1
    BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    2
    3 IN THE MATTER OF:
    )
    )
    4 PROPOSED NEW 35 ILL. ADM. )
    CODE 225 CONTROL OF
    )
    5 EMISSIONS FROM LARGE
    ) R06-25
    COMBUSTION SOURCES
    ) (Rulemaking - Air)
    6 (MERCURY)
    )
    7
    8
    HEARING DAY SIX
    9 Proceedings held on June 19, 2006, at 9:08 a.m., at the
    Illinois Pollution Control Board, 1021 North Grand Avenue
    10 East, Springfield, Illinois, before Marie E. Tipsord,
    Hearing Officer.
    11
    12
    13
    14
    Reported By: Karen Waugh, CSR, RPR
    15
    CSR License No: 084-003688
    16
    KEEFE REPORTING COMPANY
    11 North 44th Street
    17
    Belleville, IL 62226
    (618) 277-0190
    18
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company

    1
    APPEARANCES
    2
    Board Members present:
    3
    Chairman G. Tanner Girard
    4 Board Member Andrea S. Moore
    Board Member Thomas E. Johnson
    5
    6 Board Staff Members present:
    7 Anand Rao, Senior Environmental Scientist
    Timothy Fox
    8 Erin Conley
    Connie Newman
    9 Matt Reed
    10
    ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
    11
    BY: Mr. John J. Kim
    Managing Attorney
    12
    Air Regulatory Unit
    1021 North Grand Avenue East
    13
    Springfield, Illinois 62794-9276
    On behalf of the Illinois EPA
    14
    BY: Mr. Charles E. Matoesian
    15
    Assistant Counsel
    Division of Legal Counsel
    16
    1021 North Grand Avenue East
    Springfield, Illinois 62794-9276
    17
    On behalf of the Illinois EPA
    18
    BY: Ms. Gina Roccaforte
    Assistant Counsel
    19
    Division of Legal Counsel
    1021 North Grand Avenue East
    20
    Springfield, Illinois 62794-9276
    On behalf of the Illinois EPA
    21
    SCHIFF HARDIN LLP
    22
    BY: Mr. Stephen J. Bonebrake
    Attorney at Law
    23
    6600 Sears Tower
    Chicago, Illinois 60606
    24
    On behalf of Dynegy and Midwest
    Generation
    Keefe Reporting Company
    2

    1
    BY: Ms. Kathleen C. Bassi
    Attorney at Law
    2
    6600 Sears Tower
    Chicago, Illinois 60606
    3
    On behalf of Dynegy and Midwest
    Generation
    4
    BY: Mr. Sheldon A. Zabel
    5
    Attorney at Law
    6600 Sears Tower
    6
    Chicago, Illinois 60606
    On behalf of Dynegy and Midwest
    7
    Generation
    8
    DYNEGY INC.
    BY: Mr. Jim Ingram
    9
    Senior Corporate Counsel
    1000 Louisiana Street, Suite 5800
    10
    Houston, Texas 77002
    On behalf of Dynegy Inc.
    11
    JENNER & BLOCK
    12
    BY: Mr. Bill S. Forcade
    Attorney at Law
    13
    One IBM Plaza
    Chicago, Illinois 60611-7603
    14
    On behalf of Kincaid Generation, LLC
    15
    MCGUIRE WOODS LLP
    BY: Mr. David L. Rieser
    16
    Attorney at Law
    77 West Wacker Drive, Suite 4400
    17
    Chicago, Illinois 60601-1681
    On behalf of Ameren Energy Generating
    18
    Company, AmerenEnergy Resources
    Generating Company and Electric Energy,
    19
    Inc.
    20
    BY: Mr. James T. Harrington
    Attorney at Law
    21
    77 West Wacker Drive, Suite 4400
    Chicago, Illinois 60601-1681
    22
    On behalf of Ameren Energy Generating
    Company, AmerenEnergy Resources
    23
    Generating Company and Electric Energy,
    Inc.
    24
    Keefe Reporting Company
    3

    1
    ENVIRONMENTAL LAW & POLICY CENTER
    BY: Ms. Faith E. Bugel
    2
    Staff Attorney
    35 East Wacker Drive, Suite 1300
    3
    Chicago, Illinois 60601-2110
    On behalf of the Environmental Law &
    4
    Policy Center
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company
    4

    1
    INDEX
    2 WITNESS
    PAGE NUMBER
    3
    Jim Ross
    8
    4
    IEPA panel
    5 (Jim Ross, Rob Kaleel, Jeffrey
    Sprague, Christopher Romaine)
    118
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company
    5

    1
    EXHIBITS
    2 NUMBER
    MARKED FOR I.D.
    ENTERED
    3 Exhibit No. 35
    22
    22
    4 Exhibit No. 36
    207
    207
    5 Exhibit No. 37
    232
    232
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company
    6

    1
    PROCEEDINGS
    2
    (June 19, 2006; 9:08 a.m.)
    3
    HEARING OFFICER TIPSORD: Good morning,
    4 everyone. Welcome back to Springfield, and for those of
    5 you who live here, good morning. My name is Marie
    6 Tipsord, and I'm the hearing officer in RO6-25. We were
    7 in hearing all last week, and so this is day six.
    8
    To my right -- or to my left is Dr. Tanner Girard
    9 and to my right is Board Member Andrea Moore. They are
    10 the presiding board members. To Dr. Girard's far left is
    11 Thomas Johnson, one of our board members, and also Anand
    12 Rao from our technical unit, and Tim Fox, Andrea Moore's
    13 assistant. Erin Conley is here today, as is Connie
    14 Newman, and Matt Reed is here with us today also from the
    15 Board's staff.
    16
    As I said, this is day six. I don't see too many
    17 new faces, so I'm not going to go through all the
    18 procedural stuff. If you have any questions, don't
    19 hesitate to ask at any time. Just let me acknowledge
    20 you. And we do have a new court reporter today, so
    21 please state your name and who you represent before you
    22 ask any questions, and with that, I guess we're ready to
    23 go.
    24
    Mr. Kim?
    Keefe Reporting Company
    7

    1
    MR. KIM: Thank you. As we indicated last
    2 week, Jim Ross of the Illinois EPA will be resuming
    3 testimony, and he will now move and we are going to move
    4 with the quickest dispatch possible to get the Agency
    5 general questions done. We're going to begin with the
    6 general questions that were presented to the Agency by
    7 Dynegy and Midwest Generation.
    8
    HEARING OFFICER TIPSORD: Okay. May I
    9 remind you, Mr. Ross, you're still under oath.
    10
    MR. ROSS: Yes. And again, these are the
    11 general questions presented to the Agency by Dynegy.
    12
    Number 1, "Has the Agency assessed or is it aware
    13 of any assessment regarding what portion of mercury
    14 deposition in the state of Illinois is due to sources
    15 within the state of Illinois?" No, we have not made such
    16 an assessment and are not aware of any such assessment to
    17 determine what portions or amount of deposition in
    18 Illinois is from Illinois sources. We have determined
    19 that coal-fired power plants are large emission sources
    20 of mercury and that some level of this mercury is
    21 deposited in Illinois. 1a.
    22
    HEARING OFFICER TIPSORD: Excuse me.
    23 Mr. Bonebrake?
    24
    MR. BONEBRAKE: What is the basis for the
    Keefe Reporting Company
    8

    1 testimony that you said some portion of these emissions
    2 are deposited in Illinois?
    3
    MR. ROSS: Well, we conducted some of our
    4 own research. We spoke with experts, read literature,
    5 and you listened to testimony last week from Marcia
    6 Willhite and Dr. Keeler where they went into some details
    7 on this, in some cases excruciating detail. In
    8 particular they cited the Massachusetts and Florida
    9 studies and -- well, that's actually part of question "a"
    10 here. It says, "If so, please describe each assessment
    11 and the related results," and again, we've done our own
    12 research. We spoke with experts and we've reached that
    13 conclusion, and we believe that the Technical Support
    14 Document expresses that to a large degree. It's also in
    15 the prefiled testimony and the testimony to this hearing.
    16 All of them will put forward the weight of evidence that
    17 Illinois sources are in fact contributing to the mercury
    18 deposition in the state.
    19
    HEARING OFFICER TIPSORD: Ms. Bassi?
    20
    MS. BASSI: Okay. I'm Kathleen Bassi for
    21 Schiff Hardin, or with Schiff Hardin. Mr. Ross, what was
    22 the nature of the research, please?
    23
    MR. ROSS: Our staff conducted research.
    24
    MS. BASSI: Like, what did they do?
    Keefe Reporting Company
    9

    1
    MR. ROSS: They spoke to numerous experts.
    2 They looked at the literature and they looked a lot at
    3 what USEPA had done on this issue. They spoke with other
    4 states, referred -- looked at other reports such as the
    5 Michigan report that's been cited a number of times. We
    6 looked at the Florida study, the Massachusetts study,
    7 spoke with STAPPA/ALAPCO representatives, Praveen Amar
    8 from NESCAUM, numerous things.
    9
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    10
    MR. BONEBRAKE: Would it be fair, then,
    11 Mr. Ross, to characterize your answer to this question to
    12 mean that while the Agency believes that some portion of
    13 the mercury emitted by EGUs in the state comes down in
    14 the state, the Agency really has no idea of the quantity
    15 of the mercury emissions emitted by Illinois EGUs that
    16 comes down in Illinois?
    17
    MR. ROSS: Well, we believe the quantity can
    18 be significant. There's a likelihood of that, and we
    19 base that on the Florida and Massachusetts studies and
    20 Dr. Keeler's testimony. Again, we went into that in
    21 detail. But certainly a portion of what is emitted is
    22 deposited in Illinois. I mean, I think one critical fact
    23 is that 100 percent of all the mercury that is emitted
    24 from power plants is deposited at some time or another,
    Keefe Reporting Company
    10

    1 some place or another. Whether it's in Illinois or
    2 outside Illinois is subject for debate.
    3
    HEARING OFFICER TIPSORD: Go ahead. I'm
    4 sorry. Mr. Rieser.
    5
    MR. RIESER: You've described --
    6
    HEARING OFFICER TIPSORD: Mr. Rieser,
    7 identify yourself for the court reporter.
    8
    MR. RIESER: Oh. David Rieser, McGuire
    9 Woods, on behalf of Ameren. You described the research
    10 that's been done and the testimony in support as being
    11 the information presented by Ms. Willhite and Dr. Keeler,
    12 the Massachusetts and the Florida studies. Are there
    13 other studies -- and then the Michigan report as well,
    14 all of which have been presented to the Board. Are there
    15 other studies that have not been presented to the Board
    16 on which you've relied?
    17
    MR. ROSS: I mean, probably the most
    18 appropriate person to answer that -- and she did to some
    19 degree -- was Marcia Willhite. We relied on her a great
    20 deal to conduct this type of research.
    21
    MR. RIESER: So whatever her testimony was
    22 in this regard, that's the extent of the research that
    23 was done; is that correct?
    24
    MR. ROSS: Plus what I've said here, yes.
    Keefe Reporting Company
    11

    1
    MR. RIESER: Is there anything that's --
    2 that you looked at or to your knowledge that Miss
    3 Willhite looked at that has not been identified and
    4 presented to the Board, any research?
    5
    MR. ROSS: Not that I can recall at this
    6 time.
    7
    HEARING OFFICER TIPSORD: Mr. Zabel?
    8
    MR. ZABEL: Sheldon Zabel. Just to be
    9 clear, Mr. Ross, the Agency did no Illinois-specific
    10 dispersion or deposition analysis; is that correct?
    11
    MR. ROSS: I believe Marcia Willhite spoke
    12 that we had started a study but not completed it, but the
    13 answer to your question, though, is yes, we completed no
    14 study.
    15
    MR. ZABEL: Thank you.
    16
    HEARING OFFICER TIPSORD: That does remind
    17 me that that was one of the things you were supposed to
    18 be checking on, was the map?
    19
    MR. KIM: We are still efforting.
    20
    HEARING OFFICER TIPSORD: Thank you.
    21
    MR. ROSS: Question 2. And mind you,
    22 there's well over 100 questions.
    23
    MR. RIESER: One more.
    24
    HEARING OFFICER TIPSORD: Excuse me.
    Keefe Reporting Company
    12

    1 Mr. Rieser?
    2
    MR. RIESER: And then when -- you used the
    3 term significant, but it's correct that there's no
    4 quantification on that term.
    5
    MR. ROSS: There has been no quantification,
    6 but again, Dr. Keeler indicated that as much as 70
    7 percent of the deposition that they measured was traced
    8 back to power plants, and Florida and Massachusetts study
    9 indicated that when you control mercury from local
    10 sources, you do see a reduction in the methylmercury in
    11 fish tissue in different percentages, which Marcia
    12 Willhite and Dr. Keeler both spoke to.
    13
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    14
    MR. BONEBRAKE: Mr. Ross, is it correct that
    15 in the Florida study, the emission reductions were from
    16 incinerators and/or waste combustors and not from EGUs?
    17
    MR. ROSS: Yes, that's correct. That's been
    18 well established.
    19
    MR. BONEBRAKE: And isn't it true that
    20 there's a difference in deposition pattern with respect
    21 to mercury emissions from EGUs as opposed to incinerators
    22 and combustors?
    23
    MR. ROSS: I am not an expert in that area.
    24 I can't speak to that. I believe it is true to some
    Keefe Reporting Company
    13

    1 degree, but I certainly couldn't elaborate on it.
    2
    HEARING OFFICER TIPSORD: Mr. Rieser?
    3
    MR. RIESER: And it's also true that when
    4 Dr. Keeler talked about 70 percent of the deposition at
    5 Steubenville being from local and regional sources -- and
    6 he spent an inordinate amount of time on this issue -- as
    7 far as I could tell, he was talking about sources within
    8 the eastern United States, correct?
    9
    MR. ROSS: I agree that we spent a large
    10 amount of time on it. I believe your statement is
    11 correct, yes.
    12
    MR. RIESER: Thank you.
    13
    HEARING OFFICER TIPSORD: And if I may
    14 interrupt, I do understand you're wanting to get your
    15 points across, but I really don't think there's much to
    16 be gained by asking this witness what Dr. Keeler or Miss
    17 Willhite said. I think the record speaks for itself, and
    18 I will allow you some latitude, but we really are not
    19 going to revisit their testimony through Mr. Ross today.
    20
    MR. RIESER: Understood. Thank you.
    21
    HEARING OFFICER TIPSORD: Thank you.
    22
    MR. ROSS: Question 2, "Has the Agency
    23 assessed or is it aware of any assessment regarding what
    24 portion, if any, of the mercury present in tissue of fish
    Keefe Reporting Company
    14

    1 in the state of Illinois is due to mercury emissions in
    2 the state of Illinois as opposed to in other states or
    3 countries?" And no, we have not made and are not aware
    4 of such an assessment.
    5
    2a, "If so, please describe all such assessments
    6 and the related results." And I answered in the negative
    7 there too, so it's not applicable.
    8
    B, "If so, please provide copies of all
    9 documentation of such assessments and results." And as I
    10 mentioned earlier, all the assessments that we have made
    11 are documented in the Technical Support Document,
    12 prefiled testimony and the testimony provided at this
    13 hearing.
    14
    3, "With the closing of the Northwest and Robbins
    15 incinerators, what was the effect on mercury deposition
    16 in Illinois?" And to the extent that these incinerators
    17 emitted mercury and contributed to deposition, such
    18 deposition was reduced, but we have not attempted to
    19 quantify this amount.
    20
    HEARING OFFICER TIPSORD: Mr. Zabel?
    21
    MR. ZABEL: Just to make clear, Mr. Ross,
    22 you haven't made any -- there was no attempt to quantify
    23 what those emissions were, let alone the deposition from
    24 those emissions; is that correct?
    Keefe Reporting Company
    15

    1
    MR. ROSS: That is correct.
    2
    HEARING OFFICER TIPSORD: Ms. Bassi?
    3
    MS. BASSI: Mr. Ross, I don't recall -- and
    4 perhaps you will -- was mercury one of the constituents
    5 for which the Robbins incinerator -- and maybe the
    6 Northwest, but more likely the Robbins incinerator had to
    7 report emissions?
    8
    MR. ROSS: I don't recall either. Sorry.
    9
    MS. BASSI: Is that something you could find
    10 out?
    11
    MR. ROSS: Probably. I mean, I'd have to
    12 speak with staff that were involved in that. I mean,
    13 that was a major issue here in the Bureau of Air, so
    14 there are some staff members that are intimately familiar
    15 with all aspects of the Robbins incinerator and what
    16 occurred, so -- Chris Romaine was one of those staff
    17 members, I'm sure you're aware, and he will be testifying
    18 here, perhaps today if we get to that, and he could
    19 probably speak to that, yeah.
    20
    MS. BASSI: Thank you.
    21
    MR. ROSS: 3a, "How did the Agency make its
    22 determination regarding the effect on mercury
    23 deposition?" And this question is regarding the Robbins
    24 incinerator. No determination was made to the best of my
    Keefe Reporting Company
    16

