ILLINOIS POLLUTION CONTROL BOARD
    March 2, 2000
    DAVID MULVAIN,
    Complainant,
    v.
    VILLAGE OF DURAND,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 98-114
    (Enforcement - Citizens, Water)
    WARREN H. LARSON APPEARED ON BEHALF OF COMPLAINANT; and
    HERBERT I. GREENE APPEARED ON BEHALF OF RESPONDENT.
    OPINION AND ORDER OF THE BOARD (by G.T. Girard):
    On March 9, 1998, complainant David Mulvain (Mulvain) filed a complaint alleging that the
    sewer system in Durand, Winnebago County, Illinois, is allowing excess infiltration into the sewer system
    and backup of sewage into basements. The complaint alleged that the sewer system is in violation of the
    Environmental Protection Act (Act) (415 ILCS 5/1
    et seq
    . (1998)) and the Board’s regulations. The
    complaint further alleged that the Illinois Environmental Protection Agency (Agency) improperly issued a
    permit (1997-1A-4892) to Rockford Blacktop Construction, Inc. (Rockford Blacktop) which will
    result in additional overload to the sewer system. On May 21, 1998, the Board dismissed Rockford
    Blacktop and the Agency from this proceeding.
    On March 18, 1999, the Board partially granted Mulvain’s motion for summary judgment.
    1
    The Board found that Durand violated Sections 12(a) and 12(f) of the Act and Board regulations at 35
    Ill. Adm. Code 306.303 and 306.304 prior to completion of sewer repairs in 1997. The Board
    directed that this matter proceed to hearing to determine if violations continued after the sewer system
    was repaired in 1997 and to determine the appropriate remedy for the violations.
    Hearing was held on August 10 and 11, 1999, before Board Hearing Officer John Knittle.
    Mulvain filed his brief on September 24, 1999. Durand’s brief was filed on October 27, 1999. The
    reply brief was filed on February 15, 2000.
    1
    The motion for summary judgment is cited as “Mot. at” and the response filed by Durand will
    be cited as “Resp. at.” The transcript from the hearings will be cited at “Tr. at”; Mulvain’s
    brief will be cited as “Comp.Br. at”; the reply brief will be cited as “Reply at”; and Durand’s
    brief will be cited as “Resp.Br. at”; Exhibits will be cited as “Exh. ”.

    2
    For the reasons discussed below, the Board finds that violations did occur after completion of
    the repairs to the Durand sewage system in 1997. The Board orders Durand to cease and desist from
    further violations of the Act. However, at this time the Board assesses no penalty against Durand.
    LEGAL FRAMEWORK
    Mulvain alleged in his complaint and the Board found on March 18, 1999, that Durand violated
    Sections 12 (a) and (f) of the Act and Sections 306.303 and 306.304 of the Board’s regulations.
    Sections 12 (a) and (f) provide, in pertinent part:
    No person shall:
    a.
    Cause or threaten or allow the discharge of any contaminants into the
    environment in any State so as to cause or tend to cause water pollution in
    Illinois, either alone or in combination with matter from other sources, or so as
    to violate regulations or standards adopted by the Pollution Control Board
    under this Act.
    f.
    Cause, threaten or allow the discharge of any contaminants into the waters of
    the States . . . including, but not limited to waters to any sewage works . . . in
    violation of any regulations adopted by the Board or of any order adopted by
    the Board with respect to the NPDES permit program. 415 ILCS 5/12 (a), (f)
    (1998).
    Section 306.303 provides:
    Excess infiltration into sewers shall be eliminated, and the maximum practicable flow
    shall be conveyed to treatment facilities. 35 Ill. Adm. Code 306.303
    Section 306.304 provides:
    Overflows from sanitary sewers are expressly prohibited. 35 Ill. Adm. Code 306.304.
    BACKGROUND
    Durand is a village with a population of 1,100 located in Winnebago County. Exh. AA, p.5.
    Low-to-moderate income residents make up 52% of the population.
    Id
    . Durand is located in an area
    with a high water table, zero to three feet below grade. Exh. AA, p. 8. Soil saturation and surface
    water runoff conditions are common during periods of heavy rainfall.
