRONMENTAL IMPACT
    In its recommendation, the Agency stated its belief that granting the requested variance
    would impose no significant injury to the public or the environment. (Rec. at 7-10.) The
    Agency asserts that the proposed variance should cause no significant health risk for the
    population served by any new water main extensions for the time period of the recommended
    variance. (Rec. at 10.) The Agency relies on testimony presented by Richard E. Toohey,
    Ph.D., of Argonne National Laboratory, at hearings held on July 30 and August 2, 1985 in
    R85-14, Proposed Amendments to Public Water Supply Regulations, 35 Ill.Adm.Code
    602.105 and 602.106. (Rec. at 8.)
    CONSISTENCY WITH FEDERAL LAW
    The parties believe the Board can grant the requested variance consistent with the Safe
    Drinking Water Act, PL 93-523, as amended by PL 96-502, 42 U.S.C. 300(f) and the USEPA
    drinking water regulations (40 CFR 141 (1993)). The requested variance, which would allow
    construction of water main extensions, would not be a variance from federal drinking water
    regulations, but only a variance from the state’s regulations regarding Restricted Status and
    Standards of Issuance. Since only state criteria are relevant in this request for variance, there
    is no conflict with federal law. The parties point out that granting the variance will not
    insulate Rockdale from possible enforcement actions for violations of the radium standards.
    However, the USEPA has indicated that it will not intervene in variances which trigger final
    design and construction of compliance equipment by the date on which USEPA revises the
    MCL for radium set forth at 40 CFR 141.15(a). (Rec. at 8-9.)

    6
    ANALYSIS
    The issue the Board before the is whether petitioner would incur an arbitrary or
    unreasonable hardship which outweighs the environmental and health impact if its request for
    variance is denied. In determining what constitutes an arbitrary or unreasonable hardship, the
    Board notes that a speculative change in law is not grounds for establishing arbitrary or
    unreasonable hardship. However, in some circumstances a prospective change in law may be
    appropriately reflected in the conditions upon which a variance is granted. (City of Genoa v.
    IEPA (December 20, 1990) PCB 90-166, 117 PCB 135).)
    In the case at bar, the Board finds it appropriate to condition the granting of a variance
    based on the USEPA’s expected decision to revise the radium standards in October 1996. By
    basing its decision on the expected USEPA revision, the Board is ensuring that Rockdale will
    achieve compliance with the standard USEPA will mandate. The Board’s condition also
    ensures that Rockdale will not need to prematurely return to this Board to request another
    variance. The Illinois legislature linked state standard changes with federal standard changes.
    (415 ICLS 5/17.6) The Board believes it is consistent with legislative intent to allow delay in
    compliance until the regulatory scheme stabilizes at the federal level. As a result, the Board is
    disinclined to require a municipality to expend substantial funds in order to conform to a
    standard that is being federally reviewed and expected to be relaxed in the future.
    Rockdale states that numerous residential and commercial developments would be
    halted if the variance request is denied, resulting in loss of tax income for the city and loss of
    job opportunities for Rockdale residents. (Pet. at 3, 10-11.) Normally, consequences of
    variance denial such as the loss of job opportunities, city income and taxes, and the loss of
    sales and enhanced property taxes, are considered merely the expected consequences of
    restricted status, and do not, by themselves, constitute arbitrary or unreasonable hardship.
    (Willowbrook Motel v. Pollution Control Board (July 14, 1983) PCB 1-149, 53 PCB 007;
    affirmed in
    Willowbrook Motel v. Pollution Control Board, 135 Ill.App.3d 343, 481 N.E.2d
    1032 (1st Dist. 1977) (emphasis added.) However, if the claimed hardship outweighs a
    nominal injury to the public or the environment, the Board can find that an arbitrary or
    unreasonable hardship would result. (Marathon Oil Company v. IEPA and IPCB, 610 N.E.2d
    789 (5th Dist. 1993).)
    The Board finds that Rockdale’s radium level of 5.9 pCi/L is not a significant
    divergence from the radium standard, and that the proposed variance would cause no
    significant health risk for the population served by water main extensions for the time period
    of the recommended variance. The Board agrees with the parties that a granting of the
    requested variance would not result in a significant injury to the public or to the environment
    for the limited time period requested.
    The Board notes that, during the term of the variance, Rockdale will be required to
    monitor its radium levels, and report its findings to the Agency. The Board’s order below will
    require Rockdale to secure means to notify its users of its non-compliance, and provide the
    Agency with its notification measures.