    1 knowledge.
    2
    4, "What is the operating status of the medical
    3 waste incinerator in or slightly east of Clinton,
    4 Illinois?" And this source is operating.
    5
    Questions 5 through 8, Marcia Willhite and Tom
    6 Hornshaw I believe had almost identical questions to --
    7
    HEARING OFFICER TIPSORD: Excuse me.
    8 Mr. Ross, Ms. Bassi has a follow-up.
    9
    MS. BASSI: In number 4 --
    10
    MR. ROSS: 4, yeah.
    11
    MS. BASSI: -- the Clinton's medical waste
    12 incinerator, do you know if mercury is one of the
    13 constituents they monitor for?
    14
    MR. ROSS: I do not know the answer to that.
    15
    MS. BASSI: Is that something Mr. Romaine
    16 would know?
    17
    MR. ROSS: In all likelihood, yes.
    18
    MS. BASSI: Okay. And I'm sorry. What did
    19 you answer for 4a?
    20
    MR. ROSS: The source is operating.
    21
    MS. BASSI: No, "a" talks about monitoring.
    22
    HEARING OFFICER TIPSORD: 4a and b
    23 specifically asks about ambient operating.
    24
    MS. BASSI: Ambient monitoring.
    Keefe Reporting Company
    17

    1
    MR. ROSS: Okay. 4a, "Is the Agency
    2 monitoring ambient mercury in the vicinity of that
    3 incinerator?" No, we are not.
    4
    B, "What are the results of the monitoring?"
    5 There are none.
    6
    HEARING OFFICER TIPSORD: Go ahead.
    7
    MS. BASSI: Madam Hearing Officer, Mr. Ross
    8 has mentioned for questions 3 and 4 that Mr. Romaine
    9 would be the appropriate person to ask these questions
    10 of, and so can we come back to that when he appears?
    11
    HEARING OFFICER TIPSORD: Absolutely.
    12
    MS. BASSI: Thank you.
    13
    HEARING OFFICER TIPSORD: And questions 5
    14 through 8 were answered by Miss Willhite, so we move on
    15 to question number 9.
    16
    MR. ROSS: Okay. Question 9, "On page 107
    17 of the TSD" -- which is an acronym for Technical Support
    18 Document -- "Table 7.1 omits Wood River and two of the
    19 Will County units. Why were these units omitted?" This
    20 actually appears to be a software error. When we pull
    21 the document up on the computer, those units are
    22 included. Apparently, when you print the unit out, they
    23 do not show up, so we are working to resolve that, but
    24 that in fact was an omission that we are working to
    Keefe Reporting Company
    18

    1 correct. Partial omission I guess would best describe
    2 it.
    3
    Question 10, "How does the size of the ESP at
    4 Yates, discussed on page 134 of the Technical Support
    5 Document, compare to EPSs in Illinois?" And I believe
    6 this question is best answered by Dr. Staudt.
    7
    HEARING OFFICER TIPSORD: Before you go on,
    8 Mr. Ross, could you -- for the court reporter, what is
    9 ESP?
    10
    MR. ROSS: It's an electrostatic
    11 precipitator. It's a particulate matter control device
    12 utilized by EGUs or by coal-fired power plants in their
    13 units. EGUs is electric generating units.
    14
    HEARING OFFICER TIPSORD: Thank you.
    15
    MR. ROSS: Question 11, "Has Sorbent
    16 Technologies tested its products in operations in
    17 different seasons and different climates and for long
    18 periods of time equating to permanent use?" And I
    19 believe this question is best answered by Sid Nelson, who
    20 will be here testifying. He is the CEO/president of
    21 Sorbent Technologies.
    22
    Question 12, "Does the Agency assume only the
    23 installation of ACI in its cost estimates of the control
    24 options available on page 147 of the Technical Support
    Keefe Reporting Company
    19

    1 Document?" And the answer to this is no. We will be
    2 going over this in detail in the coming days when
    3 Dr. Staudt will be here, and that's the -- probably the
    4 most appropriate time to answer this question. Again,
    5 we'll be going over the controls and costs in detail.
    6 And I won't be skipping over all of these questions and
    7 deferring them to later, but we just ran into a batch of
    8 them.
    9
    HEARING OFFICER TIPSORD: ACI, court
    10 reporter?
    11
    MR. ROSS: Activated carbon injection.
    12
    HEARING OFFICER TIPSORD: Thank you.
    13
    MR. ROSS: "On page 157 of the TSD, the
    14 Agency states that allowances purchased under CAMR from
    15 out-of-state sources that have excess allowances would
    16 have a -- quote, have a cost reflecting at least the cost
    17 of implementing control technology, unquote. What is the
    18 basis of this statement?" Again, that statement is in
    19 the portion of the Technical Support Document written by
    20 Dr. Staudt, I believe. It's his statement. He is the
    21 most appropriate person to answer that.
    22
    Question b, "Is the generally held theories
    23 relative to emissions trading the following, that sources
    24 would not buy allowances for purposes of compliance
    Keefe Reporting Company
    20

    1 unless either, 1, they had an unforeseen event occur
    2 requiring additional allowances, or 2, the cost of
    3 allowances is cheaper than the cost of controlling?" And
    4 again, all of this is related to question 13, so -- and
    5 we will be discussing that in the -- when we go over the
    6 cost of controls.
    7
    HEARING OFFICER TIPSORD: Mr. Ross, it might
    8 be easier, for those questions that you are going to
    9 defer to someone else, there's no need to read them into
    10 the record at this time.
    11
    MR. ROSS: To skip them? Okay. Thank you.
    12 Question 14, "Which are the must-run and black start
    13 units?" And the Agency intentionally did not identify
    14 these units due to homeland security issues. The
    15 Regional Transmission Organization representatives that
    16 we consulted with suggested that we not disclose these
    17 facilities any more than what we have done so in the
    18 Technical Support Document where we discuss them. We
    19 agree that disclosing these facilities could pose a
    20 homeland security risk, as disruption of operations of
    21 any of these units jeopardizes the electricity grid.
    22
    Question 15 --
    23
    MR. KIM: I'm sorry. Before you go on,
    24 before we get too far down the road, question -- gosh --
    Keefe Reporting Company
    21

    1 question number 9 asked about a table, and as Mr. Ross
    2 indicated, we had some computer problems, but I have a
    3 complete copy of the table, so let me hand that out now
    4 before we get too far away from it.
    5
    HEARING OFFICER TIPSORD: And for purposes
    6 of the record, that table in question number 9 is the one
    7 on page 107 of the Technical Support Document, Table 7.1.
    8 We will mark this as Exhibit 34 if there's no objection.
    9 Okay. On -- Let me double-check the record. I think I
    10 may have my exhibit numbers off.
    11
    MS. BASSI: 35.
    12
    HEARING OFFICER TIPSORD: I in fact have my
    13 exhibit numbers off. Thank you very much. It's Exhibit
    14 No. 35 if there's no objection. Seeing none, this will
    15 be Exhibit No. 35.
    16
    MR. KIM: Sorry for the disruption.
    17
    HEARING OFFICER TIPSORD: That's okay. Go
    18 ahead, Mr. Ross.
    19
    MR. ROSS: Question 15, "How does the Agency
    20 compare or offset the economic impacts of the closure of
    21 some plants to the claimed gains from the installation
    22 and operation of new equipment?" The Agency makes no
    23 attempt to compare or offset the economic impacts of any
    24 plant closures with potential gains from other areas. We
    Keefe Reporting Company
    22

    1 have simply identified areas that could be potentially
    2 impacted by the rule. We have added flexibility in the
    3 rule wherever reasonable in order to minimize the
    4 potential for any plant closures. It is not our intent
    5 that the rule result in any plant closures and we do not
    6 feel that it necessarily will.
    7
    15a, "Wouldn't installation of control equipment
    8 be only temporary employment at a given plant?" Yes, the
    9 installation of control equipment would be only temporary
    10 employment. However, service and maintenance would more
    11 than likely be ongoing activities.
    12
    HEARING OFFICER TIPSORD: Mr. Zabel?
    13
    MR. ZABEL: Can you quantify what the extent
    14 of additional maintenance costs and operational costs
    15 would be?
    16
    MR. ROSS: I believe that's discussed in
    17 some detail in Section 8 of the Technical Support
    18 Document. It's included in the cost calculations. It's
    19 not something I can readily pull off the top of my head
    20 and speak to, but I'm sure Dr. Staudt will be speaking to
    21 that and be able to answer those questions. That was
    22 part of his cost assessment.
    23
    MR. ZABEL: Would that also be true,
    24 Mr. Ross, for any impact that operation and maintenance
    Keefe Reporting Company
    23

    1 will have on additional employment?
    2
    MR. ROSS: No. That was something that we
    3 identified as a potential benefit. We made no attempt to
    4 assess the level of that benefit. We simply thought it
    5 was appropriate to identify it as a potential benefit,
    6 and we will have someone from the Institute of Clean Air
    7 Companies who are vendors for pollution control equipment
    8 that will be able to speak to that issue in some detail.
    9 He will be here testifying later in the week, and he can
    10 speak to the benefits of regulatory requirements and
    11 employment and how pollution control installation
    12 requirements can benefit employment in a state where such
    13 requirements are made.
    14
    MR. ZABEL: Will he speak specifically to
    15 the employment benefits, if any, of the proposed rule?
    16
    MR. ROSS: No, he will not. He will speak
    17 most likely in general terms. I don't believe he will.
    18
    MR. ZABEL: Is there anyone --
    19
    MR. ROSS: We have not asked him to look at
    20 that.
    21
    MR. ZABEL: Is there anyone for the Agency
    22 who can speak to that question?
    23
    MR. ROSS: Not to my knowledge.
    24
    MR. ZABEL: Thank you.
    Keefe Reporting Company
    24

    1
    HEARING OFFICER TIPSORD: Mr. Rieser, you
    2 have a follow-up?
    3
    MR. RIESER: Yeah, just briefly. Is there
    4 anyone from the Agency who's going to testify to the
    5 methodology and mechanics of the daily coal sampling
    6 which the rules require?
    7
    MR. ROSS: That's actually in the questions
    8 that I will be getting to today.
    9
    MR. RIESER: Okay. Sorry to jump ahead.
    10
    HEARING OFFICER TIPSORD: Just want to move
    11 along quicker, don't you?
    12
    MR. ROSS: It's, like -- I think it's
    13 question 80 something.
    14
    Question 16, "Section 225.265 of the proposed
    15 rule requires that daily coal sampling commence 30 days
    16 in advance of when the activity is actually necessary to
    17 determine coal mercury content for purposes of
    18 compliance. A, what is the ASTM requirement to provide
    19 representative daily samples?" This was a technical
    20 question, and I apologize in advance for the technical
    21 answer. ASTM D6414-01 and D3684-01, the methodologies
    22 that can be used under the proposed rule to determine
    23 mercury content of coal discuss an analytical methodology
    24 but defer to D2013-04, the standard practice for
    Keefe Reporting Company
    25

    1 preparing coal samples for analysis, period. D2013-04 in
    2 turn refers to D2234/D2234M-03, the standard practice for
    3 collection of gross sample of coal. This provides a
    4 minimum weight of two pounds for the sample.
    5
    B, "Is it the Agency's belief that one two-pound
    6 grab sample per day will be sufficient to demonstrate
    7 compliance?" Yes. However, the rule indicates that this
    8 is a minimum requirement. Sources may collect additional
    9 samples if they so choose.
    10
    HEARING OFFICER TIPSORD: Mr. Zabel?
    11
    MR. ZABEL: Mr. Ross, are you familiar with
    12 a construction permit that was issued for the Dynegy
    13 Vermilion station on May 20, 2006?
    14
    MR. ROSS: No, I am not.
    15
    MR. ZABEL: Would you be an appropriate
    16 person to question concerning that permit?
    17
    MR. ROSS: Probably a more appropriate
    18 person would be Chris Romaine, who will be here. He is
    19 the manager of the utilities unit and the construction
    20 permit unit, so he is probably intimately familiar with
    21 that permit.
    22
    MR. ZABEL: But for the record, the permit's
    23 for the installation of a baghouse and sorbent injection
    24 and requires ASTM sampling, and my point of my question
    Keefe Reporting Company
    26

    1 will be why isn't that in the rule and it's in this
    2 permit? I'm happily -- I'll happily defer it to
    3 Mr. Romaine.
    4
    HEARING OFFICER TIPSORD: And if I --
    5
    MR. ROSS: That may in fact be the
    6 appropriate thing to do. However, we did work with the
    7 utilities in the stakeholder meetings to arrive at the
    8 method of coal sampling that we have now in the rule, so
    9 this was discussed in some level of detail in the
    10 stakeholder meetings. We received a lot of comments on
    11 that. We responded to those comments in the meetings and
    12 we had believed that this was the agreeable method and
    13 that utilities were in fact somewhat in favor of the way
    14 we had chosen. And I do also want to note that I believe
    15 what we're requiring to be measured, which is mercury
    16 input, is somewhat of a new concept to some degree. I'm
    17 not sure if it was addressed in the Vermilion plant
    18 before, but certainly we've addressed it at this stage
    19 more than we have in the past. There's certainly more
    20 people involved in this rulemaking than were involved in
    21 a single construction permit.
    22
    MR. ZABEL: Let me ask you this question,
    23 Mr. Ross, and I'll save the permit specifically for
    24 Mr. Romaine. Would ASTM sampling be more expensive to
    Keefe Reporting Company
    27

    1 implement than one two-pound grab sample per day?
    2
    MR. ROSS: I can't speak to that, but
    3 reasonably, I would think, yes.
    4
    MR. ZABEL: It would require more
    5 sophisticated sampling equipment, would it not?
    6
    MR. ROSS: Right.
    7
    MR. ZABEL: And that would have a cost,
    8 would it not?
    9
    MR. ROSS: Yes, it would.
    10
    MR. ZABEL: To your knowledge, were those
    11 kinds of costs included in the Agency's economic
    12 analysis?
    13
    MR. ROSS: To some degree. I know I -- the
    14 questions do get around to cost here maybe shortly,
    15 and --
    16
    MR. ZABEL: I'm happy to wait.
    17
    MR. ROSS: -- and hopefully I hit on that.
    18 Okay.
    19
    HEARING OFFICER TIPSORD: And just before we
    20 proceed too far, I -- just for purposes of the record --
    21 and, Mr. Zabel, I know you're fully aware of this -- but
    22 I do want to caution you about asking about a permit that
    23 may potentially be in front of the Board on a permit
    24 appeal of some type.
    Keefe Reporting Company
    28

    1
    MR. ZABEL: It's a final issue permit. I --
    2
    HEARING OFFICER TIPSORD: Right, but --
    3
    MR. ZABEL: -- have no choice, Madam Hearing
    4 Officer. I realize this may well be before the Board.
    5 You're quite right.
    6
    HEARING OFFICER TIPSORD: And I just caution
    7 you that if you question -- I just caution you that if
    8 it's an active case that comes before the Board, you
    9 know, there could be issues about the board members'
    10 ability to rule on something that's discussed at this
    11 rulemaking proceeding, so just as a caution.
    12
    Mr. Harrington, you had a follow-up?
    13
    MR. HARRINGTON: Mr. Ross, do you consider
    14 yourself an expert on the sampling of input of coal to
    15 EGUs?
    16
    MR. ROSS: No, I do not.
    17
    MR. HARRINGTON: Is there an expert at the
    18 Agency on sampling of input of coal to EGUs?
    19
    MR. ROSS: We have staff members that have
    20 researched this and spoken with experts, so it depends on
    21 how you would qualify someone as an expert, but we
    22 certainly have people that have looked at this issue in a
    23 great deal of detail.
    24
    MR. HARRINGTON: Will any of them be
    Keefe Reporting Company
    29

    1 testifying here?
    2
    MR. ROSS: No.
    3
    MR. HARRINGTON: Are you an expert on the
    4 variability of coal from different sources and what a
    5 statistically accurate sampling of that coal would be to
    6 determine mercury content?
    7
    MR. ROSS: No, but we have spoken with such
    8 experts. I believe we identified one of them earlier,
    9 Massoud Rostam-Abadi.
    10
    MR. HARRINGTON: Excuse me?
    11
    MR. ROSS: Massoud Rostam-Abadi. He's with
    12 the University of Illinois. Illinois State Geological
    13 Survey, I believe, is who he's with, and we've mentioned
    14 him before, and we've consulted him on numerous occasions
    15 regarding the properties of coal not only in Illinois but
    16 all types of coal that Illinois EGU units burn, and he is
    17 an expert on coal variability and coal properties.
    18
    MR. HARRINGTON: Was that taken into account
    19 in setting forth the sampling and analysis methods for
    20 input coal?
    21
    MR. ROSS: I believe so, yes. We discussed
    22 this with him and with -- as I also mentioned, we
    23 discussed it with the power plants at the stakeholders'
    24 meetings and received a lot of comments, and this was
    Keefe Reporting Company
    30

    1 something that we worked with the power plants on.
    2
    MR. HARRINGTON: Did he or anyone else
    3 suggest to you that the method in the rule is a
    4 statistically valid method for sampling and analyzing
    5 mercury content of coal?
    6
    MR. ROSS: I can't speak to that directly.
    7 I wasn't involved in all the conversations and
    8 discussions. It was a lot of our staff members who we
    9 assigned to work specifically on this issue, but I would
    10 hope that was part of their conversations.
    11
    MR. HARRINGTON: Will any of them be
    12 testifying here?
    13
    MR. ROSS: Chris Romaine was a part of some
    14 of these discussions, so he may be able to shed some
    15 light on that.
    16
    MR. HARRINGTON: Thank you. That's all for
    17 now.
    18
    MR. ROSS: Question c, "Why is it necessary
    19 to commence daily coal sampling a month before the
    20 program begins?" This lead time was selected to ensure
    21 that any difficulties with the practices for collection
    22 of this data can be identified and corrected before the
    23 data is needed for the purposes of compliance.
    24
    D, "What equipment would be necessary to conduct
    Keefe Reporting Company
    31

