ILLINOIS POLLUTION CONTROL BOARD
September 6
,
1979
INTERNATIONAL MINERALS
&
)
CHEMICAL
CORPORATION,
Petitioner,
v.
)
PCB
79—150
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by Dr.
Satchell):
It is the Order of the Pollution Control Board that Petitioner
International Minerals and Chemical Corporation is granted a var-
iance for eighteen months from the provisions of §505, Part V1
Chapter 2:
Air Pollution subject to the following conditions:
1.
The Petitioner shall submit to the Board a report from
a competent expert that the National .kmbient Air Quality
Standards will not be adversely affected as a result of
the granting of this Order.
2.
Only the FNH material presently stored at the Marion site
shall be burned.
3.
During the time of such burning the Petitioner shall have
at least two
(2)
trained men on the site who shall be
equipped with adequate fire fighting equipment to provide
fire protection.
The neighboring fire department
shall
be placed on a standby basis
to prevent spread of fire.
4.
The burning shall be conducted under the direction of
personnel trained in explosive burning procedures and
shall be carried
out between the hours of
8
a.m.
and
3 p.m.
5.
Petitioner shall follow all procedures outlined in
Technical Order #llA-l-34, Department of the Army and
Air Force, Washington,
D.C.,
28th of November,
1967
pertaining to the disposal, destruction and decontamina-
tion of explosives outlined in Exhibit 3 of the Petition—
er’s variance for the disposal of explosive waste.
35—331
—2—
6.
Not more than 20,000 pounds of FNH material shall be
burned per day,
and not more than 5000 pounds of explosive
shall be burned at any one time.
7.
Petitioner shall notify the Agency’s Region
3 office via
telephone
(618)
345—0700 on the day of the scheduled
burning before burning takes place.
8.
Petitioner shall notify the local office of the United
States Department of the Interior, Fish and
Wildlife
Service, on the day of the burning before burning takes
place.
9.
If ambient air quality or weather conditions are not
favorable to burning, the manager of the Agency’s Region
3 office or his representative shall have the right to
instruct the Petitioner to postpone the burning.
10.
Petitioner shall file quarterly reports with the Agency’s
Region
3 Office at ll5A West Main Street, Collinsville,
Illinois 62234 listing the amount of material burned on
each specific day that burning took place during the
quarterly period.
11.
Within ninety days of the date of this Order, Petitioner
shall set forth in a letter to the Agency a complete list
of all materials and facilities
at the site which may
require open burning within the next five years.
12.
The Petitioner shall within forty-five days of the date
of this Order, execute and forward to the Air Pollution
Control Division, Environmental Protection Agency, 2200
Churchill Road,
Springfield,
Illinois 62706
a Certificate
of Acceptance and Agreement to be bound to all terms and
conditions of this variance.
This forty-five day period
shall be held in abeyance for any period this matter is
being appealed.
The form of the certificate
shall be as
follows:
35—332
—3—
CE RTIFl CATI ON
I,
(We),
,
having
read
and
fully
understanding
the
Order
in
PCB
79-150,
hereby
accept
that Order and agree to be bound by all of its terms and conditions.
SIGNED
TITLE
DATE
I, Christan L.
Moffett, Clerk of the Illinois Pollution
Cont1zol Board,
h
________
_______________,
1979 by
a vote of
_________
(,t~
day of ~
the above Order was ad~tedon the
Illinois
Pollut.
trol
Board
35—333