    Id
    . Much of the sewage
    collection system was installed in the early 1960’s.
    Id
    .
    As previously stated, the Board granted summary judgment in favor of the complainant on
    March 18, 1999. The Board based its decision granting summary judgment on several factors. One
    such factor was an Agency compliance report attached to the motion for summary judgment which

    3
    supported a finding of violation on the excess infiltration allegation. The Agency report dated December
    2, 1998, states:
    There is no known overflow or pumping from manholes or bypassing from lift stations.
    However, in the past, there was some basement backup, particularly in 1996 due to
    heavy rainfall. The Village [Durand] is aware of the severe I/I [infiltration and inflow]
    problem, particularly on North Street and has had Frinks TV some of the sewers
    periodically. The Village [Durand] has budgeted money for I/I work and sewer
    replacement which will begin in Spring 1999. Mot. Attachment at 6.
    An additional factor in granting summary judgment was the affidavit of Michael Sweet,
    Superintendent of Public Works for Durand. The affidavit indicates that Sweet observed “a bottle neck
    in the system causing sewage backups in basements.” Exhibit B at 1. Also, Durand admitted that there
    had been sewer backups although Durand maintained that no backups occurred after repairs were
    made in 1997. Resp. at 2. Durand also admitted that excessive infiltration had occurred. Resp. at 2.
    Durand completed repairs to the sewer system on November 20, 1997, at a cost of
    $141,615.65. Tr. at 210. On April 20, 1999, Durand started a second repair of the system at a cost
    of $500,000. The 1999 repairs were made possible because of a $400,000 grant from the Department
    of Commerce and Community Affairs. Durand paid the remaining portion of the costs. Tr. at 147-148.
    The repairs were completed on July 28, 1999.
    Id
    .
    ISSUES
    As the Board has already found that Durand was in violation of the Act and Board regulations,
    this matter was sent to hearing for two purposes: first, to establish if there were violations after the 1997
    repairs were completed; and second to determine the appropriate remedy. These are the only two
    issues the Board will decide in this opinion.
    Post-1997 Allegations of Violation
    According to the testimony of Mulvain, there were three additional incidents of overflow after
    completion of the repairs on November 10, 1997. Those incidents occurred in June 1998 (Tr. at 158),
    April 23, 1999 (
    Id
    .), and April 27, 1999 (
    Id
    .). Mulvain asserted that each of those incidents were
    reported to Sweet. Tr. at 162. Sweet does not dispute that Mulvain reported a backup to him in June
    1998. Tr. at 84. However, he did not investigate the alleged backup. Tr. at 262. Durand disputes
    that the June 1998 incident was a “backup” and submitted a video tape (R. Exh. 5) to compromise
    Mulvain’s assertions. The video tape shows an interview of Mulvain wherein Mulvain indicated that he
    had “groundwater” in his basement. Tr. at 261. Mulvain later explained that his use of the word
    “groundwater” was meant to include a sewer backup. Tr. at 352 and 353.
    With regards to the April 1999 incidents, Sweet asserts that Mulvain did not report the incidents
    to him. Tr. at 264-265. In fact, Sweet was out of town on April 23, 1999, at a seminar. Tr. at 212.
    Mulvain remains adamant that he did tell Sweet of the incidents. Tr. at 333. In addition, Mulvain

    4
    offered several photographs developed on April 30, 1999, which he asserts show the backup of April
    23, 1999. Tr. at 333-343.
    In addition to Mulvain’s assertions of backups, Sweet and Marion Miller, an employee of
    Durand, testified that “Rhonda Wells,” a resident of Durand, “had a couple inches of water in their [sic]
    basement” in June 1999. Tr. at 217. Miller did not enter the house because when he arrived, “there
    was a hose stuck in the sewer. Rockford Blacktop had been pumping from one manhole to the other
    manhole.” Tr. at 217.
    The alleged backups were not the only problems experienced by Durand. Sweet testified that,
    since completion of the 1997 repairs, there had been 24 incidents where effluent entered the receiving
    stream in excess of permit levels. Tr. at 52. Sweet also testified that since the completion of the 1997
    repairs, there have been violations of permit levels for CBOD and suspended solids. Tr. at 58.