    1 this sampling?" According to ASTM D2234/D2234M-03,
    2 quote, "Variations in coal handling facilities make it
    3 impossible to publish rigid rules covering every sampling
    4 situation in complete and exact detail," unquote.
    5 However, the Agency believes that a shovel and a bucket
    6 or a wheelbarrow will suffice.
    7
    HEARING OFFICER TIPSORD: Mr. Zabel?
    8
    MR. ZABEL: Is that for the two pounds a
    9 day?
    10
    MR. ROSS: Yes.
    11
    MR. ZABEL: What about for ASTM sampling?
    12
    MR. KIM: I believe he just answered that in
    13 a quote from the ASTM.
    14
    MR. ZABEL: No, he answered what the ASTM
    15 said, Mr. Kim. I'm asking what the Agency's knowledge of
    16 it is, if any.
    17
    MR. KIM: No, you said what is the ASTM's,
    18 and he just read you what --
    19
    MR. ZABEL: I'll rephrase the question.
    20 What has -- Has the Agency investigated the cost for
    21 Illinois power plants to do ASTM coal sampling?
    22
    MR. ROSS: I'm certain that was discussed,
    23 and I believe it was discussed. Although we don't have
    24 records of the stakeholder meetings, that did come up at
    Keefe Reporting Company
    32

    1 one of the stakeholder meetings and was discussed in a
    2 public forum, the cost associated with that, to some
    3 detail. I can't recall the specific discussions, but I
    4 know we did look at that and take that into
    5 consideration.
    6
    MR. ZABEL: Would it be more than a bucket
    7 and a shovel?
    8
    MR. ROSS: I would think so. I'm not
    9 certain. I can't answer that.
    10
    MR. ZABEL: Does the -- Did the Agency do
    11 any investigation of how many power plants in the state
    12 of Illinois, coal-fired, currently can or are capable of
    13 conducting ASTM sampling?
    14
    MR. ROSS: That was discussed also, and I
    15 believe we had some comments received on that, so it was
    16 discussed. We looked into it.
    17
    MR. ZABEL: What was the result of that
    18 look?
    19
    MR. ROSS: That some do have those
    20 capabilities on site and some do not.
    21
    MR. ZABEL: You don't know which -- how many
    22 or any quantification?
    23
    MR. ROSS: Not that I can recall.
    24
    MR. KIM: I believe he just answered e.
    Keefe Reporting Company
    33

    1
    HEARING OFFICER TIPSORD: What is the cost
    2 of this equipment? Move on to f.
    3
    MR. ROSS: F, "How many EGUs currently have
    4 this in place?" And it's uncertain. We don't have the
    5 exact number.
    6
    17, "Section 225.295 of the proposed rule states
    7 that the Agency will retain the mercury allowances and
    8 will instruct USEPA to permanently retire them. A, how
    9 does the Illinois EPA expect to demonstrate compliance
    10 with the emissions cap applicable to Illinois in the
    11 CAMR?" Well, we discussed at least one approach in some
    12 detail in the Technical Support Document. One point I
    13 would like to make is that Phase I of the CAMR, which is
    14 applicable until 2018, only requires a cap of 3,180
    15 pounds per year. Our mercury reduction level will we
    16 believe take Illinois' mercury emissions below 1,000
    17 pounds per year, so we will be well below the USEPA cap,
    18 but we are in ongoing discussions with USEPA and we've
    19 presented several different options. One of the options
    20 is explained in the TSD where we do a projection ten
    21 years forward of what mercury emission levels in Illinois
    22 will be as a result of Illinois' rule. They show that
    23 again they will be far below the CAMR caps and that there
    24 should not be significant I guess estimation or any way
    Keefe Reporting Company
    34

    1 that Illinois could potentially exceed the CAMR caps, and
    2 we believe USEPA agrees with this point, but coming up
    3 with a resolution on that may take some time.
    4
    B, "If the State does not comply with the cap,
    5 what happens? How will USEPA enforce the cap?" Again,
    6 we believe that the Illinois rule will meet USEPA caps
    7 for many years into the future, and the USEPA has not
    8 specified the implications to Illinois of not complying
    9 with the caps, so that may be a question best put to
    10 them.
    11
    HEARING OFFICER TIPSORD: Ms. Bassi?
    12
    MS. BASSI: I'm sorry. Would you repeat
    13 what you -- the last part that you said after "but"?
    14
    MR. KIM: Concerning what USEPA would do?
    15
    MS. BASSI: Yeah.
    16
    MR. ROSS: To the best of my knowledge, they
    17 have not specified what the implications would be to
    18 Illinois of not meeting the CAMR caps, but in our
    19 discussions with them, I think we're at some level of
    20 agreement that our rule is more stringent in that we will
    21 be able to meet the CAMR caps. Now it's just arriving at
    22 how we would demonstrate that to them in coming up with
    23 some formal agreement.
    24
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    Keefe Reporting Company
    35

    1
    MR. BONEBRAKE: Mr. Ross, you mentioned -- I
    2 think you said that the TSD discussed the fact that the
    3 Illinois rule would result in annual emissions of less
    4 than 1,000 pounds?
    5
    MR. ROSS: Correct.
    6
    MR. BONEBRAKE: And the TSD was submitted
    7 prior to the date that the TTBS was proposed as an
    8 amendment to the rule. My question for you is has the
    9 Agency revisited the expected annual -- the pounds per
    10 year of mercury in light of the TTBS?
    11
    MR. ROSS: Yes, we looked at that. What we
    12 looked at was the incremental increase in emissions that
    13 could occur as a result of some level. Say the TTBS
    14 allows 25 percent of the generating capacity of a company
    15 to utilize it, so you look at the potential incremental
    16 increase in mercury emissions that could occur as a
    17 result of that level of capacity utilizing the TTBS, and
    18 we would assume that most of the units that utilize it
    19 will -- you know, they're required to get 90 percent.
    20 Obviously, if you're going to utilize the TTBS, you're
    21 not getting 90 percent, so we would assume they would get
    22 somewhere in the neighborhood of 80 percent or above, and
    23 that incremental increase is very, very small. I think
    24 we estimated a maximum potential somewhere of an
    Keefe Reporting Company
    36

    1 additional 250 pounds of mercury emissions, and we do not
    2 expect 25 percent of a company's capacity to utilize the
    3 TTBS, so that's a top end estimate.
    4
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    5
    MR. BONEBRAKE: What was the basis for the
    6 80 percent number you just referenced?
    7
    MR. ROSS: That would be the level -- kind
    8 of a bottom level that units would -- units who put on
    9 controls to try and meet the 90 percent level, they're
    10 obviously -- if they're going to enter the TTBS, they're
    11 not going to meet 90 percent, so you try and estimate
    12 what level will they meet, and we believe at a minimum
    13 they should be able to get 80 percent, and the basis of
    14 that I believe is described in some detail in Section 8
    15 of the TSD where we talk about the levels of mercury
    16 control that different control strategies will achieve.
    17
    HEARING OFFICER TIPSORD: Ms. Bassi?
    18
    MS. BASSI: Mr. Ross, did you say you did
    19 not expect the TTBS to be utilized to a great extent or
    20 to the full extent that it's available?
    21
    MR. ROSS: Yes, I did say that.
    22
    MS. BASSI: Why is that?
    23
    MR. ROSS: Well, it allows 25 percent of the
    24 generating capacity, but of course you would have to have
    Keefe Reporting Company
    37

    1 exact numbers to use 25 percent; that is, any one
    2 company, Ameren -- you know, the big three, Dynegy,
    3 Ameren or Midwest Generation, they would have to -- you
    4 know, if they have twenty units and five of them are
    5 going to use it, there's not a likelihood that those five
    6 units that are going to use it add up to exactly 25
    7 percent of that company's generating capacity, so even at
    8 full use of the TTBS, those five units would add up to,
    9 say, only 20 percent or 18 percent of that company's
    10 generating capacity, so there you -- you know, you would
    11 have 5 to 7 percent of unused portion of that 25 percent
    12 allowed by the TTBS. And we have many questions -- we're
    13 getting into the TTBS here, and we have a lot of
    14 questions that address that. They aren't in these
    15 questions here today. We are prepared to answer those
    16 questions, but that will be a lengthy discussion, I
    17 believe, that may be more appropriate after -- and this
    18 is my own opinion -- may be more appropriate after we
    19 talk about cost and controls, because a lot of that is
    20 intertwined.
    21
    MS. BASSI: Can I ask two quick questions?
    22
    HEARING OFFICER TIPSORD: Absolutely.
    23
    MS. BASSI: You said that the -- that for
    24 the big three, as you described them, that that might
    Keefe Reporting Company
    38

    1 actually utilize only around 18 percent. I know it
    2 was --
    3
    MR. ROSS: That was a rough estimate.
    4
    MS. BASSI: -- just a guess. Just a guess.
    5 But it raises an interesting question, which is, are they
    6 having -- are the big three having to lowball the amount
    7 of -- if you will, the amount of capacity that is
    8 possibly beneficially used in the TTBS because of the 25
    9 percent cap that you've put onto the -- you -- by you I
    10 mean the Agency -- has put onto the TTBS; in other words,
    11 they may have had more capacity they would like to have
    12 put into the TTBS but cannot go to 26 percent?
    13
    MR. ROSS: That's certainly possible, yes.
    14
    MS. BASSI: Okay. And my second question
    15 is, what about the remaining four companies?
    16
    MR. ROSS: They're allowed, just like they
    17 are in averaging calculations, to combine their capacity,
    18 and then 25 percent of that capacity is allowed in the
    19 TTBS, so --
    20
    MS. BASSI: That could --
    21
    MR. ROSS: They are allowed to use it, yes.
    22
    MS. BASSI: That could pose some interesting
    23 negotiations.
    24
    MR. ROSS: Yes, it could.
    Keefe Reporting Company
    39

    1
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    2
    MR. BONEBRAKE: Sounds like we're going to
    3 have some more discussion about the details of the TTBS
    4 later on, so I'm not going to ask any more questions
    5 about that, but one related follow-up question to
    6 discussions with USEPA that you referenced already. In
    7 any discussions between IEPA and USEPA to this point in
    8 time concerning the cap, has TTBS and its ramifications,
    9 if any, on the CAMR cap been discussed with USEPA?
    10
    MR. ROSS: They're certainly aware that we
    11 were thinking about adding a TTBS into the rule. As far
    12 as the level of detail our discussions with them have
    13 included the ramifications, I'm not certain, but they are
    14 aware that a TTBS was being contemplated, and I think at
    15 this time they're aware that we amended the rule to
    16 include it.
    17
    MR. BONEBRAKE: So at this point in time,
    18 you don't have a -- do you have a view as to whether
    19 USEPA had a favorable or negative reaction to inclusion
    20 of the TTBS?
    21
    MR. ROSS: I don't know.
    22
    HEARING OFFICER TIPSORD: Mr. Harrington?
    23
    MR. HARRINGTON: This is dropping back to an
    24 earlier answer, if I may. You mentioned that the notion
    Keefe Reporting Company
    40

    1 of sampling coal to determine mercury consent on an
    2 ongoing basis is novel? Is that a correct
    3 characterization of your testimony?
    4
    MR. ROSS: I think what we're targeting in
    5 the rule is input mercury.
    6
    MR. HARRINGTON: Yeah.
    7
    MR. ROSS: I'm pretty certain that's a new
    8 term somewhat, so it's somewhat novel.
    9
    MR. HARRINGTON: Not only is the term new,
    10 but the concept of basing the regulation on input mercury
    11 is new, is it not?
    12
    MR. ROSS: Somewhat is the answer to that.
    13 I know other agencies are -- have indicated they are
    14 going to do something similar. I believe STAPPA/ALAPCO's
    15 rule is doing -- their proposed model rule for mercury
    16 control is doing something similar, so the concept is out
    17 there in other states and other areas.
    18
    MR. HARRINGTON: Am I correct that the
    19 Agency is unaware of any history anywhere where input
    20 mercury has been consistently tested over any period of
    21 time in a manner in any way consistent with your proposed
    22 rule?
    23
    MR. ROSS: I am certainly unaware of any
    24 such cases.
    Keefe Reporting Company
    41

    1
    MR. HARRINGTON: So we are not aware, any of
    2 us, based on the history as to the relative accuracy,
    3 precision and consistency of this type of sampling, are
    4 we, based on empirical data?
    5
    MR. ROSS: This specific type of sampling, I
    6 think the way you framed it, it is correct. However,
    7 what I've been told and my thoughts tell me are it's
    8 novel to a point. It's not that mercury content of coal
    9 hasn't been measured and that there's not accepted
    10 methods out there for that.
    11
    MR. HARRINGTON: The methods that have been
    12 approved to take -- once you have a sample in your hand,
    13 you can analyze the coal to a certain level and have
    14 reasonable reliability in that single sampling analytical
    15 event; is that correct?
    16
    MR. ROSS: Yes.
    17
    MR. HARRINGTON: But there is no
    18 demonstrated consistent method for taking the samples,
    19 preparing the samples and obtaining data over a long
    20 period of time to determine mercury content in coal; is
    21 that correct?
    22
    MR. ROSS: I'm uncertain.
    23
    MR. HARRINGTON: Thank you.
    24
    HEARING OFFICER TIPSORD: I believe we're on
    Keefe Reporting Company
    42

    1 17c.
    2
    MR. HARRINGTON: Maybe just one more
    3 slightly different question, but it may wrap up some
    4 other questions and we can avoid as we go forward putting
    5 some of ours. Listening to your testimony, is it correct
    6 that neither you nor your other Agency witnesses here,
    7 meaning Agency employee witnesses, are representing
    8 yourselves to be experts in the removal technology for
    9 mercury in flue gas but that you are relying on
    10 Dr. Staudt and others who will also be present for those
    11 conclusions?
    12
    MR. ROSS: I think that specific question is
    13 asked later. I can address it then.
    14
    MR. HARRINGTON: Just thought it might
    15 cut -- I know it's a pass, but I also know -- thought it
    16 might cut off some question later on so we can speed up
    17 the process, but we can get to it later. That's fine.
    18 Thank you.
    19
    MR. ROSS: C, "How can Illinois EPA assure
    20 that USEPA will not take the global approach it takes in
    21 other areas," example given, "assuming noncompliance for
    22 the entire ozone season if an EGU does not hold
    23 sufficient allowances at the end of the season under NOx
    24 SIP call? That is, how can Illinois EPA assure the
    Keefe Reporting Company
    43

    1 regulated community that USEPA will not pursue
    2 enforcement against each of the affected EGUs if the
    3 State does not comply with the emissions cap?" We will
    4 do all we can to ensure this doesn't occur. We cannot
    5 guarantee it. We believe the chance is remote and we are
    6 working on all these issues with USEPA.
    7
    HEARING OFFICER TIPSORD: Mr. Zabel?
    8
    MR. ZABEL: Mr. Ross, this problem of the
    9 interface with USEPA, would it largely disappear if the
    10 proposal of the Agency were a state law only rule and
    11 CAMR were applied in Illinois?
    12
    MR. ROSS: There is that possibility. If
    13 CAMR applied in Illinois, certainly USEPA would be
    14 extremely happy and that would answer all those
    15 questions, yes.
    16
    MR. ZABEL: It's not been my goal in life 40
    17 years to make USEPA happy, Mr. Ross, just so the record's
    18 clear on that subject. Thank you.
    19
    MR. ROSS: 18, "Please provide examples of
    20 the calculations for Section 225.230(d)." And Chris
    21 Romaine will be answering this question. 19 also Chris
    22 Romaine will be answering.
    23
    HEARING OFFICER TIPSORD: Ms. Bassi?
    24
    MS. BASSI: I'm sorry. I have to go back to
    Keefe Reporting Company
    44

    1 17 one more time. If -- I believe you stated that there
    2 were ongoing discussions with USEPA and that it sounds to
    3 me like you have convinced some of USEPA's staff that
    4 you're -- that Illinois' proposal will protect the cap
    5 that USEPA has required and that you're working through
    6 the approval process that has to occur by USEPA. Will
    7 this approval process take a longer period of time
    8 because Illinois EPA is not proposing or at least at this
    9 point planning to submit the CAMR as its federally
    10 enforceable rule?
    11
    MR. ROSS: You know, that's hard to say.
    12 You're asking me to speculate, but I would think so, yes.
    13 I mean, obviously if we adopted CAMR or some form of
    14 CAMR, USEPA I think would be happy and readily approve
    15 that approach.
    16
    MS. BASSI: If Illinois EPA -- strike that.
    17 Thank you.
    18
    HEARING OFFICER TIPSORD: Mr. Forcade?
    19
    MR. FORCADE: Yes. Bill Forcade, Jenner &
    20 Block, representing Kincaid Generation, LLC. Mr. Ross,
    21 your response to question 17a about Illinois EPA
    22 demonstrating compliance, was that premised on the
    23 regulatory language prior to the adoption of the
    24 amendment that was approved for review last Thursday at
    Keefe Reporting Company
    45

