ILLINOIS
POLLUTION
CONTROL
BOARD
January
24,
1980
ROY
B.
FELDKANP
AND JOANN FELDKA~
AND
CITY
OF
ALTAMONT,
)
Petitioners,
)
PCB 80-10
ENVIRONMENTAL PROTECTION AGENCY,
)
Respondent.
ORDER OF THE BOARD
(by
Mr. Dumelle):
On
January
14,
1980 Petitioners Roy B. Feldkamp and Joann
Feldkamp requested a variance to permit construction and oper-
ation of a sewer extension to connect to the City of Altamont
sewerage system. On its own
motion
the Board has
determined that
a complete determination of this matter cannot
be had without the
presence of the City of Altamont as
a party. Consequently,
the
City of Altamont is hereby joined as
a Petitioner.
The Petition does not adequately address the environmental
impact this variance would cause.
The Petition does not state
the reasons
why
the City of Altamont has been placed on re-
stricted status and the extent of non-compliance. If these de-
ficiencies are not corrected in an amended petition within 45
days of thie date of this Order,
this matter will be
subject
to dismissal, The statutory 90 day decision period shall run
from the date an amended petition is filed.
IT
IS SO
ORDERED.
I, Christan L.
Moffett, Clerk
of the Illinois Pollutiop Control
Board,
hereby certify the above Order was adopted on the~~dayof
January,
1980
by
a vote
Illinois Pollu
Control Board
3
7—205