    Remedy
    The second issue that the Board considered at hearing was the proper remedy in this
    proceeding. In the Board’s March 18, 1999 order, the Board stated that:
    In making determinations regarding remedy, the Board considers the factors set forth in
    Sections 33(c) and 42(h) of the Act. People v. Berniece Kershaw and Darwin Dale
    Kershaw d/b/a Kershaw Mobile Home Park (April 20, 1994), (hereinafter Kershaw)
    PCB 92-164; IEPA v. Allen Barry, individually and d/b/a Allen Barry Livestock (May
    10, 1990), (hereinafter Barry) PCB 88-71. The Board must take into account factors
    outlined in Section 33(c) of the Act in determining the unreasonableness of the alleged
    pollution. Wells Manufacturing Company v. Pollution Control Board, 73 Ill. 2d 226,
    383 N.E.2d 148 (1978). The Board is expressly authorized by statute to consider the
    factors in Section 42(h) of the Act in determining an appropriate civil penalty. In
    addition, the Board must bear in mind that no formula exists, and all facts and
    circumstances must be reviewed. Kershaw at 14; Barry at 62-63.
    Mulvain is not asking that a monetary penalty be assessed against Durand. Reply at 12 and 13;
    Tr. at 8, 173, 185 and 202. Instead, Mulvain is asking that the Board place a “limit on new hookups to
    the system” and retain jurisdiction over this complaint for the “period of the coming permit renewal.”
    Comp.Br. at 8 and Tr. at 173-174. In addition, Mulvain is asking the Board to:
    1.
    place the Durand system on “Critical Review” pursuant to 35 Ill. Adm Code
    306.403;
    2.
    prioritize and expedite any loan applications from Durand for sewer repairs;
    3.
    require annual reporting to the Board;

    5
    4.
    limit expenditures from sewer fees, grants and other sources of revenue to the
    Sewer Department to administration and operations of the sewer collection and
    treatment system; and
    5.
    act as the mediator between Durand and the complainant.
    Reply at 14-16.
    Durand argues that a fine would not be appropriate under the circumstances of this case
    because it voluntarily began an extensive program of sewer repairs prior to the filing of this complaint.
    Durand also argues that restriction of hookups is not necessary. Durand offers the testimony of Erwin
    Toerber in support of this argument. Toerber testified that: 1) the excursions that occurred since
    completion of the 1997 construction project do not warrant the placing of restrictions on Durand
    concerning additional hookups; and 2) that seven excursions over a period of three years is a good
    record. Tr. at 309-310; 322. Toerber also testified that Durand’s system after completion of the 1999
    improvements is either comparable or far ahead of other systems of the same size. Tr. at 309.
    DISCUSSION
    As previously discussed, this matter was sent to hearing to discuss two issues: the issue of
    alleged violations after November 20, 1997, and the issue of appropriate remedy. We will first discuss
    whether violations have occurred since November 20, 1997. Finally, we will address the appropriate
    remedy in this proceeding.
    Violations
    The Board finds that there have been violations since the 1997 repairs were completed. In June
    1998, Mulvain reported a sewer backup in his basement to Sweet. Sweet did not go into the basement
    to investigate. However, Durand relies on statements made in a television video report (R. Exh. 5) to
    impeach Mulvain’s testimony. The Board finds that Mulvain’s use of the term groundwater did not
    exclude a sewer backup. Therefore, we find that the evidence indicates that a sewer backup occurred
    in Mulvain’s basement in June 1998.
    Concerning the April 1999, incidents, we note that there are conflicting comments on whether
    Mulvain reported the two incidents to Durand; however, Mulvain provided pictures which show a
    backup in his basement. In addition, the only testimony which disputes Mulvain’s claims of backups in
    1999 is that no one else reported any problems. The Board finds Mulvain and his pictures convincing.
    Therefore, the Board finds that sewer backups did occur in Mulvain’s basement in April 1999.
    Finally, the testimony of Durand’s employees indicate that a couple inches of water was
    reported in the basement of Durand resident “Rhonda Wells” in June 1999. Upon investigation,
    Durand’s employee witnessed Rockford Blacktop pumping from one manhole to the other manhole.