    1 the board meeting?
    2
    MR. ROSS: Yes, it was.
    3
    MR. FORCADE: All right. How will you
    4 demonstrate compliance with the emission cap with the
    5 TTBS exemption in place if a large number of facilities
    6 apply for such an exemption?
    7
    MR. ROSS: As I previously discussed, we
    8 will be able to show them that if a large number of units
    9 enter the -- you know, only 25 -- it's only allowed for
    10 25 percent of the generating capacity of a company, so we
    11 will show that the maximum potential increase in
    12 emissions that would result if a large number of units
    13 entered the TTBS would be small enough where Illinois'
    14 emissions would still be below the cap, well below. In
    15 particular, again, USEPA's CAMR, the cap for Phase I all
    16 the way out to 2018 is greater than 3,000 pounds per
    17 year. Under our rule, we believe by mid 2009 Illinois'
    18 emissions will be below 1,000 pounds per year, so we
    19 don't think that that's too difficult to demonstrate to
    20 USEPA.
    21
    HEARING OFFICER TIPSORD: Are we ready to
    22 move on, then? Are we going to Ameren or Kincaid?
    23
    MR. ROSS: Kincaid.
    24
    MR. KIM: Kincaid.
    Keefe Reporting Company
    46

    1
    MS. BASSI: Did we answer 19 or is that --
    2 that's Romaine?
    3
    MR. KIM: Yes.
    4
    MS. BASSI: Sorry.
    5
    MR. ROSS: Okay. Again, these are Kincaid
    6 Generation questions for the Agency. This is question 1.
    7 "Please provide the names of each person that
    8 participated in the preparation of Chapter 8 of the TSD."
    9 And we did this to some degree on day one, but in
    10 general, the Agency's TSD was a collaborative effort
    11 between numerous Agency personnel and several experts
    12 retained by the Agency to assist with the proposed
    13 mercury rule. Chapter 8 of the TSD was primarily
    14 prepared by the Agency-retained expert on mercury cost
    15 and control, Dr. James Staudt. However, several Agency
    16 personnel reviewed and provided comments to Dr. Staudt,
    17 including myself, Chris Romaine, Blaine Kinsley and
    18 Bureau of Air chief Laurel Kroack.
    19
    HEARING OFFICER TIPSORD: You didn't get all
    20 of that?
    21
    MR. FORCADE: I'm sorry. I didn't hear the
    22 names.
    23
    MR. ROSS: Okay.
    24
    MR. FORCADE: I got Dr. Staudt and then I
    Keefe Reporting Company
    47

    1 did not hear the rest.
    2
    MR. ROSS: Myself, Jim Ross; Chris Romaine;
    3 Blaine Kinsley and Laurel -- Kinsley, K-I-N-S-L-E-Y, and
    4 Laurel Kroack, K-R-O-A-C-K.
    5
    Question 2, "For each of the people provided in
    6 answer to question 1, explain the specific role that each
    7 played in the preparation of Chapter 8 and identify the
    8 specific sections which they participated in drafting."
    9 And I believe I answered that when I answered question 1,
    10 that Section 8 was primarily Dr. Staudt's efforts and we
    11 simply provided comments and suggestions to Dr. Staudt.
    12
    MR. FORCADE: Could you identify what
    13 specific areas the comments were from each of the
    14 individuals identified in your previous answer?
    15
    MR. ROSS: No, I can't. That section went
    16 through numerous iterations, I would estimate 30
    17 iterations where it was marked up in red and revised and
    18 re-revised and re-revised, and so, no, that would be
    19 extremely difficult. We did not keep track of who made
    20 comments where. It was circulated for comments. I'm
    21 sure Dr. Staudt incorporated some of the comments and
    22 chose not to incorporate others, and when we got the
    23 final version, I think we may have made some tweaks also
    24 to it before it went into the Technical Support Document,
    Keefe Reporting Company
    48

    1 so I have made no effort to do that and that would be
    2 extremely difficult.
    3
    MR. FORCADE: Can you identify the topical
    4 areas that each of those individuals would have provided
    5 comments on?
    6
    MR. ROSS: Well, Section 8 in general is
    7 cost and controls. I would say that each of these
    8 individuals with the exception of Blaine Kinsley provided
    9 comments on each and every section and topic in Section
    10 8. Blaine Kinsley I think -- I believe his work focused
    11 in on coal washing aspects and the water implications and
    12 permitting implications for the Bureau of Water.
    13 Otherwise, no section was -- no portion of that section
    14 was off limits for comments from myself, Chris and
    15 Laurel.
    16
    MR. KIM: For clarification, Mr. Kinsley is
    17 a Bureau of Water employee, not Bureau of Air.
    18
    HEARING OFFICER TIPSORD: And I would just
    19 also like to note for the record that the answers to
    20 these questions are similar to a question -- there was a
    21 question from Ameren that is similar, and we will have to
    22 revisit it because Ameren's question is a little broader,
    23 but just for the record, this is similar to a question
    24 asked by Ameren. I believe it's question 6.
    Keefe Reporting Company
    49

    1
    MR. ROSS: Of 94. Question 3, "Please
    2 provide the names of each person that participated in the
    3 preparation of Section 9." Section 9 of the TSD was
    4 primarily just a publishing of the economic modeling
    5 results supplied by ICF Resources, which is the company
    6 that was retained by the Agency to perform economic
    7 modeling of the impact of the proposed mercury rule.
    8 Agency personnel who contributed to this section include
    9 myself and Rob Kaleel.
    10
    "For each of the people provided in answer to" --
    11
    HEARING OFFICER TIPSORD: Excuse me.
    12 Mr. Rieser.
    13
    MR. FORCADE: Slower. If you wouldn't mind,
    14 I'd like to write stuff down as you respond.
    15
    MR. RIESER: And I'm sorry. I know this was
    16 discussed. Will there be anyone from ICF who will
    17 testify in support of the ICF report that was included as
    18 part of the TSD?
    19
    MR. ROSS: No, there will not. We will have
    20 a economic expert who will be testifying and able to
    21 answer questions regarding the modeling performed by ICF.
    22
    MR. RIESER: That's Dr. Hausman?
    23
    MR. ROSS: That's correct.
    24
    MR. RIESER: Thank you.
    Keefe Reporting Company
    50

    1
    HEARING OFFICER TIPSORD: Excuse me.
    2 Mr. Forcade, did you get those names? Did you get what
    3 you needed?
    4
    MR. FORCADE: No, but when we get to my
    5 number 12, I'll revisit the issue.
    6
    HEARING OFFICER TIPSORD: Okay.
    7
    MR. ROSS: 4, "For each of the people
    8 provided in answer to question 3, explain the specific
    9 role that each played in the preparation of Chapter 9 and
    10 identify the subsections which they participated in
    11 drafting." I believe I answered that.
    12
    MR. FORCADE: Mr. Ross, if I understand
    13 correctly, you said it was yourself and Rob Kaleel?
    14
    MR. ROSS: That's correct.
    15
    MR. FORCADE: What background do you have in
    16 economics?
    17
    MR. ROSS: I had economic analysis in
    18 college, but I have very limited background, and again,
    19 that section was just a publishing of the economic
    20 modeling results from ICF.
    21
    MR. FORCADE: Well, if you'll excuse me for
    22 probing this, the bottom line is we have a report with no
    23 one to testify relating to its preparation, the inputs to
    24 the model, unless there's folks that I haven't
    Keefe Reporting Company
    51

    1 identified, so I'd like to probe at least the issue of
    2 those who provided comments on it, what were the areas of
    3 the comments, what --
    4
    MR. ROSS: I believe as far as input and
    5 discussions that occurred prior to the modeling, I will
    6 be able to testify in some degree to that, and so will
    7 Dr. Hausman, who has had discussions directly with ICF
    8 regarding those specific items, so the economic expert
    9 that we will have testifying here has communicated with
    10 ICF and asked a lot of those very same questions.
    11
    MR. FORCADE: My understanding is that the
    12 two individuals who provided comments on it were yourself
    13 and Rob Kaleel. Is that correct?
    14
    MR. ROSS: Provided comments? I wouldn't
    15 say provided comments. That the two individuals that
    16 prepared that section was myself and Rob Kaleel, that's
    17 correct.
    18
    MR. FORCADE: And you're saying now that
    19 there's an external expert who did not prepare the ICF
    20 report who will be testifying?
    21
    MR. ROSS: That's correct.
    22
    MR. FORCADE: And did that individual
    23 participate in the preparation of that chapter?
    24
    MR. ROSS: No, he did not.
    Keefe Reporting Company
    52

    1
    MR. FORCADE: And could you also identify
    2 what, if any, economic education, experience and
    3 qualifications Rob Kaleel would have?
    4
    HEARING OFFICER TIPSORD: Excuse me. I --
    5 Actually, Mr. Kaleel is scheduled to testify.
    6
    MR. FORCADE: Oh, is he?
    7
    HEARING OFFICER TIPSORD: I think you can
    8 ask him that question. He'd be better able to answer
    9 that. He has prefiled testimony, although brief, but he
    10 is one of their witnesses.
    11
    MR. KIM: I would say for clarification
    12 Mr. Kaleel is available to testify, but I don't believe
    13 he was going to -- we don't have him right now scheduled
    14 to provide any specific answer. He was again -- Just a
    15 moment. He was another one of our backup witnesses in
    16 case we had scheduling problems, and there were no
    17 specific questions -- prefiled questions posed to
    18 Mr. Kaleel. There were some general Agency questions
    19 that listed him among other people that I believe the
    20 questioners thought, you know, would be best situated to
    21 answer. He's available but he will not be actually -- we
    22 don't have him scheduled to answer any questions at this
    23 point.
    24
    HEARING OFFICER TIPSORD: So you don't plan
    Keefe Reporting Company
    53

    1 to present Mr. Kaleel?
    2
    MR. KIM: No, but he is -- if need be, he
    3 can answer, you know, questions as they come up or we can
    4 provide them in written answers, whatever's --
    5
    HEARING OFFICER TIPSORD: Mr. Kim, I think
    6 you're going to need to bring Mr. Kaleel down to talk
    7 about the economic --
    8
    MR. KIM: He's been here every day.
    9
    HEARING OFFICER TIPSORD. Okay. I just --
    10
    MR. KIM: My only point was that he is
    11 not -- he has not been presented with any specific
    12 questions and all of the general Agency questions that
    13 arguably might go to someone within the Agency are being
    14 addressed either by Jim Ross or someone Jim Ross
    15 designates.
    16
    HEARING OFFICER TIPSORD: Mr. Forcade?
    17
    MR. FORCADE: Madam Hearing Officer, if none
    18 of the ICF report and none of the Chapter 9 and 10 of the
    19 TSD says Rob Kaleel wrote this, I don't know how I could
    20 have posed questions to Rob Kaleel.
    21
    MR. KIM: And again, I'm looking at --
    22 Mr. Kaleel had the luxury of the shortest prefiled
    23 testimony of any Agency witness, all two paragraphs, and
    24 I don't believe he made any statement that he was holding
    Keefe Reporting Company
    54

    1 himself out to have any kind of economic background or
    2 expertise in any particular area.
    3
    HEARING OFFICER TIPSORD: Well, but since
    4 you don't plan to present him, I guess Mr. Ross is going
    5 to have to explain his economic background, Mr. Kaleel's
    6 economic background.
    7
    MR. KIM: When I say we're not presenting
    8 him, he can answer. He can come up and he can answer
    9 that question. I was just saying he's not been tabbed to
    10 answer any specific questions that were submitted in
    11 prefiled form.
    12
    HEARING OFFICER TIPSORD: I understand that,
    13 but you did prefile testimony for Mr. Kaleel, so --
    14
    MR. KIM: Yes, yes, and I believe the rule
    15 is that anybody that does that has to be available for
    16 cross examination, and he is available.
    17
    MR. FORCADE: I'm simply trying to explore
    18 who participated in the preparation of this particular
    19 chapter and what input they had to the document, and I
    20 think there's a pending question. If you can't answer
    21 them, that's fine.
    22
    MR. ROSS: I'm not aware of Mr. Kaleel
    23 having any broad economic background, and he was not
    24 selected to prepare Section 9 because we felt that he had
    Keefe Reporting Company
    55

    1 some broad economic understanding. He was merely
    2 selected to assist us in putting the IPM modeling results
    3 into the Technical Support Document. That's all Section
    4 9 was, was a publishing of the economic modeling results.
    5 We did not reach any conclusions ourselves. We merely
    6 wanted to present the results, and the conclusions
    7 reached therein were the conclusions of ICF Resources.
    8 They were not the Illinois EPA's conclusions, but we
    9 thought it was important that that economic impact
    10 analysis be presented in our Technical Support Document.
    11
    MR. FORCADE: Am I correctly understanding
    12 you now, sir, that ICF did not participate in the
    13 preparation of Chapter 9 of the TSD? They did not write
    14 any of the language in there?
    15
    MR. ROSS: They wrote -- It depends on how
    16 you put that. They wrote most of the language in there.
    17 They prepared a final report for us, and what we did was
    18 take that final report and incorporate it into our
    19 Technical Support Document. Now, we reworded some of it
    20 to make it read easier, but that's about the extent of
    21 the changes we made to their report that they provided to
    22 us.
    23
    MR. FORCADE: Going back, then, is it safe
    24 to say that ICF prepared and submitted the ICF report,
    Keefe Reporting Company
    56

    1 which I believe is Exhibit C to the Technical Support
    2 Document?
    3
    MR. ROSS: I believe that's correct, yes.
    4
    MR. FORCADE: Okay. Did -- When was that
    5 report finished and submitted to the Agency?
    6
    MR. ROSS: I don't know the exact date on
    7 that. I believe it was fairly close to the filing date
    8 of the rule.
    9
    MR. FORCADE: That would be March 10 of
    10 2006?
    11
    MR. ROSS: Yes. Looking at the report right
    12 now, that is correct.
    13
    MR. FORCADE: When was Chapter 9 of the
    14 Technical Support Document written?
    15
    MR. ROSS: I would say March 11.
    16
    MR. FORCADE: Did you provide a draft of
    17 Chapter 9 of the Technical Support Document to ICF?
    18
    MR. ROSS: No, we did not.
    19
    MR. FORCADE: Has ICF seen Chapter 9 of the
    20 TSD?
    21
    MR. ROSS: I can't answer that. They
    22 provided drafts of their final report to us before this
    23 final report that we've included as an appendix to the
    24 TSD. They provided that, several versions, before the
    Keefe Reporting Company
    57

    1 March 10 final document.
    2
    MR. FORCADE: Would it be safe to say, then,
    3 that ICF did not draft any of the language in Chapter 9
    4 or review the language in Chapter 9 of the TSD except to
    5 the extent that you quoted language from their report or
    6 earlier reports?
    7
    MR. ROSS: That's correct.
    8
    MR. FORCADE: Okay. In view of the fact
    9 that you've now raised the issue of documentation
    10 contained in earlier reports from ICF, would you please
    11 prepare and submit for the Board all earlier drafts of
    12 the ICF report?
    13
    MR. ROSS: I suppose we could. I mean,
    14 there were several versions of those. I received some of
    15 them via -- most of them, I believe, via e-mail, would
    16 have to go back and pull those up. There was probably,
    17 estimating, six, seven drafts before this final.
    18
    MR. FORCADE: I understand, but if I'm
    19 understanding your testimony correctly, you're saying no
    20 one with any economic education, background and skills
    21 wrote Chapter 9. It was written from one document and
    22 the predecessor versions of that document. Therefore,
    23 for me to evaluate what in fact is contained in TSD
    24 Chapter 9 --
    Keefe Reporting Company
    58

    1
    MR. ROSS: Well, I wouldn't say predecessor
    2 versions. I would say we waited till we got the final
    3 before we started drafting Section 9.
    4
    MR. FORCADE: Right, but you relied upon
    5 language contained in earlier drafts or earlier whatever
    6 you call --
    7
    MR. ROSS: I don't believe --
    8
    MR. FORCADE: -- communications with ICF --
    9 pardon?
    10
    MR. ROSS: I don't believe we did.
    11
    MR. FORCADE: Then would it be safe to say
    12 that any language in Chapter 9 that is not direct quote
    13 from the ICF report can be stricken?
    14
    MR. ROSS: No. We revised some of the
    15 language to make it read better. In other words, ICF was
    16 directing the results to the Illinois EPA. They were
    17 talking to us in the report, so we took out that frame of
    18 reference and made it read better to a person -- we felt
    19 we made it read better to a person reading the Technical
    20 Support Document.
    21
    MR. FORCADE: I'm a little confused. I
    22 thought I heard earlier testimony by you that you -- in
    23 making the revisions or drafting the Chapter 9 language
    24 that you relied on earlier communications from ICF. Are
    Keefe Reporting Company
    59

    1 you now saying that is not true, there were no prior --
    2
    MR. ROSS: I don't believe I said that. I
    3 believe I said there were earlier versions. We spoke
    4 with ICF throughout the process, but when it came down to
    5 actually putting something into the Technical Support
    6 Document, we waited till the final report.
    7
    MR. FORCADE: I understand.
    8
    MR. ROSS: We did not draft different
    9 versions of Section 9 based on previously submitted
    10 drafts of their final report. We waited till the final
    11 report till we drafted Section 9.
    12
    MR. FORCADE: I understand the timing.
    13
    MR. ROSS: Okay.
    14
    MR. FORCADE: My question was, in drafting
    15 Section 9, did you limit all of the language that you
    16 drafted to words that were contained in the ICF report
    17 that --
    18
    MR. KIM: I believe he's answered the
    19 question, that that document was the basis for Section 9
    20 with the exception of some changes that were made to make
    21 the language more readable. I think he's testified to
    22 that a couple, two, three times now.
    23
    MR. FORCADE: I'd like to review the
    24 testimony when it comes out and possibly have additional
    Keefe Reporting Company
    60