    7
    CONCLUSION
    Based on the above findings, the Board holds that Rockdale’s alleged hardship, due to
    the ongoing scrutiny of the federal radium standard, and due to the loss of economic and fiscal
    income should a variance be denied, outweighs the nominal environmental impact of the
    requested variance. Therefore, the Board finds the hardship to be an arbitrary or unreasonable
    one. Accordingly, the Board grants Rockdale a variance subject to the conditions stated
    below.
    The Board notes that Rockdale is in compliance with the MCL for gross alpha particle
    activity levels, and therefore only grants a variance from regulations concerning combined
    radium-226 and radium-228.
    Today’s action is solely a grant of variance from standards of issuance and restricted
    status. The effect of this variance is to allow Rockdale to extend water service to new
    customers. As Rockdale acknowledged in its petition, Rockdale is not granted variance from
    compliance with the combined radium standard, nor does today’s action insulate Rockdale in
    any manner from enforcement for violation of that standard.
    This opinion constitutes the Board’s findings of fact and conclusions of law in this
    matter.
    ORDER
    The Village of Rockdale (Rockdale) is hereby granted a variance from 35 Ill. Adm.
    Code 602.105(a), “Standards of Issuance” and 602.106(b), Restricted Status, only as they
    relate to the standards for combined radium-226 and radium-228 in drinking water as set forth
    in 35 Ill. Adm. Code 611.330(a), subject to the following conditions:
    (A)
    For purposes of this order, the date of United States Environmental Protection
    Agency (USEPA) action shall consist of the earlier date of the:
    (1) Date of promulgation by the USEPA of the regulation which amends
    the maximum contaminant level (MCL) for combined radium, either of
    the isotopes of radium, or the method by which compliance with a
    radium MCL is demonstrated; or
    (2)
    Date of publication of notice by USEPA that no amendments to the 5.0
    pCi/L combined radium standard or the method for demonstrating
    compliance with the 5.0 pCi/L will be promulgated.
    (B)
    The variance shall terminate on the earliest of the following dates:
    (1)
    Five years from the date of this order; or
    (2)
    Two years following the date of USEPA action.

    8
    (C)
    In consultation with the Illinois Environmental Protection Agency (Agency),
    Rockdale shall continue a sampling program to determine as accurately as
    possible the level of radioactivity in its wells and finished water. Until this
    variance terminates, Rockdale shall collect quarterly water samples from its
    distribution system at locations approved by the Agency. Rockdale shall
    composite quarterly samples from each location separately and shall have them
    analyzed annually by a laboratory certified by the State of Illinois for
    radiological analysis so as to determine the concentration of radium-226 and
    radium-228. At its own option, Rockdale may have the quarterly samples
    analyzed when collected. The results of the analyses shall be sent to:
    Illinois Environmental Protection Agency
    Compliance Assurance Section
    Drinking Water Quality Unit, Bureau of Water
    P.O. Box 19276
    Springfield, Illinois 62794-9276
    (D)
    Within 30 days of receiving the most recent quarterly sample, Rockdale shall
    also send to the address in paragraph (C) the running average results of
    the most recent four quarterly samples.
    (E)
    Within three months of USEPA action, Rockdale shall apply to the Agency at
    the
    address below for all permits necessary for construction, installation, changes,
    or additions to its public water supply needed for achieving compliance with the
    MCL for combined radium or with any other standard for radium in drinking
    water then in effect:
    Illinois Environmental Protection Agency
    Public Water Supply Program
    Permit Section
    2200 Churchill Road
    Springfield, Illinois 62794-9276
    (F)
    Within three months of the issuance of each construction permit by the Agency,
    petitioner shall advertise for bids, to be submitted with 60 days, from contractors
    to do the necessary work described in the construction permit. Rockdale shall
    accept appropriate bids within a reasonable time. Rockdale shall notify the
    Agency, Division of Public Water Supplies (DPWS), within 30 days, of each of
    the following actions: 1) advertisements for bids; 2) names of successful bidders;
    and 3) whether Rockdale accepted the bids.
    (G)
    Construction allowed on said construction permits shall begin within a reasonable
    time of bids being accepted, but in any case, construction of all installations,
    changes or additions necessary to achieve compliance with the MCL in question,