    The Board finds that the evidence is sufficient to support a finding that the water in “Rhonda Wells’”
    basement was a sewer backup. The Board finds that the sewer backups in 1998 and 1999 were
    violations of Section 12(a) and (f) of the Act and 35 Ill. Adm. Code 306.303 and 306.304.

    6
    Remedy/Penalty
    Having found violation, the Board must now determine the remedy including what
    penalty is to be assessed, if any. The Board will look to the factors set forth in Sections 33(c)
    and 42(h) of the Act.
    Section 33(c) Factors
    Section 33(c) sets forth five factors that the Board must consider in making its
    determinations:
    1.
    the character and degree of injury to, or interference with the protection
    of the health, general welfare and physical property of the people;
    2.
    the social and economic value of the pollution source;
    3.
    the suitability or unsuitability of the pollution source to the area in which
    it is located, including the question of priority of location in the area
    involved;
    4.
    the technical practicability and economic reasonableness of reducing or
    eliminating the emissions, discharges or deposits resulting from such
    pollution source; and
    5.
    any subsequent compliance.
    The Character And Degree Of Injury To, Or Interference With The Protection Of The Health,
    General Welfare And Physical Property Of The People.
    A backup of sewage into the basement of a home can include organisms which are
    detrimental to human health. Tr. at 146. Although no ill effects were reported in this
    proceeding, the Board finds that the periodic backups into basements is an interference with the
    protection of the health of the people and this factor weighs against Durand.
    The Social And Economic Value Of The Pollution Source.
    The Board finds that this factor weighs in support of Durand. The sewer system clearly
    has social and economic value.
    The Suitability Or Unsuitability Of The Pollution Source To The Area In Which It Is Located,
    Including The Question Of Priority Of Location In The Area Involved.
    The sewer system including lagoons are appropriately placed and therefore this factor
    weighs in support of Durand. Exhibit 9.

    7
    The Technical Practicability And Economic Reasonableness Of Reducing Or Eliminating The
    Emissions, Discharges Or Deposits Resulting From Such Pollution Source.
    Durand has spent over $600,000 in repairing its sewer system to alleviate the problem
    of sewer backup. Thus, it was reasonable to correct the problem, and this factor weighs
    against Durand.
    Any Subsequent Compliance.
    The record is insufficient to determine if Durand is currently in compliance. The record
    does show that violations did continue after completion of the 1997 repairs. However, the
    record also shows that Durand had been working toward compliance including seeking funds to
    continue the repairs. Those repairs were completed in July 1999. Therefore, we will not
    weigh this factor either for or against Durand.
    Section 42(h) Factors
    Section 42(h) of the Act sets forth factors to be considered in determining the
    appropriate amount of the civil penalty. Those factors are:
    1.
    the duration and gravity of the violation;
    2.
    the presence or absence of due diligence on the part of the violator in
    attempting to comply with the requirements of this Act and regulations
    thereunder or to secure relief therefrom as provided by this Act;
    3.
    any economic benefits accrued by the violator because of delay in
    compliance with requirements;
    4.
    the amount of monetary penalty which will serve to deter further
    violations by the violator and to otherwise aid in enhancing voluntary
    compliance with this Act by the violator and other persons similarly
    subject to the Act; and
    5.
    the number, proximity in time, and gravity of previously adjudicated violations of
    this Act by the violator.
    After considering the five factors enumerated in Section 42(h) of the Act, the Board finds that a
    civil penalty is not warranted in this case. First, the Board notes that although any violation of the Act is
    grave, the violations occurring here were of a short-term nature. And although the sewer backups have
    continued, so has the work to correct problems. The Board has no knowledge of sewer backups after
    completion of the sewer work in July 1999.
    The diligence of this community to correct the problems and the over $600,000 already spent
    also indicate that no penalty is necessary. The record does not demonstrate that Durand received any

    8
    economic benefit from noncompliance. And in fact there were comments filed which indicated that
    Durand had been saving money to update the sewers for sometime. Tr. at 363. Additionally, Durand
    has already been working toward compliance voluntarily, and this also indicates that no fine is
    necessary. Finally, the record contains no evidence that Durand was previously adjudicated in violation
    of the Act.