    1 questions.
    2
    HEARING OFFICER TIPSORD: Mr. Harrington?
    3
    MR. HARRINGTON: Am I correct that you
    4 earlier stated that Chapter 9 does not reflect the
    5 conclusions of the Illinois Environmental Protection
    6 Agency but was merely a republishing, in essence, of a
    7 report you received from some third party?
    8
    MR. ROSS: To some extent, that is true. We
    9 agree with some of the conclusions. We feel, as our
    10 expert will testify, that some of the conclusions are
    11 suspect. I mean, you'll see that the economic modeling
    12 that ICF performed does not directly correlate with the
    13 work Dr. Staudt did, does not directly correlate with the
    14 prefiled testimony of our economic expert, so to that
    15 extent, there is some level of discrepancy which -- and I
    16 think a lot of this will be discussed in detail when we
    17 get to Section 9 of the Technical Support Document, which
    18 is scheduled for later on in this hearing, and our
    19 economic expert will be up here and I will be beside him
    20 and we can go over this in some detail.
    21
    MR. HARRINGTON: Just so I understand it,
    22 you are not asking the Board to accept Chapter 9 as
    23 either the opinion or the position of the Agency in this
    24 proceeding.
    Keefe Reporting Company
    61

    1
    MR. ROSS: Not in its entirety, I would say.
    2
    MR. HARRINGTON: Thank you.
    3
    HEARING OFFICER TIPSORD: Before we go on,
    4 Mr. Forcade, you had asked for a production of drafts?
    5
    MR. KIM: Can I -- I was going to say, can I
    6 ask one question of Mr. Ross and then revisit
    7 Mr. Forcade's request?
    8
    HEARING OFFICER TIPSORD: Okay.
    9
    MR. KIM: Was any document provided by ICF
    10 Consulting other than the document which is dated March
    11 10, 2006, relied upon in the preparation of Section 9 of
    12 the Technical Support Document?
    13
    MR. ROSS: I don't believe so.
    14
    MR. KIM: With that answer, I'm -- I would
    15 request that earlier drafts, to the extent we can even
    16 find them, would not need to be requested since his
    17 testimony -- I think he already gave that. I'm just -- I
    18 asked him that just so it's clear on the record. I
    19 believe the only document that we relied upon to prepare
    20 the Technical Support Document, or at least this section,
    21 is the document that's in the TSD, and therefore I don't
    22 think it's necessary to go beyond that.
    23
    MR. FORCADE: I'd be willing to defer
    24 questions right now, but since this is an issue that has
    Keefe Reporting Company
    62

    1 not been responded to, I'd like the opportunity to review
    2 the ICF and Chapter 9 on a line-by-line basis and, if I
    3 can find concepts in there that are not in the ICF
    4 report, to revisit those questions with Mr. Ross or
    5 whoever would be the appropriate witness.
    6
    MR. KIM: And that would be perfectly
    7 acceptable with us.
    8
    HEARING OFFICER TIPSORD: Let's be clear.
    9 That would be perfectly acceptable to the Board as long
    10 as it's this -- during this set of hearings, because at
    11 this point the Agency's scheduled to give its testimony
    12 through the end of this week.
    13
    MR. FORCADE: Correct. I've just --
    14
    HEARING OFFICER TIPSORD: All right. I just
    15 wanted --
    16
    MR. FORCADE: I just have not in the last
    17 four minutes had the opportunity to do a comparison of --
    18
    HEARING OFFICER TIPSORD: I absolutely
    19 understand that, but I wanted to be clear on the record
    20 that at this point we're still talking about concluding
    21 the Agency's testimony by Friday.
    22
    MR. FORCADE: Yes.
    23
    HEARING OFFICER TIPSORD: Okay. Thank you.
    24
    MR. FORCADE: Mr. Ross, could you tell me
    Keefe Reporting Company
    63

    1 what information was provided relative to the ICF report
    2 to the external expert that will be testifying on
    3 economics?
    4
    MR. ROSS: Well, we provided them with I
    5 believe all information provided by ICF to us, which
    6 included this final report and all the accompanying
    7 files, parse files they call them, huge documents, which
    8 we've I think made part of the record. That was asked
    9 for the first day I testified. Hopefully it's been made
    10 part -- We supplied it to our legal staff to make it part
    11 of the record. Whether it's been made part of the
    12 record, I'm not certain, but they are in possession of
    13 it, and we've previously provided it to anyone who's
    14 requested it through a Freedom of Information Act. As we
    15 mentioned during the stakeholder meetings, everything
    16 that ICF gave us is available as far as final reports and
    17 all the accompanying documents.
    18
    MR. FORCADE: And the economic experts that
    19 you're talking about that will testify are who?
    20
    MR. ROSS: Ezra Hausman with Synapse.
    21
    MR. FORCADE: I'm sorry?
    22
    MR. ROSS: He's with Synapse.
    23
    MR. FORCADE: Anyone else?
    24
    MR. ROSS: Some of Dr. Staudt's testimony is
    Keefe Reporting Company
    64

    1 economic-related, but he is the primary person to answer
    2 questions regarding the ICF modeling.
    3
    MR. FORCADE: And did either one of those
    4 two individuals review or provide comments on Chapter 9
    5 of the Technical Support Document?
    6
    MR. ROSS: Prior to us submitting the TSD or
    7 after? I would say afterwards certainly we've discussed
    8 Section 9 in detail with Ezra Hausman with Synapse.
    9
    MR. FORCADE: Let's stick right now with
    10 prior to the submission of the Technical Support
    11 Document.
    12
    MR. ROSS: Prior to the submission?
    13 Certainly not Ezra Hausman with Synapse. He was not
    14 retained at that period, I believe. Dr. Staudt, not too
    15 much, I don't believe. I don't recall any specific
    16 comments from Dr. Staudt. We shared the results with
    17 him. We discussed them with him periodically. I don't
    18 recall -- He certainly didn't submit comments to the
    19 extent that we incorporated his comments or revised some
    20 portion of Section 9 of the Technical Support Document as
    21 a result of his comments, nothing to that extent, if
    22 that's where you're going.
    23
    MR. FORCADE: Just trying to find out who
    24 had input into Chapter 9.
    Keefe Reporting Company
    65

    1
    HEARING OFFICER TIPSORD: All right. With
    2 that, let's take a ten-minute break, please.
    3
    (Brief recess taken.)
    4
    HEARING OFFICER TIPSORD: I believe we are
    5 on Kincaid question number 5.
    6
    MR. ROSS: Question 5, "Please provide the
    7 names" --
    8
    HEARING OFFICER TIPSORD: Oh, excuse me.
    9 Mr. Zabel?
    10
    MR. ZABEL: I had a follow-up question,
    11 Mr. Ross. You indicated in answer to -- in answering a
    12 question from Mr. Forcade that the Agency does not -- I
    13 don't know the precise wording. He asked if you relied
    14 on the ICF report in Chapter 9 and you said not entirely,
    15 and my question is, how do we know which parts the Agency
    16 is relying on?
    17
    MR. ROSS: Well, we can discuss that when we
    18 get to Section --
    19
    MR. ZABEL: And would that be you? Would
    20 you be the appropriate witness for that?
    21
    MR. ROSS: Yes.
    22
    MR. ZABEL: Then we will. Thank you.
    23
    MR. ROSS: Okay.
    24
    HEARING OFFICER TIPSORD: Kincaid question
    Keefe Reporting Company
    66

    1 number 5.
    2
    MR. ROSS: "Please provide the names of each
    3 person that participated in the preparation of Chapter 10
    4 of the TSD." Section 10 was a collaborative effort
    5 between numerous Agency personnel. These included
    6 myself, Jim Ross; Chris Romaine; Rob Kaleel; Rory Davis;
    7 Dr. Staudt.
    8
    MR. FORCADE: I'm sorry. Could you just go
    9 slow enough I could write?
    10
    MR. ROSS: I'm sorry.
    11
    MR. FORCADE: Jim Ross.
    12
    MR. ROSS: Jim Ross, Chris Romaine, Rob
    13 Kaleel, Rory Davis -- Rory, R-O-R-Y, Davis -- Dr. Staudt,
    14 Joe Uy, U-Y, and other staff members.
    15
    "For each of the people provided in answer to
    16 question 5, explain the specific role that each played in
    17 the preparation of Chapter 10 and identify the specific
    18 sections which they participated in drafting." And it is
    19 extremely difficult to answer this question, as numerous
    20 sources were consulted and the range of information
    21 provided by any given source ranges from nothing to a
    22 significant portion of a particular subsection. In
    23 general, this section was prepared by Agency personnel,
    24 including myself, and provides a summation of information
    Keefe Reporting Company
    67

    1 that was obtained from numerous sources, including
    2 Regional Transmission Organizations PJM and MISO, the
    3 Illinois Commerce Commission, Illinois Department of
    4 Commerce and Economic Opportunity, Institute of Clean Air
    5 Companies, USEPA and several environmental groups.
    6
    MR. FORCADE: In that -- I'm sorry. In that
    7 case, Mr. Ross --
    8
    HEARING OFFICER TIPSORD: Try the one behind
    9 you. The battery may be dead.
    10
    MR. FORCADE: In that case -- Is that
    11 working?
    12
    HEARING OFFICER TIPSORD: Yeah.
    13
    MR. FORCADE: In that case, Mr. Ross, could
    14 you identify who may have participated in the preparation
    15 of Section 10.3, "Potential Economic Benefits other than
    16 Health-Related"?
    17
    MR. ROSS: Give me a second to look at that.
    18 That would be myself and the assistance of Illinois PIRG.
    19 PIRG is an acronym for Public Interest Research Group, I
    20 believe.
    21
    MR. FORCADE: Could you identify who from
    22 Illinois PIRG participated in drafting and reviewing this
    23 section?
    24
    MR. ROSS: They provided information to
    Keefe Reporting Company
    68

    1 myself. It was -- I believe my contact there was Rebecca
    2 Stanfield.
    3
    HEARING OFFICER TIPSORD: I'm sorry. Was
    4 that Rebecca Stanfield?
    5
    MR. ROSS: That's correct.
    6
    MR. FORCADE: And what information did she
    7 provide?
    8
    MR. ROSS: She provided information -- in
    9 particular the information contained in Table 10.1 and
    10 some of the information on cost and revenues associated
    11 with fishing and hunting and wildlife activities.
    12
    MR. FORCADE: And how did she provide this
    13 information to you? Did she provide you copies of
    14 reports, or how?
    15
    MR. ROSS: I believe she provided me a paper
    16 that had this information on it and then we talked in a
    17 phone conversation and then once in person.
    18
    HEARING OFFICER TIPSORD: Can I ask a
    19 question? Was this information presented, like, at the
    20 stakeholders' meetings or was this just between --
    21
    MR. ROSS: During the stakeholder meetings,
    22 correct.
    23
    MR. FORCADE: Just as an example, Mr. Ross,
    24 I believe that Table 10.1 says economic information on
    Keefe Reporting Company
    69

    1 sportfishing, jobs, 12,886. Is there any independent
    2 verification other than a communication with Rebecca that
    3 12,886 jobs are associated with sportfishing?
    4
    MR. ROSS: I did ask staff to look that over
    5 and let me know if there were some inconsistencies in
    6 data, and I was not made aware of any inconsistencies in
    7 the data.
    8
    MR. FORCADE: And the economic output is
    9 listed as I believe 1.6 billion dollars. Is there any
    10 independent verification for that?
    11
    MR. ROSS: Same thing occurred. I asked
    12 staff to look it over and I was not made aware of any
    13 inconsistencies.
    14
    MR. FORCADE: Can I ask who in staff?
    15
    MR. ROSS: I believe it was at the time Rory
    16 Davis, Joe Uy.
    17
    MR. FORCADE: And do you know on what basis
    18 they concluded that there were no inconsistencies --
    19
    MR. ROSS: No, I do not.
    20
    MR. FORCADE: -- and inconsistencies with
    21 what?
    22
    MR. ROSS: I believe a review of the
    23 literature.
    24
    MR. FORCADE: Will Rebecca Stanfield be
    Keefe Reporting Company
    70

    1 testifying about these numbers?
    2
    MR. ROSS: She -- Not on behalf of the
    3 Agency.
    4
    MR. FORCADE: Will Rory Davis be testifying
    5 about these numbers?
    6
    MR. ROSS: No.
    7
    MR. FORCADE: Do you have any independent
    8 knowledge or research of your own to verify the numbers
    9 contained in Table 10.1?
    10
    MR. ROSS: No.
    11
    HEARING OFFICER TIPSORD: Ms. Bassi?
    12
    MS. BASSI: In what fashion was this
    13 provided during stakeholder meetings, this information?
    14
    MR. ROSS: As I mentioned, through -- she
    15 provided a document. She contained that document in an
    16 e-mail, and then we met with the environmental groups on
    17 several occasions during the stakeholder process, as we
    18 offered to meet with everyone. The environmental groups
    19 readily took us up on that offer and we met with them
    20 several times.
    21
    MS. BASSI: Yes, I see. Does Miss
    22 Stanfield -- is that her name?
    23
    MR. ROSS: Yes.
    24
    MS. BASSI: -- have any expertise in this
    Keefe Reporting Company
    71

    1 area?
    2
    MR. ROSS: I can't answer that. I do not
    3 know.
    4
    MS. BASSI: How does the Agency rely on
    5 something where you can't verify the expertise?
    6
    MR. ROSS: They provided us information. I
    7 asked staff to look into it.
    8
    MS. BASSI: But they -- But I think you just
    9 said staff didn't verify it; they just verified there was
    10 no inconsistencies. What did they look at?
    11
    MR. ROSS: I believe they did a literature
    12 research. They did some research to check the numbers.
    13 I would have to specifically ask them that question,
    14 which I have not, and probably get back to you. We just
    15 felt it was important that we provide information on this
    16 topic, and we tried to characterize it as -- and we did
    17 in fact characterize it as potential impacts.
    18
    MS. BASSI: 12,886 is pretty unpotential.
    19 It's a pretty definite number.
    20
    MR. KIM: Is that a question?
    21
    MS. BASSI: Isn't it?
    22
    MR. ROSS: It's a large number, but again,
    23 it's in the context how we present it, and we present it
    24 as potential economic benefits, so we were doing what we
    Keefe Reporting Company
    72

    1 felt the best we could given our limitations with staff
    2 to provide information to the Board and others in our
    3 Technical Support Document related to the impact of the
    4 mercury rule, so --
    5
    MS. BASSI: So the best economic -- positive
    6 economic result from this rule is potentially 12,886 jobs
    7 in fishing, hunting -- in the fishing and hunting
    8 industry?
    9
    MR. ROSS: I believe that was identified as
    10 one of the potential positive impacts of the rule.
    11
    CHAIRMAN GIRARD: Mr. Ross, I have a
    12 question. You have a list of references at the back of
    13 the TSD. Are any of these references listed among the
    14 documents that you used to come up with Table 10.1?
    15
    MR. ROSS: I would have to review that, but
    16 it was submitted to be listed, so I believe it should be
    17 in there.
    18
    CHAIRMAN GIRARD: Well, do you need some
    19 time to look that over or -- I'm not saying we'd take the
    20 time right now, but --
    21
    MR. ROSS: Yeah, I would need time.
    22
    CHAIRMAN GIRARD: Also you mentioned that
    23 you did get some other documents from some other
    24 individuals. Have those documents been placed into the
    Keefe Reporting Company
    73

    1 record? Are they in a larger box of records that backs
    2 up the different sections?
    3
    MR. ROSS: To a large part, we definitely
    4 tried to include all the documents that we looked at and
    5 referenced in our list of references, so I would say yes,
    6 but have I myself gone back and reviewed and
    7 cross-compared to make sure? I have not. So I believe
    8 we definitely submitted all those documents to the person
    9 who was responsible for compiling a list of references.
    10 Did they actually make it on there? I would think so.
    11 Have I gone back and independently verified it? No, I
    12 have not.
    13
    HEARING OFFICER TIPSORD: Well, I would
    14 think at a minimum we need to be sure and identify the
    15 set of documents from Rebecca Stanfield. You should
    16 probably specifically give us the title and reference.
    17
    MR. KIM: Well, and we will look at it. I'm
    18 assuming that the reference is actually on the bottom of
    19 page 189 of the TSD, that this is information provided
    20 from the American Sportfishing Association, but we will
    21 look into that and find out where the specific literature
    22 is. If it's not in the TSD as a specific exhibit, we'll
    23 try and get copies as soon as possible.
    24
    MR. ROSS: And we have a day or so set aside
    Keefe Reporting Company
    74

    1 to discuss I believe Section 10 of the Technical Support
    2 Document, and at that time I will have done a thorough
    3 look-back and evaluation of everything in Section 10. I
    4 have not done that at this time due to the large number
    5 of questions. I'm trying to take everything kind of in
    6 stride as they come up, so I did not focus my studies on
    7 Section 9 and 10 since they will be later in the hearing.
    8
    MR. KIM: But we will try to find out if
    9 we've got that documentation, and if we do, we'll have it
    10 before that time comes.
    11
    HEARING OFFICER TIPSORD: And like I said, I
    12 mean, just as -- it would make things easier, because if
    13 we all knew that the document Rebecca Stanfield supplied
    14 to you was something already in here, that would maybe
    15 better direct the questions. It just sounded like it
    16 might not be, so --
    17
    MR. KIM: Right, and that's why I -- and I
    18 think to further that, as soon as we have it, we won't
    19 wait until that topic comes up. We'll get it as soon as
    20 possible so that people have a chance to look at it
    21 before we get there.
    22
    HEARING OFFICER TIPSORD: Mr. Forcade?
    23
    MR. FORCADE: Yes. Just as a sort of a
    24 preview of where I would like to go once we get the
    Keefe Reporting Company
    75

