ILLIt~OISPOLLUTION CONTROL BOARD
    September
    5,
    1985
    WOODSTOCK DIE CASTING,
    Petitioner,
    v.
    )
    PCB 84—134
    ILLINOIS ENVIRONMENTAL
    )
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD
    (by J.
    Theodore Meyer):
    This matter comes before the Board on a motion for
    continuance
    of this variance proceeding made by petitioner
    at
    hearing held in
    this matter on July
    30,
    1985.
    The continuance
    is
    requested for
    the
    time period
    necessary for the Agency
    to
    determine whether
    to grant petitioner
    an operating permit
    (plus
    14 days,
    if denied)
    which
    if issued would obviate the need
    for
    variance relief.
    Petitioner has committed
    to apply for
    such
    permit by September
    1,
    1985 and has waived decision
    in this
    matter
    until March
    27, 1986.
    Accordingly,
    the motion
    is granted
    and this matter
    is continued until
    the Agency has made
    a permit
    determination but in no event
    shall continuance extend beyond
    January 15,
    1986.
    The parties shall
    apprise the Board
    once
    a
    permit decision has been made, and
    if denied,
    a hearing shall
    be
    scheduled on the variance petition within
    two weeks of denial.
    IT
    IS SO ORDERED.
    I,
    Dorothy
    M.
    Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certify that~the above Order was adopted on
    the
    ~5~-
    day of
    __________________,
    1985,
    by a vote
    of
    ______.
    /1?,
    ~
    Dorothy
    M. Gi~n,Clefk
    Illinois PoLtution Control Board
    65-403