ILLINOIS POLLUTION CONTROL BOARD
    June
    27,
    1974
    CATERPILLAR
    TRACTOR
    CO.,
    )
    (Joliet
    Plant)
    )
    )
    Petitioner,
    )
    )
    vs.
    )
    PCB
    74—233
    )
    ENVIRONMENTAL
    PROTECTION
    AGENCY,
    )
    )
    Respondent.
    )
    ORDER
    OF
    THE
    BOARD
    (by
    Mr.
    Dumelle):
    Petition filed June 19,
    1974 is
    inadequate
    in
    that
    it does not
    state the reason for the delay elapsed in bringing the BOD5 discharge
    into compliance with the Water Pollution Regulations.
    Petitioner shall amend the petition in within 35 days from the
    date
    of
    this
    order
    to
    detail
    and
    expand
    upon the reasons
    for the
    delay
    in
    not
    sooner
    engaging
    a
    consulting
    engineer
    and
    in
    devising
    a
    program
    to
    meet
    the
    Regulations.
    The
    90—day
    period
    for
    decision
    set
    by
    statute
    shall
    run
    from
    the
    date
    of
    submission
    of
    the
    amended
    petition.
    Failure
    to
    timely
    file
    the
    additional
    information
    shall
    make
    the
    petition
    liable
    to
    dismissal
    for
    inadequacy.
    IT
    IS
    SO
    ORDERED.
    I,
    Christan
    L. Moffett,
    Clerk
    of
    the
    Illinois
    Pollution
    Control
    Board,
    hereby
    certify
    the
    above
    Order
    was
    adopted
    this
    ~7~”
    day
    of
    ____________
    1974 by a vote of
    ~I
    to 0
    12
    —651