    1 information, I had questions relating to whether the jobs
    2 listed were full time or part time, how the economic
    3 information was calculated, what calendar year or the
    4 time period does the information relate to. I'm assuming
    5 it would -- the Agency's preference was that those
    6 questions be asked at a later time?
    7
    MR. KIM: I'm guessing we'll find out how
    8 specifically precise we can be in answering your
    9 questions after we locate the data and see what's in
    10 there.
    11
    HEARING OFFICER TIPSORD: Mr. Zabel?
    12
    MR. ZABEL: Just so I'm clear, Mr. Ross,
    13 this is purely a quantification of whatever someone
    14 thinks the current level of this sporting activity is in
    15 Illinois. It's no projection of the impact of the rule.
    16
    MR. ROSS: I'm not certain. I need to go
    17 back and review that particular section.
    18
    MR. ZABEL: Table 10.1 says sportfishing in
    19 Illinois for 2001. Rule obviously wasn't in effect in
    20 2001, so this is just historic data based on somebody's
    21 calculation; is that correct?
    22
    MR. ROSS: That's what it certainly appears
    23 to be, yes.
    24
    MR. ZABEL: And there's no quantification in
    Keefe Reporting Company
    76

    1 Section 10.3 of what that potential impact might be; is
    2 that correct?
    3
    MR. ROSS: That's correct. I also would
    4 like to add that our economic expert I believe has looked
    5 at this information and will be able to provide insight
    6 or perhaps independent verification of some of the
    7 numbers.
    8
    MR. ZABEL: And again, is that Dr. Hausman?
    9
    MR. ROSS: Yes, it is.
    10
    MR. ZABEL: And last question, what does the
    11 Agency mean by potential?
    12
    MR. ROSS: Possible.
    13
    MR. ZABEL: Thank you.
    14
    HEARING OFFICER TIPSORD: Are we ready for
    15 question 7?
    16
    MR. ROSS: 7, "What information did you use
    17 to determine the economic effect of the proposed mercury
    18 control regulations as stated in the TSD and where did
    19 you obtain that information?" The Agency took several
    20 steps to determine the economic effect of the proposed
    21 rule as stated in the TSD, including retaining the
    22 services of ICF Resources to conduct economic modeling.
    23 We retained the services of mercury cost and control
    24 expert Dr. Staudt and we conducted our own research and
    Keefe Reporting Company
    77

    1 analysis.
    2
    HEARING OFFICER TIPSORD: Mr. Forcade?
    3
    MR. FORCADE: Could you describe your own
    4 economic research and analysis, please?
    5
    MR. ROSS: Yeah. I think I did that
    6 initially, but we spoke with many experts. We conducted
    7 a literature research. We had many, many meetings. We
    8 also spoke with utilities as part of the stakeholder
    9 process. We ironed out some of the issues. We relied a
    10 great deal on what other state agencies had done, to some
    11 extent on what other state agencies had done, the
    12 Michigan report and what USEPA had performed, so those
    13 are some of the things we did.
    14
    MR. FORCADE: Who within the Agency would
    15 have done that?
    16
    MR. ROSS: Numerous staff members.
    17
    MR. FORCADE: Would you please describe all
    18 of the economic training, degrees and background of
    19 numerous staff?
    20
    MR. ROSS: I can only speak for myself on
    21 that, and I've gone into my economic background. I don't
    22 have the economic credentials of all staff in front of
    23 me, but --
    24
    MR. FORCADE: Is there anyone within the
    Keefe Reporting Company
    78

    1 Agency that was charged with looking at research and
    2 other inquiries that you are aware of having economic
    3 education or degrees?
    4
    MR. ROSS: No, not that I'm aware of.
    5 That's one reason we thought it essential to retain
    6 the -- retain Dr. Staudt to assist us in this process.
    7
    MR. FORCADE: In addition to the information
    8 you received from ICF and I'm not sure to the extent
    9 Dr. Staudt and Dr. Hausman may have collaborated, were
    10 the conclusions of anyone in the Agency at odds with
    11 those opinions?
    12
    MR. ROSS: Of Dr. Staudt's opinions?
    13
    MR. FORCADE: And the ICF report and
    14 Dr. Hausman.
    15
    MR. ROSS: Well, I've discussed the ICF
    16 report. With Dr. Staudt, I believe it was general
    17 consensus.
    18
    MR. FORCADE: I'm sorry. You've listed
    19 three entities supporting the economic position of the
    20 Agency.
    21
    MR. ROSS: Right.
    22
    MR. FORCADE: One of them was the ICF
    23 report, one of them was Dr. Staudt, one was Dr. Hausman.
    24 You've also mentioned that there were numerous people
    Keefe Reporting Company
    79

    1 within the Agency who reviewed or evaluated economic
    2 information. What I'm trying to find out, if any of the
    3 numerous people within the Agency have disagreements or
    4 alternative opinions to Dr. Staudt, Dr. Hausman and the
    5 ICF report.
    6
    MR. ROSS: Certainly, but the -- just to
    7 clarify, the question was regarding the economic impacts
    8 determined for the TSD. At the time of development and
    9 publication of the TSD, we had not retained the services
    10 of Dr. Hausman, so I did not include him as a resource
    11 that was used to develop the Technical Support Document,
    12 but certainly there were disagreements, and we discussed
    13 numerous options and --
    14
    MR. FORCADE: I'm simply trying to find out,
    15 in an effort to probe the question of the Agency's
    16 economic position, do I need to go beyond the ICF report
    17 and Dr. Staudt and Dr. Hausman? If the answer is no --
    18
    MR. ROSS: No.
    19
    MR. FORCADE: You stated this was the
    20 information that you relied upon. What was the
    21 information that you provided to the ICF Resources,
    22 Incorporated, to Dr. Staudt and Dr. Hausman?
    23
    MR. ROSS: To both of them, I believe we
    24 provided everything they requested, but most certainly
    Keefe Reporting Company
    80

    1 the -- and we'll get into talking about the IPM modeling
    2 in detail, and at that time I will have thoroughly
    3 reviewed it, but we provided all the inputs for the
    4 model. We had several discussions prior to modeling on
    5 how to best model Illinois' proposed rule, and the IPM
    6 modeling did not lend itself for a direct correlation
    7 between what they could model and what our rule required,
    8 so we did have to make some concessions or some changes
    9 to how they would model our rule, and it would -- there
    10 was general agreement that where we change the parameters
    11 that we would model, we would err on the side of being
    12 conservative; that is, we would model a more stringent
    13 rule than what we were actually proposing so that the
    14 results in turn would be more conservative for a more
    15 stringent rule than what Illinois was proposing, so the
    16 impacts would be conservative.
    17
    MR. FORCADE: Would it be more prudent to
    18 hold some of these questions for -- I'm happy to explore
    19 them now or later, but the impression I'm getting from
    20 Mr. Ross is perhaps some of his questions would be better
    21 addressed later; is that correct?
    22
    MR. KIM: And -- Well, I think so, if
    23 nothing else, because I think there is a request that at
    24 least Mr. Forcade has made for some documentation that
    Keefe Reporting Company
    81

    1 was exchanged back and forth between the Agency and ICF,
    2 and we're in the process of trying to compile all that
    3 and get that ready, so I'm assuming that after you get
    4 that information you'd probably be in a better position
    5 to frame the questions. And that -- we're hoping to have
    6 that done in the next -- I'm hoping by tomorrow morning,
    7 no later.
    8
    MR. FORCADE: With permission, then, I'd
    9 like to hold question 8 and go to 9, if I could.
    10
    MR. ROSS: Question 9 will be answered by
    11 Dr. Staudt.
    12
    MR. FORCADE: Okay.
    13
    MR. ROSS: Question 10, "Tables 8.5 and 8.6
    14 of the TSD list typical mercury content of coal and
    15 projected mercury in coal. What is the Agency's
    16 understanding of how representative these values are for
    17 the coal fired at each of the coal-fired electric
    18 generating units in Illinois?" The Agency believes the
    19 values in Table 8.5 to be representative of the typical
    20 characteristics of bituminous and sub-bituminous coals
    21 and that the information in the table and the resource is
    22 reliable.
    23
    Question b, "If analytical inaccuracies showed a
    24 mercury content that was 5 percent higher or lower than
    Keefe Reporting Company
    82

    1 the actual value, what impact would this have on the
    2 nature of the control technology required to achieve a 90
    3 percent reduction?" And this question is kind of
    4 difficult to answer. Coal properties are just simply one
    5 variation in an equation to determine compliance. We
    6 would first like to note that the proposed rule does not
    7 mandate compliance with one single standard. Rather, it
    8 provides the option of choosing between two standards
    9 derived differently. One standard is a mercury reduction
    10 efficiency and the other is an output-based emission
    11 rate, and companies are allowed to utilize any available
    12 control technology and methods to achieve compliance.
    13 And the capture of mercury is a function, as I mentioned,
    14 of many variables and not just coal mercury content as
    15 the question leads one to believe. Some of the variables
    16 include control configurations used, such as ESP,
    17 scrubbers, SCRs, fabric filters, other properties of the
    18 coal, chlorine content, unburned ash that occurs that is
    19 burned, temperature and coal sulfur levels, and many of
    20 this will be discussed in detail by Dr. Staudt, who is
    21 our mercury control expert, and so further discussion of
    22 this question is probably best left to him. It is a
    23 technical question.
    24
    MR. FORCADE: I don't mind withholding the
    Keefe Reporting Company
    83

    1 question for Dr. Staudt, but I would note that it didn't
    2 get answered here.
    3
    MR. ROSS: Well, there is no one specific
    4 answer to this. The question seems to imply that a 5
    5 percent variation in coal mercury content directly
    6 correlates to some increase or decrease in the mercury
    7 emission levels, and I think it's the Agency's
    8 position -- and Dr. Staudt will back this up -- that you
    9 can't make that direct correlation in a broad sense.
    10 There are so many different variables involved. There
    11 are so many different control configurations on the
    12 Illinois EGUs that the broad nature of the question does
    13 not allow for a direct answer.
    14
    MR. FORCADE: Perhaps I should rephrase it,
    15 then. If you have one facility that is operating trying
    16 to achieve a 90 percent reduction in mercury -- and
    17 you're shaking your head no.
    18
    MR. ROSS: Well, that doesn't go down to the
    19 specifics. You'd have to be -- Like I said, there's many
    20 variations there, the type of coal being used, the
    21 control configurations at that facility, do they have --
    22 what are they -- are they firing sub-bituminous coal,
    23 bituminous coal, do they have ESP -- cold-side ESP only,
    24 is it a hot-side ESP; if they're firing bituminous coal,
    Keefe Reporting Company
    84

    1 do they have an SCR, ESP and scrubber. So there's many,
    2 many variations that go into answering that particular
    3 question, and again, when you get down to what each
    4 facility is doing, I think we're going to go over that in
    5 detail in -- with Dr. Staudt present here. It's my
    6 inclination to believe that we will almost be going over
    7 each EGU, all 59 of them in the state, perhaps, and what
    8 control configurations each of them have and how the
    9 different controls or options for compliance would be
    10 applied for each of them, so that question is definitely
    11 better answered at that time, and it -- the nature of the
    12 question, it's just too broad. You're not being
    13 specific, and so there is no specific answer, but there
    14 will be when we pick a specific EGU at a specific
    15 facility and you ask that question. I'm sure we'll be
    16 able to answer it to some degree just what variations
    17 would occur.
    18
    MR. FORCADE: Let me then rephrase it one
    19 more time. If you took one specific facility, such as
    20 Kincaid Generation, LLC, burning one specific type of
    21 coal with one specific configuration, with one specific
    22 set of operating parameters, and there was a 5 percent
    23 variation in the amount of coal mercury coming into the
    24 facility, what would you expect the result to be in terms
    Keefe Reporting Company
    85

    1 of the percent reduction achieved?
    2
    MR. ROSS: I would have to review Kincaid
    3 Generation's control configurations, but I would expect
    4 it would not be adversely impacted to the degree the
    5 question may be implying that --
    6
    MR. FORCADE: I'm not implying --
    7
    MR. ROSS: -- a 5 percent variation in coal
    8 mercury content results in a 5 percent variation in the
    9 mercury emitted. It actually depends on what control is
    10 being applied, and we'll get into this in detail with
    11 Dr. Staudt.
    12
    MR. FORCADE: I'll rephrase the question for
    13 Dr. Staudt when his testimony comes up, then.
    14
    HEARING OFFICER TIPSORD: Ms. Bassi, you had
    15 a question?
    16
    MS. BASSI: Sorry.
    17
    HEARING OFFICER TIPSORD: That's okay.
    18 Before we -- Mr. Ross, when is the Agency planning on
    19 presenting Dr. Staudt?
    20
    MR. ROSS: Well, I think the plan was to
    21 hopefully get through a lot of my questions, and I think
    22 the next person on the schedule would be Dick Ayres in
    23 Section 6 of the Technical Support Document, followed by
    24 Section 7 of the Technical Support Document, which would
    Keefe Reporting Company
    86

    1 be myself and Chris Romaine, and then Dr. Staudt, so
    2 depending on how quickly we get through these questions,
    3 we can get to Dr. Staudt. I would like to note I still
    4 have over 100 questions left to answer.
    5
    HEARING OFFICER TIPSORD: I understand that.
    6
    MR. ROSS: And that's why I'm trying to
    7 defer some of these.
    8
    HEARING OFFICER TIPSORD: And that's -- I
    9 guess that's sort of somewhat of my concern, is that I
    10 understood we were going to get answers to questions, and
    11 we're getting a lot of deferring.
    12
    MR. KIM: Well, the reason we did that was
    13 when we discussed this, you know, however long ago it
    14 was, what we said was we were going to try and present
    15 the testimony in a way that basically to the extent
    16 possible made some sense, and it seemed like -- you know,
    17 so Mr. Ross today in answering these general questions
    18 that were presented to the Agency, I think, you know, our
    19 intent or our expectation was a lot of these would be
    20 deferred, because a lot of these questions relate
    21 specifically to topics that will be addressed just a
    22 little bit down the road. We're trying to answer any
    23 remaining general questions or, you know, overarching
    24 questions right now. The development of this -- for this
    Keefe Reporting Company
    87

    1 week we thought was get the general questions out of the
    2 way; as part of that, get the regulatory oversight, which
    3 would be Mr. Ayres' testimony, out of the way. The next
    4 logical step we thought would be to discuss the emission
    5 standards, which is what led to the specifics of the
    6 rule, and then after that get into the technical
    7 feasibility of the rule and so forth, and that's where I
    8 think a lot of these questions are probably going to
    9 come.
    10
    HEARING OFFICER TIPSORD: I understand all
    11 that, and that's what you said this morning. I guess my
    12 concern is that I don't want to -- these questions have
    13 been posed, and simply by deferring them, they will be
    14 answered ultimately, and I know you said that, but I just
    15 want to be clear that, Mr. Ross, you may have over 100
    16 questions, but I already have on my list about 12
    17 questions that have been deferred that you've already
    18 answered, and that's okay. That's fine, but I just --
    19 we're not exactly knocking off questions at the speed
    20 with which I had hoped.
    21
    MR. KIM: Well, I guess our problem is this:
    22 The general Agency questions range, you know, the entire
    23 gamut of the TSD.
    24
    HEARING OFFICER TIPSORD: I understand.
    Keefe Reporting Company
    88

    1
    MR. KIM: And if we do that -- and I know
    2 that you've been very intent -- and I think it makes
    3 sense -- to keep as clear a record as possible -- today
    4 we're going to be answering questions on modeling and
    5 technology, tomorrow we might be going back to general.
    6 You know, we're going to be jumping all over the place if
    7 we answer them in order, and that's why -- and we
    8 apologize for having to defer these, but again, it's just
    9 the manner -- and there's nothing wrong with how they
    10 presented them, but it's just the manner in which they
    11 were presented that we're trying to grapple with.
    12
    HEARING OFFICER TIPSORD: And not a problem.
    13 I don't have a problem and I don't think anyone else here
    14 does in deferring questions on the Technical Support
    15 Document's specific sections till when the experts are
    16 here. Like I said, I just wanted to clear that up.
    17
    MR. KIM: We're keeping a list too.
    18
    HEARING OFFICER TIPSORD: I think they're
    19 now saying Dr. Staudt Wednesday or Thursday?
    20
    MR. KIM: We're hoping sooner, but he's --
    21 again, he's here all week. I think he's in -- he's doing
    22 probably his normal work right now, but -- somewhere in
    23 the building, but we're hoping to get done with Mr. Ross
    24 today, if we're lucky maybe get to either Mr. Ayres or
    Keefe Reporting Company
    89

    1 Mr. Romaine today, get them taken care of, and then the
    2 next step, we thought, was going to be our vendors, which
    3 goes along with some of the questions we've deferred to
    4 Mr. Foerter and Mr. Nelson. They will address the
    5 technical -- you know, the equipment issues, and then
    6 we'll go to Dr. Staudt.
    7
    HEARING OFFICER TIPSORD: All right. Thank
    8 you.
    9
    MR. FORCADE: In question --
    10
    HEARING OFFICER TIPSORD: Let's go off the
    11 record for just a second.
    12
    (Brief recess taken.)
    13
    HEARING OFFICER TIPSORD: I -- Part of my
    14 concern here, Mr. Kim, is that I'm sensing increasing
    15 frustration from the people who are asking the questions
    16 and from Mr. Ross trying to answer the questions and
    17 frankly, myself, because Mr. Ross is very diligently
    18 trying to answer a question, and the minute he gets a
    19 follow-up -- you know, he gives a one-paragraph answer,
    20 and then as he gets a follow-up, we're being told, "Well,
    21 gee, I'll have to defer." My preference is that if --
    22 Mr. Ross, if you believe you're not going to be able to
    23 fully answer the question, let's just defer them. Let's
    24 not get a paragraph and get a whole bunch of follow-ups
    Keefe Reporting Company
    90

