ILLINOIS POLLUTION CONTROL BOARD
October
6,
1983
IN THE MATTER OF:
)
PROPOSED AMENDMENT TO
)
R 83-9
35 ILL.
ADM. CODE 602.113(c)
TO ALLcY,~ALGICIDE PERMITS
)
GREATER DURATION
)
PROPOSED RULE.
SECOND NOTICE.
ORDER OF
THE BOARD
(by W.
J.
Nega):
The rules adopted for First Notice on July
26,
1983 in this
matter were published on August 19,
1983 in the Illinois Register,
Volume
7,
Issue
34.
First Notice expired on October
4,
1983.
Only one public comment on the proposed Opinion and Order was
received which was from the Administrative Code Unit of the
Illinois Secretary of State.
The Secretary of State’s Office
suggested that,
under the new rules on rulemaking procedures, the
entire table of contents for Part 602:
Permits should be included
along with the Board’s main source notes.
Additionally, slight
changes
in two of the source notes were suggested.
The Board
will incorporate the suggestions of the Secretary of State into
the Proposed Opinion and Order and will hereby adopt the proposed
regulation
for Second Notice pursuant to Section
5.01(b) of the
Illinois Administrative Procedure Act
(Ill.
Rev. Stat.
1981,
ch.
127,
par.
1005.1(b),
as amended).
The Board hereby proposes
to adopt the following rule, second
notice which amends Section 602.110 and Section 602.113(c) of
Title 35:
Environmental Protection,
Subtitle
F:
Public Water
Supplies as
follows:
Section 602.110
Algicide Permits
a)
All applications
for algicide permits shall
contain:
~+
1)
the name and certificate number of the
certified operator supervising the application
of the algicide,
2)
a statement describing the extent of the algae
problem, history of any past algae problems, and
algicide treatments, and a description of any
fish kills which have resulted from treatments
in the past;
and
54-213
—2—
e±
3)
adequate information to support exceeding the
limits as stated
in 35 Ill. Mm. Code 302:
Water Quality Standards.
b)
After
any algicidej~ermitis
issued,
and_before the
—
permit ex~piresby its stated terms,
if there
is any
major chapq~either inthe~eration of the public
water supply, or in algae growth, which affects the
use of copper sulfaE~as outlined in~ff~~rmTt,
the
pj4~ersyj~jyshal
1 submit an
appiication
for
modification of
its~permit.
This application shall
contain all
of the information required by this sub-
section
(b)
and subsection
(a)
above.
(Source:
~mended at 7
Iii. Req.___
,
effective____
Section 602.113
Duration
a)
Construction permits
-
Construction permits for
supply facilities shall
be valid
for the start
of construction within one year from the date of
issuance and may be renewed for additional one
year periods at the discretion of the Agency.
Construction, once started, may continue for
four years without permit renewal and may he renewed
for periods specified by the Agency at its discre-
tion for each permit renewal.
b)
Operation Permits
—
Operation Permits shall
be valid
until revoked unless otherwise stated in the permit.
c)
Algicide Permits
—
Algicide permits shall be valid
for the period stated
in the permit, but
in
no case
longer than e~efive years.
(Source:
?~mendedat
7
Ill. Req.,
effective
___
.)
IT
IS SO ORDERED.
I, Christan L.
Moffett, Clerk of the Illinois Pollution
Control Bqard, hereby c9rt1ify
that the above Order was 1adopted
on the
~
day of ~
1983 by
a vote of ~Y~O
7’.
/~
/
I
/
r~,
_______
Christan L.
Moffétt,, Clerk
Illinois Pollution Control Board
54-214