ILLINOIS POLLUTION CONTROL BOARD
March 15, 2001
IBP, Inc.,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 01-88
(Permit Appeal - Air)
ORDER OF THE BOARD (by G. T. Girard):
On November 30, 2000, the parties filed a notice of extension of the 35 day period to
appeal a decision of the Illinois Environmental Protection Agency (Agency). The extension
was granted until March 1, 2001.
This petition for review, filed on March 1, 2001, requests that the Board review
pursuant to Section 39 of the Environmental Protection Act (415 ILCS 5/39) (1998), an air
construction permit issued May 23, 2000, by the Agency regarding the facility owned by IBP,
Inc., located in Joslin, Henry County, Illinois. The Board accepts this matter for hearing.
Hearings shall be scheduled and completed in a timely manner pursuant to the
applicable statutory decision deadline or as extended by waiver (see 415 ILCS 5/40(a)(2)
(1998), 35 Ill. Adm. Code 101.308). Unless otherwise ordered by the hearing officer, the
Agency shall file the record of its review of the permit application within 30 days of notice of
the petition. See 35 Ill. Adm. Code 105.116.
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
the above order was adopted on the 15th day of March 2001 by a vote of 7-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board