    1 that end up with everybody saying, "Okay, then I guess
    2 I'll have to wait," because I'm really sensing
    3 frustration building and I do not -- I share that
    4 frustration, and I -- from everyone. I mean, Mr. Ross is
    5 getting frustrated and I -- people asking the questions
    6 are getting frustrated, so if we can, if you don't think
    7 you can fully answer the question and the follow-ups,
    8 let's defer them until whoever's more -- whoever you're
    9 going to be in the panel with, whether it's
    10 Dr. Hausman -- or is it Mr. Hausman?
    11
    MR. KIM: Dr.
    12
    HEARING OFFICER TIPSORD: Dr. Hausman,
    13 Dr. Staudt, whomever, Chris Romaine.
    14
    MR. KIM: Yes. That would ease a lot of the
    15 frustration, I think, on Mr. Ross' part.
    16
    HEARING OFFICER TIPSORD: I think so too,
    17 and I think that -- like I said, I think we're all
    18 getting that frustration and I think it's probably best.
    19 Mr. Forcade, just to fill you in quickly, if Mr. Ross
    20 cannot fully answer a question and follow-ups, he's going
    21 to just state that he's going to defer rather than give a
    22 short answer, then that results in follow-ups which he
    23 can't answer.
    24
    MR. ROSS: And many of these questions are
    Keefe Reporting Company
    91

    1 similar, if not identical, to the questions that have
    2 been asked of our experts, but they were addressed to the
    3 Agency so I was trying to present the Agency's initial
    4 perspective with perhaps a more detailed follow-up to be
    5 given later, and that's what I'm trying to convey.
    6
    MR. KIM: But we're not going to --
    7
    HEARING OFFICER TIPSORD: And I understand
    8 that, and I -- but I -- like I say, I mean, I sense your
    9 own frustration with getting these questions too, so I --
    10 perhaps it'd be best to do it that way.
    11
    MR. KIM: We prefer your approach by far.
    12
    HEARING OFFICER TIPSORD: Mr. Harrington?
    13
    MR. HARRINGTON: That was the purpose of my
    14 earlier question that was deferred, which is if the
    15 Agency is not the technical witness on this point and not
    16 offering independent testimony, then we're happy to see
    17 it deferred to somebody else who is, but we don't want
    18 the record to have the implication that the Agency
    19 through the Technical Support Document or the testimony
    20 is offering independent expertise which they don't have
    21 and which I think is basically what Mr. Ross has been
    22 telling us, that they're relying on third parties.
    23 That's fine. We'll get to the third parties.
    24
    MR. KIM: And I think in every case where
    Keefe Reporting Company
    92

    1 there is either Dr. Staudt or Dr. Hausman providing
    2 testimony, as Mr. Ross stated, he'll be on the panel at
    3 the same time in case -- you know, if a question's asked
    4 and they say, "Well, what's the Agency's position on
    5 that," Mr. Ross will be right here and he can fill that
    6 gap in.
    7
    MR. FORCADE: So should I assume from that
    8 that to the extent that Mr. Ross does not say this will
    9 be addressed later that the Agency is going to provide a
    10 full and complete answer to the question?
    11
    MR. KIM: Well, we intend to answer all the
    12 questions. It's just -- What -- I think what -- and this
    13 is what the Hearing Officer was getting and what Mr. Ross
    14 was getting at. You're going to hear part of your answer
    15 if we go this way. You're going to hear the Agency's
    16 perspective, but then there's this gap where the
    17 technical -- the -- you know, the outside witness is not
    18 here. I think it's going to make a much clearer record
    19 and your answer's going to get answered -- your questions
    20 will be answered much better if they're both here at the
    21 same time, and we would much prefer to be able to not get
    22 into it and just put it off.
    23
    HEARING OFFICER TIPSORD: Let's -- Then
    24 let's proceed with that. Mr. Rieser?
    Keefe Reporting Company
    93

    1
    MR. RIESER: And I assume that by having
    2 Mr. Ross available, we'll be able to clarify exactly what
    3 portion of the -- for example, a statement in the TSD is
    4 based on the expert witness and what portion is based on
    5 information that the Agency developed on its own or
    6 confirmed on its own.
    7
    HEARING OFFICER TIPSORD: Yeah.
    8
    MR. KIM: Exactly.
    9
    HEARING OFFICER TIPSORD: Yeah. All right.
    10 Let's proceed.
    11
    MR. ROSS: Well, I would say a quick review
    12 of the questions from Kincaid Generation, they deal with
    13 cost controls and the modeling, which I would not be able
    14 to answer the majority of the follow-up questions, I
    15 predict, completely and to the satisfaction of others
    16 here, so perhaps we should defer them.
    17
    BOARD MEMBER MOORE: There you go.
    18
    MR. FORCADE: Some of the questions, such
    19 as, "List any and all documents used in the preparation
    20 of Table 10.3," I think would have to be answered by the
    21 Agency. I mean, I don't know how we could rely upon the
    22 expert and --
    23
    MR. ROSS: Well, that's fine, and the answer
    24 to that I think I addressed to some degree, maybe not
    Keefe Reporting Company
    94

    1 completely, but all the documents that we used for
    2 Section 10 were provided in the references, I believe.
    3 Now, I think what you're asking is that we go back and
    4 specifically tag or label the specific documents that we
    5 used for Section 10 as being used for Section 10, and
    6 that is something perhaps that we have not done and will
    7 require some effort, follow-up effort.
    8
    MR. FORCADE: My concern is that the
    9 references in Section 10 alone I think contain close to
    10 50 references, some of which are obviously quite thick.
    11 I'm not sure that it's realistic to expect that I'll be
    12 able to wade through 50 documents to figure out which one
    13 of them might make a reference to something from 10.
    14
    HEARING OFFICER TIPSORD: Well, I believe
    15 they already indicated that they were going to do that?
    16 Or did I misunderstand earlier, that you were going to
    17 provide -- oh, that was --
    18
    MR. KIM: That was as to one specific table.
    19 I'm sorry.
    20
    HEARING OFFICER TIPSORD: I apologize,
    21 Mr. Forcade. I lost track of which table we were talking
    22 about.
    23
    MR. ROSS: And we will be dedicating a
    24 portion of this hearing, I believe, to Section 10, and a
    Keefe Reporting Company
    95

    1 lot of the information -- it depends on which particular
    2 portion of Section 10 you're talking about, but some of
    3 that information was just a best effort by the Agency
    4 after review of literature and discussions with outside
    5 experts to present the information in a Technical Support
    6 Document.
    7
    MR. FORCADE: Have all the references in
    8 Section 10 been entered into the record?
    9
    MR. ROSS: I would say all the documents
    10 that were relied upon have been entered into the record.
    11 What we did not do, I'm certain of, was all the
    12 conversations we had with experts, all of our
    13 consultations, whether they be individual conversations
    14 or conference calls or when we spoke with people in
    15 person, which were numerous, we have not identified each
    16 and every one of those events.
    17
    MR. FORCADE: The references in Chapter 10
    18 start on page 209 and proceed for several pages listing
    19 approximately 50 written references. Have those 50 --
    20 approximately 50 written references been entered into the
    21 record?
    22
    MR. KIM: They are, but it's an alphabetical
    23 listing. Is that what you were getting at? It's not --
    24
    MR. FORCADE: The listing that begins on
    Keefe Reporting Company
    96

    1 209 --
    2
    MR. KIM: Yes.
    3
    MR. FORCADE: -- and goes to 214, have each
    4 of those documents been entered into the record?
    5
    MR. KIM: I think maybe to clarify, that's
    6 not the Section 10 references. Those are the references
    7 for the TSD, so just because -- it's at the end of
    8 Section 10 because that's the last section of the --
    9 there aren't -- it's not broken up by section, if that's
    10 what you're asking.
    11
    MR. FORCADE: Okay. If I want to try and
    12 track down what references there are that would discuss
    13 issues raised in Section 10 of the Technical Support
    14 Document, how would I do that?
    15
    MR. KIM: We can try and identify those.
    16 Again, we'll try and get that done overnight so that
    17 tomorrow morning -- or maybe this afternoon.
    18
    MR. FORCADE: Could I make that for 8, 9,
    19 and 10?
    20
    HEARING OFFICER TIPSORD: Ms. Bassi?
    21
    MS. BASSI: Mr. Ross, did anyone besides
    22 people who are employees of Illinois EPA and the expert
    23 witnesses that have been identified that Illinois EPA has
    24 retained for the development of this rule review any
    Keefe Reporting Company
    97

    1 portion of the TSD before it was submitted to the Board?
    2
    MR. ROSS: I'm thinking. To the best of my
    3 knowledge, one particular portion in Section 10 was
    4 reviewed by a party other than what you described.
    5
    MS. BASSI: And which section of -- which
    6 portion of Section 10 was that?
    7
    MR. ROSS: The portion regarding the
    8 Temporary Technology Based Standard.
    9
    MS. BASSI: In Section 10?
    10
    MR. ROSS: In Section 10.
    11
    MR. KIM: Section 10.10.
    12
    MS. BASSI: And who was that party?
    13
    MR. ROSS: The Environmental Law & Policy
    14 Center.
    15
    MS. BASSI: And why were they allowed to
    16 review this before it was submitted?
    17
    MR. ROSS: We were working with them -- or
    18 they had expressed interest and we were working with them
    19 through the stakeholder process. They had many comments
    20 and inputs on this particular portion of our rule.
    21
    MS. BASSI: Is it the Agency's practice to
    22 allow, if you will, inside quotes, outsiders to review a
    23 document that the Agency is presenting to the Board prior
    24 to its presentation?
    Keefe Reporting Company
    98

    1
    MR. ROSS: Practice? I don't know if I can
    2 speak to that. I know that they were stakeholders
    3 involved in the process of rule development and they had,
    4 like I said, been involved in this particular portion
    5 more than others, and through many of the meetings that
    6 we had had with them, they expressed interest in this
    7 particular portion more than others and so we shared it
    8 with them.
    9
    MS. BASSI: Did you offer to share drafts of
    10 the TSD with any other groups?
    11
    MR. ROSS: No, I don't believe so. We had
    12 offered -- With the other groups several times at the
    13 stakeholder meetings we had offered to meet with them, to
    14 speak with them, to conference call --
    15
    MS. BASSI: Did you offer -- I'm sorry.
    16
    MR. ROSS: And it was during the context of
    17 one of these meetings, conference calls, where we were
    18 specifically discussing this portion of the rule where I
    19 believe it was decided to let them see this particular
    20 portion.
    21
    MS. BASSI: Are you aware of any other
    22 rulemaking in which this practice occurred, where a
    23 portion of a document that was to be submitted to the
    24 Board was shared with an, again in quotes, outside group?
    Keefe Reporting Company
    99

    1
    MR. ROSS: No, I'm not, but I have not been
    2 involved in any other rulemaking to -- so intimately as
    3 I'm involved in this one, so --
    4
    MS. BASSI: We understand. And we also
    5 understand that I believe you said you started in this
    6 particular position in October of 2005?
    7
    MR. ROSS: That is correct.
    8
    MS. BASSI: In your work in the development
    9 of this rule and other rules that have occurred since you
    10 took this position, have you heard any -- have you had
    11 any discussion with your superiors in the Agency in this
    12 regard? And by this regard, I mean regarding the
    13 practice of sharing a draft of an Agency document to be
    14 submitted with an outside group.
    15
    MR. ROSS: Well, I want to clarify. It
    16 wasn't a draft of the document. It was a draft of this
    17 particular section only in the document. And, no, I'm
    18 not aware of any other.
    19
    MR. KIM: Can I -- I'm sorry. Can I ask
    20 my -- Can I take a side-bar?
    21
    HEARING OFFICER TIPSORD: Sure.
    22
    (Off the record.)
    23
    MR. ROSS: And he reminded me of a valid
    24 point. During one of the stakeholder meetings, we did in
    Keefe Reporting Company
    100

    1 fact hand out a draft of the Section 8 of the Technical
    2 Support Document, so we did share a draft of Section 8 of
    3 the TSD with all stakeholders, including the utilities.
    4
    MS. BASSI: Okay. And did that occur in
    5 a -- I want to say a more public meeting --
    6
    MR. ROSS: Yes.
    7
    MS. BASSI: -- than your conversations with
    8 whoever reviewed Section 10.10?
    9
    MR. ROSS: A more public forum, yes.
    10
    MS. BASSI: Were other stakeholders invited
    11 to participate in -- notified and provided -- or invited
    12 to participate in these other stakeholder meetings that
    13 you were having?
    14
    MR. ROSS: To a degree. As I explained
    15 before, during the stakeholder meetings where everyone
    16 was invited, we offered to meet with any and all parties
    17 at -- I think the way we phrased it was any time anyone
    18 is willing, we will make time to meet with them to
    19 discuss portions of the rule that concern them, so the
    20 offer was outstanding, and I believe we mentioned it at
    21 each and every one of the stakeholder meetings.
    22
    MS. BASSI: Did you provide notice of these
    23 particular meetings that you were discussing the TSD with
    24 outside groups to the -- your stakeholder -- I want to
    Keefe Reporting Company
    101

    1 say contact list, your audience in general?
    2
    MR. ROSS: Did we identify to others --
    3
    MS. BASSI: Notify. The word is notify.
    4
    MR. ROSS: Okay. Notify others on what
    5 meetings occurred outside of the public forum?
    6
    MS. BASSI: That there would be a meeting on
    7 a specific date to discuss a portion of the TSD?
    8
    MR. ROSS: No, we made no such notification.
    9
    MS. BASSI: Is this a practice that the
    10 Agency intends to continue in the future?
    11
    MR. KIM: I don't understand the relevance
    12 of that. I mean, if we're talking about what led up to
    13 this rule today, that's fine. If we're talking about
    14 what the Agency's going to do tomorrow --
    15
    MS. BASSI: I'll withdraw the question.
    16
    HEARING OFFICER TIPSORD: Mr. Forcade?
    17
    MR. FORCADE: Mr. Ross, I believe you said
    18 that communications with the Environmental Law & Policy
    19 Center. Would that be Howard Learner's group?
    20
    MR. ROSS: That's correct.
    21
    MR. FORCADE: Who is the person you spoke
    22 with there?
    23
    MR. ROSS: Faith Bugel.
    24
    MR. FORCADE: One other question. I believe
    Keefe Reporting Company
    102

    1 you stated earlier that Table 10.1 was information
    2 provided by Rebecca Stanhill?
    3
    MR. ROSS: Stanfield.
    4
    MR. FORCADE: Stanfield. Was Miss Stanfield
    5 provided a copy of Section 10.3, which includes Table
    6 10.1, prior to the submission of this document to the
    7 Board?
    8
    MR. ROSS: No, she was not.
    9
    MR. FORCADE: Was she provided any copy of
    10 the Table 10.1?
    11
    MR. ROSS: No, she was not.
    12
    MR. KIM: Your second question was prior to
    13 the submission of the TSD.
    14
    MR. FORCADE: Prior to the submission of the
    15 TSD.
    16
    MR. ROSS: The answer is no.
    17
    CHAIRMAN GIRARD: I have a -- one sort of
    18 hopefully final clarifying question on the use of
    19 references and outside experts. All of the specific
    20 figures we see in the TSD, whether they're dollar amounts
    21 or number of jobs, etc., do all of these very specific
    22 figures come out of the references that are listed at the
    23 back or has any of this information come in personal
    24 comments from individuals you consulted with?
    Keefe Reporting Company
    103

    1
    MR. ROSS: I believe to a large extent the
    2 former; that is, the tables and charts come from
    3 documents referenced in the back. We made -- In fact, I
    4 think we've generated some of these tables and charts
    5 from our own information, and I would have to go back and
    6 review -- a lot of the tables and charts, in particular
    7 in Section 8, those are Dr. Staudt's tables and charts,
    8 so they come from Dr. Staudt. I don't believe he
    9 provides a reference of each and every document that he
    10 took these tables from, so I don't think we've documented
    11 items to that extent, if that helps clarify things.
    12
    CHAIRMAN GIRARD: Well, that helps. If
    13 Dr. Staudt is going to be here, he can be questioned
    14 about his own data and how he generated it, but what I'm
    15 concerned about is the possibility that in a phone
    16 conversation or a personal correspondence you picked up
    17 specific information and then included it in your editing
    18 process into the TSD document, and if so, we would need
    19 to have copies of either the e-mail or the personal
    20 correspondence, whatever was used as the basis for your
    21 editorial process, to put that information in the record.
    22 So if -- I would like you to, you know, if you have a
    23 chance go back and review and make sure that, you know,
    24 all the data you have in your TSD is listed -- is
    Keefe Reporting Company
    104