    9
    shall be completed no later than two years following USEPA action. One year
    will be necessary to prove compliance.
    (H)
    Pursuant to 35 Ill. Adm. Code 611.851(b), in its first set of water bills, or within
    three months after the date of this order, whichever occurs first, and every three
    months thereafter, Rockdale will send to each user of its public water supply a
    written notice to the effect that Rockdale is not in compliance with the standard in
    question. The notice shall state the average content of the contaminants in
    samples taken since the last notice period during which samples were taken.
    (I)
    Pursuant to 35 Ill. Adm. Code 611.851(b), in its first set of water bills, or
    within three months after the date of this order, whichever occurs first, and
    every three months thereafter, Rockdale will send to each user of its public water
    supply a written notice to the effect that Rockdale has been granted by the
    Illinois Pollution Control Board a variance from 35 Ill. Adm. Code 602.105(a),
    Standards of Issuance, and 601.106(b), Restricted Status, as it relates to the
    MCL standard in question.
    (J)
    Until full compliance is achieved, Rockdale shall take all reasonable measures
    with its existing equipment to minimize the level of contaminants in its finished
    drinking water.
    (K)
    Rockdale shall provide written progress reports to the Agency at the address
    below, every six months concerning steps taken to comply with paragraphs C,
    D, E, F, G, H, and, I. Progress reports shall quote each of said paragraphs and
    immediately below each paragraph state what steps have been taken to comply
    with each paragraph. Progress reports shall be sent to:
    Illinois Environmental Protection Agency
    Division of Public Water Supply
    Field Operations Section
    2200 Churchill Road
    Springfield, Illinois 62794-9276
    IT IS SO ORDERED.
    Board Member K.M. Hennessey abstained.
    If Rockdale chooses to accept this variance subject to the above order, within forty-five
    days of the grant of the variance, Rockdale must execute and forward the attached certificate
    of acceptance and agreement to:
    Stephen C. Ewart
    Division of Legal Counsel
    Illinois Environmental Protection Agency
    P.O. Box 19276

    10
    2200 Churchill Road
    Springfield, Illinois 62794-9276
    Once executed and received, that certificate of acceptance and agreement shall bind
    Rockdale to all terms and conditions of the granted variance. The 45-day period shall be held
    in abeyance during any period that this matter is appealed. Failure to execute and forward the
    certificate within 45 days renders this variance void. The form of the certificate is as follows:
    CERTIFICATION
    I (We), ______________________________________________, hereby accept and
    agree to be bound by all the terms of the Order of the Pollution Control Board in PCB
    97-13, October 17, 1996.
    _________________________________
    Petitioner
    _________________________________
    Authorized Agent
    _________________________________
    Title
    _________________________________
    Date
    Section 41 of the Environmental Protection Act (415 ILCS 5/41 (1994)) provides for
    the appeal of final Board orders within 35 days of the date of service of this order. The Rules
    of the Supreme Court of Illinois establish filing requirements. (See also 35 Ill.Adm.Code
    101.246 "Motions for Reconsideration.")
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above opinion and order was adopted on the _____ day of ___________, 1996, by a vote
    of ______________.
    ___________________________________
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board

    Back to top