    The Board is also persuaded by the fact that the complainant is not seeking a monetary penalty.
    Rather, the complainant is asking that the Board order specific remedies. Therefore, based on the
    record in this case, wherein the complainant has expended substantial resources to correct problems
    with its sewer system in a diligent manner, the Board will not impose a civil penalty.
    Mulvain has asked for very specific remedies from the Board in this matter. With regards to
    Mulvain’s requests to expedite loan requests and limit expenditures to administration and operation of
    the sewer system, the Board declines to order such remedies. The record does not indicate that there
    are any loan applications pending, nor does the record indicate that sewer funds have been misspent.
    Further, the Board is without authority to direct nonparties to expedite consideration of loan
    applications.
    Mulvain’s request that the Board require annual reporting is unnecessary at this time. Durand
    currently holds a permit issued pursuant to 35 Ill. Adm. Code 309 and Sections 13 and 13.3 of the Act.
    415 ILCS 5/13 and 13.3. As this record indicates, Durand is already filing reports with the Agency
    (see Agency compliance report attached to the motion for summary judgment).
    Mulvain also asks that the Board place Durand on critical review and limit hook-ups. The
    Board’s rules at 35 Ill. Adm. Code 306.403 address the placement of a system on the critical review
    list. Section 306.403 states:
    Critical review shall be defined as the Agency determination pursuant to Section 39 of
    the Act and Section 309.421, that a sewer is a approaching hydraulic capacity or that a
    sewer treatment plant is approaching design capacity, such that additional sewer
    connection permit applications will require close scrutiny to determine whether issuance
    would result in a violation of the Act or regulations. 35 Ill. Adm. Code 306.403.
    Thus, the Board’s rules authorize the Agency to make the decision whether to place a system on critical
    review and as a result limit hook-ups. Because this record is silent as to the current condition of the
    Durand system, the Agency can better determine, through the ongoing evaluation of Durand’s permits,
    whether or not critical review of the Durand system is necessary. The Board will mail a copy of this
    opinion and order to the Agency so that the Agency may determine whether any further action is
    appropriate.
    Finally, Mulvain asks that the Board act as mediator and retain jurisdiction over this matter. The
    Board is reluctant to retain jurisdiction where a final order can achieve the same goal. In this case, we
    will direct that Durand cease and desist from violations of the Act and the Board’s rules. If Durand fails

    9
    to cease and desist, Mulvain may again file a new enforcement action alleging that Durand has violated
    this order as well as any other alleged violations. Thus, the Board need not retain jurisdiction.
    Therefore, the Board finds that directing Durand to cease and desist from further violations of
    the Act and Board regulations is the most appropriate way to remedy these violations and provide
    Mulvain with the remedy he desires. The Board directs that the Village of Durand cease and desist
    from further violations of Section 12 of the Act and 35 Ill. Adm. Code 306.303 and 306.304.
    CONCLUSION
    The Board finds that Durand continued violating Sections 12(a) and (f) of the Act and 35 Ill.
    Adm. Code 306.303 and 306.304, after November 20, 1997. In a previous order, the Board had
    found that Durand had violated Sections 12(a) and (f) of the Act and 35 Ill. Adm. Code 306.303 and
    306.304 prior to November 20, 1997. See, Mulvain v. Village of Durand (March 18, 1999), PCB 98-
    114. After careful review of the Section 33(c) and 42(h) factors (415 ILCS 5/33(c) and 42(h)), the
    Board finds that a civil penalty is not necessary in this case. Therefore, the Board directs Durand to
    cease and desist from further violations of Sections 12(a) and (f) of the Act and 35 Ill. Adm. Code
    306.303 and 306.304.
    ORDER
    The Village of Durand is hereby ordered to cease and desist from any further violations of
    Section 12(a) and (f) of the Environmental Protection Act (415 ILCS 5/12(a) and (f)) and 35 Ill. Adm.
    Code 306.303 and 306.304. The Board directs the Clerk to mail a copy of this opinion and order to
    the Illinois Environmental Protection Agency so that the Illinois Environmental Protection Agency may
    determine whether any further action is appropriate.
    IT IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that the above
    opinion and order was adopted on the 2nd day of March 2000 by a vote of 6-0.
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board