ILLINOIS POLLUTION CONTROL BOARD
June 26,
1992
CITY OF TRENTON,
)
)
Petitioner,
)
v.
)
PCB 92—96
)
(Provisional Variance)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD
(by J. Anderson):
This matter comes before the Board on receipt of an Agency
Recommendation dated June 24,
1992.
The recommendation refers to
a request from Petitioner, City of Trenton, for a provisional
variance for its Clinton County facility from the biochemical
oxygen demand
(CBOD5), and suspended solids
(TSS) effluent
requirements, as set forth in ‘35 Ill. Adm. Code 304.120(c)
and
304.141(a),
for the period from when the Petitioner begins
repairing a mechanical breakdown and to allow cleaning and
repainting of the steel components of the plant clarifier and
continuing until the Petitioner returns that unit to service, but
not for longer than 45 days.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions.
The Agency
agrees that the repairs are necessary.
The Agency anticipates
that the requested provisional variance would have minimal
environmental impact on the receiving stream.
The Agency is
unaware of any public water supplies that the requested
provisional variance would adversely impact.
The Agency
maintains that a grant of a provisional variance would violate no
federal laws.
The Agency finds that a denial of the requested
provisional variance would create an arbitrary and unreasonable
hardship on the Petitioner.
The responsibilities of the Agency and the Board in these
short—term provisional variances are different from the
responsibilities in standard variances.
~
Ill. Rev.
Stat.
1989,
ch. 111½,
pars.
1035(b)
&
(c).
In provisional variances it
is the responsibility of the Agency to make the technical
‘determinations and finding of arbitrary or unreasonable hardship.
The Board’s responsibility is to adopt a formal Order, to assure
the formal maintenance of the record, to assure the
enforceability of the variance, and to provide notification of
the action by a press release.
134—397
2
Having received the Agency recommendation finding that a
denial of the requested relief would impose an arbitrary and
unreasonable hardship, the Board hereby grants Petitioner a
provisional variance from 35 Ill. Adm. Code 304.120(c)
and
304.141(a), on the following conditions:
1.
The term of this provisional variance shall commence
when the Petitioner,
City of Trenton, removes the plant
clarifier from service, and it shall expire seven
(7) days
after the date the Petitioner returns the clarifier to
service, or after 45 days have elapsed, whichever comes
first;
2.
During the term of this provisional variance, the
effluent from the Petitioner’s wastewater treatment facility
shall not exceed concentrations of 50 mg/l CBOD5 or 30 mg/i
TSS
(each on a concentration basis);
3.
The Petitioner shall notify Christopher Port of the
Agency’s Collinsville Regional office by telephone,
at
618/346—5120, when it removes its plant clarifier unit from
service and when it returns the unit to service, and the
Petitioner shall confirm this notice in writing within five
days, addressed as follows:
Illinois Environmental Protection Agency
Division of Water Pollution Control
Compliance Assurance Section
2200 ‘Churchill~Road
P.O. Box 19276
Springfield,
Illinois
62794—9276
Attention:
Barbara Conner
4.
The Petitioner shall perform the necessary maintenance
work as expeditiously as possible and operate its plant
during the term of this provisional variance in a manner
that assures the best effluent practicable;
and
5.
The Petitioner shall execute a copy of a Certificate of
Acceptance of this provisional variance and forward that
copy to the Agency addressed as is the written notice
required in the above condition; the Petitioner shall
forward that copy within 10 days of the date of this Order
of the Board,
and the Certificate of Acceptance shall take
the following form:
134—398
3
CERTIFICATION
I
(We),
,
hereby accept
and agree to be bound by all terms and conditions of the Order of
the Pollution Control Board in PCB 92-96. June
26.
1992.
Petitioner
authorized Agent
ritle
Date
IT IS SO ORDERED.
I, Dorothy M. Gunn,
Clerk of the Illinois Pollution Control
Board, do hereby certify that the above order was adopted on the
~
day of ___________________________,
1992, by a vote of
Dorothy N. ~‘(inn,Clerk
Illinois Pollution Control Board
134—399