    1 actually in the references that you list in the back so
    2 when individuals do their follow-up research --
    3
    MR. ROSS: Right, and that was the intent,
    4 and we did have a staff member assigned to do just that,
    5 so I think now what you're asking is reasonable. We need
    6 to go back and verify that he did his job, which is
    7 something I don't think we have done. We just relied
    8 upon him that he did his job, so we need to go back and
    9 check.
    10
    CHAIRMAN GIRARD: Thank you.
    11
    MR. ROSS: Okay.
    12
    MR. RAO: Just a follow-up on Dr. Girard's
    13 question. So when you go back and check and find out
    14 what statements were taken from the individual reference
    15 documents, are you going to provide cites in your TSD so
    16 that we can also look at those documents as to where the
    17 information's coming from?
    18
    BOARD MEMBER JOHNSON: Citations.
    19
    MR. RAO: Citations in your TSD? It's very
    20 difficult right now when we're reading it to figure out,
    21 you know, where that information is coming from.
    22
    MR. ROSS: We can go back and evaluate to
    23 what level that needs done, and then if it's readily
    24 done, we can do it. If it's something that would take a
    Keefe Reporting Company
    105

    1 significant effort and expenditure of resources, we can
    2 still do it. It just -- the timing may be not conducive
    3 to conclude by the end of this hearing. Again, we had
    4 someone whose task it was to do just that. We need to go
    5 back and review how well he did his job. He is no longer
    6 in the Bureau of Air, so -- it would be nice if he was,
    7 but he is not, so we would have to pull someone in fresh
    8 to do this, so they would essentially be starting from
    9 scratch, and I'm kind of uncertain on the level of effort
    10 and timing in which that can be performed. This is a
    11 very, very extensive document.
    12
    MR. RAO: In terms of timing, when you said
    13 whether -- you're not sure whether it could be done
    14 within the time frame of this hearing, are you referring
    15 to the Springfield hearing or --
    16
    MR. ROSS: The Springfield hearings.
    17
    MR. RAO: -- both -- Okay. If that's the
    18 case, even if it takes a little bit longer and you can do
    19 it at a later time, it would be very helpful --
    20
    MR. ROSS: Right.
    21
    MR. RAO: -- to have that information.
    22
    MR. ROSS: Sure.
    23
    HEARING OFFICER TIPSORD: Mr. Forcade?
    24
    MR. FORCADE: Well, if it turns out that
    Keefe Reporting Company
    106

    1 that's provided at a date after the Springfield hearings
    2 and if we find no correlation between the reference cited
    3 and the number in the TSD, we would want to reserve
    4 questions at that point wanting to know where this number
    5 came from.
    6
    HEARING OFFICER TIPSORD: And we can address
    7 that if the material is not ready at the end of this
    8 hearing.
    9
    MR. ROSS: And a lot of this stuff -- and
    10 we'll get to this when we get to Section 10 -- was a
    11 compilation of information and presented in a manner
    12 where we're seeking to identify potential impacts and
    13 possible outcomes, and we characterized it that way on
    14 purpose. You know, it's a result of speaking with a
    15 number of experts and reviewing a number of documents,
    16 and we're doing this to the best of our ability in
    17 recognition that the Agency did not employ an economic
    18 expert to develop these sections and write these
    19 particular portions of the TSD. However, we felt we were
    20 under an obligation to try and gather this information
    21 and present it as best we could with the understanding
    22 that we are not experts, and so we did retain experts to
    23 assist us as best we could, but we didn't want to omit
    24 certain potential impacts of the rule solely due to the
    Keefe Reporting Company
    107

    1 fact that we were not experts ourselves. We were
    2 obligated to some degree to provide the possible and
    3 potential impacts of the rule, so we did the best we
    4 could.
    5
    HEARING OFFICER TIPSORD: Mr. Harrington?
    6
    MR. HARRINGTON: Maybe a clarifying
    7 question. Do I understand from what you've said that the
    8 Agency does not necessarily stand behind and adopt as its
    9 own position any of the conclusions in Chapter 10?
    10
    MR. ROSS: No, that is not what I said. We
    11 believe that conclusions in Chapter 10 are accurate --
    12
    MR. HARRINGTON: By that you mean --
    13
    MR. ROSS: -- to the best of our ability.
    14
    MR. HARRINGTON: By accurate, you mean
    15 there -- these are potential conclusions but not
    16 necessarily ones that flow from the rule.
    17
    MR. ROSS: They are potential outcomes, an
    18 attempt to forecast to provide impacts of the rule. I
    19 don't know how better to say that.
    20
    MR. HARRINGTON: Can you --
    21
    MR. ROSS: I mean, we can't guarantee these
    22 are the outcomes that would occur. I don't think anyone
    23 could when you're trying to predict or forecast the
    24 impact of a rule. We did the best we could.
    Keefe Reporting Company
    108

    1
    MR. HARRINGTON: Well, no one's questioning
    2 that. We're just trying to understand what you're
    3 saying. You say potential. Something could be potential
    4 and have a 10 percent chance of being true or there could
    5 be a 90 percent chance of being true if you look at it in
    6 a numerical sense.
    7
    MR. ROSS: Correct.
    8
    MR. HARRINGTON: And what I'm hearing from
    9 you, you can't assign to any of these conclusions whether
    10 it's a 10 percent likelihood or a 90 percent likelihood.
    11
    MR. ROSS: Well, I'm going to invoke my
    12 ability to defer. We did ask our economic expert to
    13 review all of this, all of Section 10, all of the IPM
    14 modeling, and I believe he will be able to speak to how
    15 accurate or how good of a job we did in forecasting or
    16 predicting in some of the conclusions we've reached, to
    17 the extent that we've reached conclusions, which I
    18 believe it is extremely hard to do to reach conclusions
    19 when you're attempting to forecast and predict the impact
    20 of a rule. I think the way we've characterized that is
    21 we stated potential impacts and outcomes.
    22
    MR. HARRINGTON: Thank you.
    23
    HEARING OFFICER TIPSORD: Okay. And so
    24 we're going to defer Kincaid's 11 through 19? Or 20?
    Keefe Reporting Company
    109

    1 I'm sorry.
    2
    MR. ROSS: Yes, I believe so.
    3
    MR. ZABEL: Madam Hearing Officer?
    4
    HEARING OFFICER TIPSORD: Yes, Mr. Zabel.
    5
    MR. ZABEL: If -- I will defer to
    6 Mr. Forcade on this, but who's the witness who's going to
    7 ask -- answer 17 through 20? We're not having an ICF
    8 witness.
    9
    MR. ROSS: Well, I do want to mention that
    10 we asked ICF to testify. We discussed testifying with
    11 them. They were reluctant. They stated that they have
    12 industry clients as well as agency regulatory bodies.
    13 They were also extremely expensive, and so after
    14 discussing it with them, the decision was made that --
    15 and based upon their reluctance, the decision was made
    16 not to have them testify, but your question 17 --
    17
    MR. ZABEL: Well, I think 17, 18, 19 and 20,
    18 but as I say, I'll defer to Mr. Forcade on this.
    19
    MR. ROSS: Well, I mean, I can answer these
    20 now, but we will be discussing Section 9 --
    21
    MR. KIM: Well, I think -- I thought
    22 Mr. Zabel's question was really who was it that's going
    23 to answer these questions, not what was the answer
    24 itself. I -- Correct me if I'm wrong.
    Keefe Reporting Company
    110

    1
    MR. ZABEL: Yeah. I'm curious if we have
    2 someone -- I mean, we're deferring 10 or 11 forward, and
    3 I -- these seem to me to be -- none of your expert
    4 witnesses are going to address the ICF report.
    5
    MR. KIM: No, and again, as we stated
    6 before, Mr. Ross will be here at the same time that
    7 either Dr. Hausman or Dr. Staudt will be here, so the
    8 problem is, you know, Mr. Ross can probably answer some
    9 of these right now, but then there's that inevitable,
    10 well, let me ask -- you know, we want to try and take
    11 care of it with all people here at the same time.
    12
    MR. ZABEL: I just didn't want to lose him.
    13
    MR. KIM: No, no.
    14
    HEARING OFFICER TIPSORD: They're on my
    15 list.
    16
    MR. KIM: Unfortunately for him, he's not
    17 going anywhere.
    18
    MR. ROSS: Yeah, I will be providing the
    19 answers for them.
    20
    MR. ZABEL: That's fine. Whenever.
    21
    MR. ROSS: Okay.
    22
    HEARING OFFICER TIPSORD: Ameren, right?
    23
    MR. ROSS: I can go to Ameren, or --
    24
    HEARING OFFICER TIPSORD: Yeah, let's try
    Keefe Reporting Company
    111

    1 and get a few of those knocked off before we break for
    2 lunch, at least the first couple.
    3
    MR. ROSS: Well, in particular, question 1
    4 says for each witness, so I can only speak for Jim Ross,
    5 and if it's appropriate, instead of having each witness
    6 parade up here perhaps to answer the question, we can
    7 provide maybe written answers from the remaining
    8 witnesses? Is that possible? If they --
    9
    HEARING OFFICER TIPSORD: As to their
    10 background and researching the areas of the fate of
    11 mercury on the environment and health and environmental
    12 impacts of mercury contamination?
    13
    MR. ROSS: Yeah. I can read the question.
    14 Question 1, "For all witnesses, please describe your
    15 personal background in researching the areas of the fate
    16 of mercury on the environment and health and
    17 environmental impacts of mercury contamination." Jim
    18 Ross, I have been with the Bureau of Air at Illinois EPA
    19 for over 18 years. During that period, I have
    20 encountered mercury emissions from a variety of sources,
    21 including hazardous waste incinerators, medical waste
    22 incinerators and of course coal-fired power plants. In
    23 working on the permitting of these sources, I was
    24 involved in estimating the emissions of mercury to the
    Keefe Reporting Company
    112

    1 atmosphere. More recently I was involved in a review of
    2 the Title V permit application for the Onyx hazardous
    3 waste incinerator in Sauget, Illinois. During the review
    4 process, the Illinois EPA worked with the USEPA in
    5 assessing the hazardous emissions from the operations of
    6 that product, which include an assessment of mercury
    7 emissions and their potential for harmful impacts on
    8 public health and the environment, and since October of
    9 2005 to the present I have been involved in researching,
    10 reviewing, discussing, presenting and studying mercury
    11 emissions and the health and environmental impacts of
    12 mercury contamination specifically from Illinois
    13 coal-fired power plants.
    14
    Question 2.
    15
    HEARING OFFICER TIPSORD: Mr. Harrington?
    16
    MR. HARRINGTON: With respect to health and
    17 environmental impacts, is your Technical Support
    18 Document -- are you relying primarily on Dr. Rice's
    19 testimony?
    20
    MR. ROSS: Yes, I think it's accurate to say
    21 that we are relying primarily on Dr. Rice's testimony.
    22
    MR. HARRINGTON: And the material she
    23 referred to during her testimony?
    24
    MR. ROSS: Correct.
    Keefe Reporting Company
    113

    1
    MR. HARRINGTON: Not any independent
    2 expertise of your own; is that correct?
    3
    MR. ROSS: Yes, for the most part, that is
    4 correct. I mean, I would hate to characterize it that
    5 we're relying solely on Dr. Rice. We had staff review
    6 documents and do researches, speak with experts. Similar
    7 to what I've described what we've done for other
    8 portions, segments of the Technical Support Document, we
    9 did similar activities for the health impacts of mercury.
    10
    HEARING OFFICER TIPSORD: And I would note
    11 for the record, Mr. Harrington, that's your question
    12 number 5.
    13
    MR. HARRINGTON: Yes, it is.
    14
    MR. ROSS: Question 2, "Is it correct that
    15 Illinois EPA is relying upon the services of Dr. Gerald
    16 Keeler to discuss mercury deposition and to provide
    17 technical information on these issues?" And it goes on
    18 to say, "Is it not correct that either you nor the Agency
    19 personnel have any personal expertise in these areas of
    20 deposition?" And we tackled that to some degree on my
    21 first day of testimony, my level of expertise in these
    22 areas, but Dr. Keeler was retained by the Agency for the
    23 purposes stated, and none of the Agency personnel are as
    24 familiar with mercury deposition as Dr. Keeler. However,
    Keefe Reporting Company
    114

    1 Marcia Willhite did participate in the development of the
    2 Technical Support Document in these areas and also
    3 provided testimony.
    4
    HEARING OFFICER TIPSORD: Ms. Bassi?
    5
    MS. BASSI: This is a procedural question.
    6 What about the other people that Ameren has identified in
    7 these particular questions? Will we be going back for
    8 Mr. Kaleel, Mr. Romaine and Mr. Sprague to answer these
    9 same questions?
    10
    HEARING OFFICER TIPSORD: I believe
    11 Mr. Sprague answered this question when he testified as
    12 to what his expertise was, and I would assume that each
    13 of them will be asked the question when they're -- when
    14 they testify.
    15
    MS. BASSI: Okay. So there will be a panel
    16 eventually of these folks?
    17
    HEARING OFFICER TIPSORD: Well, I think that
    18 Mr. Sprague did answer what his expertise was when he
    19 testified.
    20
    MS. BASSI: Right.
    21
    HEARING OFFICER TIPSORD: I would assume
    22 that when Mr. Romaine comes up he will tell us what his
    23 expertise and background is at that point, but the Agency
    24 also said that they could provide in writing that
    Keefe Reporting Company
    115

    1 information because Mr. Ross could only answer as to
    2 Mr. Ross. If you would like them to provide in writing
    3 the expertise, the answer to question number 1 --
    4
    MS. BASSI: No, I'm not interested in seeing
    5 it in writing. I think that we lose the opportunity to
    6 cross-examine on it if it's in writing. I guess my
    7 question is, the way these -- and these aren't my
    8 questions, but the way these questions are presented, it
    9 assumes, I assume, that these four people would be able
    10 to answer these questions so that the right people are
    11 answering the right questions, and I agree that --
    12
    HEARING OFFICER TIPSORD: Are you asking --
    13 May I ask a procedural question?
    14
    MS. BASSI: Yes.
    15
    HEARING OFFICER TIPSORD: These are Ameren's
    16 questions for IEPA witnesses Kaleel, Romaine, Ross and
    17 Sprague, so are you saying that you want all four of them
    18 up here to answer all of Ameren's questions? Is that
    19 what you're looking for?
    20
    MS. BASSI: That's what I anticipated,
    21 but --
    22
    HEARING OFFICER TIPSORD: I thought they
    23 would direct them to who they needed to direct them to.
    24 Mr. Harrington, they're your questions.
    Keefe Reporting Company
    116

    1
    MS. BASSI: Yeah.
    2
    MR. HARRINGTON: I thought it was likely
    3 there would be a panel -- that's why I formed them this
    4 way -- but if the individual witnesses can give a
    5 brief -- the same brief answers that Mr. Ross did as to
    6 their own expertise, I think when they then go into --
    7 one, I can limit my questions to them to those things
    8 with which they're familiar until it informs the Board of
    9 what reliance should be placed on each type of witness.
    10 It can be done individually or as a panel. You know,
    11 it's up to the Agency to figure out how they want to
    12 present their witnesses.
    13
    HEARING OFFICER TIPSORD: Well, let me ask a
    14 further clarifying question, then. For example, number
    15 2, "Is it correct that the Illinois EPA," are you
    16 comfortable with only Mr. Ross answering that question or
    17 do you want --
    18
    MR. HARRINGTON: No, I think in this case
    19 Mr. Ross can answer that. If he answers it, I assume he
    20 answers for the Agency, and I don't think anyone else has
    21 to answer that particular question.
    22
    MR. KIM: And our expectation was if some of
    23 these questions should have been answered, for example,
    24 by -- if the best person situated was Jeff Sprague or
    Keefe Reporting Company
    117

    1 Chris Romaine or what have you, then we attempted to
    2 have -- well, the only person aside from Mr. Ross that's
    3 come up so far --
    4
    HEARING OFFICER TIPSORD: You know what?
    5 Let's put -- Let's break for lunch, bring them all back
    6 at once, and let's just do these questions all at once,
    7 okay, if we can. Let's bring them all back after lunch.
    8 They all work here at the Agency. I assume you can bring
    9 them all back after lunch.
    10
    MR. KIM: Yeah.
    11
    HEARING OFFICER TIPSORD: All right. Let's
    12 break for lunch.
    13
    (One-hour lunch recess taken)
    14
    HEARING OFFICER TIPSORD: I think we're
    15 ready to go back on the record, and at this time I notice
    16 that we've been joined by Jeffrey Sprague, who's been
    17 sworn in --
    18
    MR. SPRAGUE: I have.
    19
    HEARING OFFICER TIPSORD: -- and Chris
    20 Romaine. Good to see you again, Chris. And I assume you
    21 are Robert Kaleel?
    22
    MR. KALEEL: Yes.
    23
    HEARING OFFICER TIPSORD: Could we have
    24 Mr. Romaine and Mr. Kaleel sworn in, please?
    Keefe Reporting Company
    118

    1
    (Witnesses sworn.)
    2
    HEARING OFFICER TIPSORD: Thank you. Okay.
    3
    MR. KIM: And just for clarification,
    4 obviously, in accordance with your request, we have, you
    5 know, a sort of panel here. I still have Mr. Ross as the
    6 primary responder. To the extent that something -- one
    7 of the questions that's been posed by Ameren is not --
    8 cannot be answered by him or it's not going to be
    9 deferred, then we can try and have, you know, one of the
    10 other witnesses answer, but were you intending to poll
    11 each witness on each question or is one answer sufficient
    12 as long as we're speaking for the Agency?
    13
    HEARING OFFICER TIPSORD: If they're
    14 speaking for the Agency, I assume that it's all right
    15 with Ameren. We'll address that as we go along.
    16
    MR. KIM: Okay.
    17
    HEARING OFFICER TIPSORD: It would be my
    18 intent that if it's for the Agency, if Jim Ross is going
    19 to handle it, then he would handle it. If there's
    20 follow-up, we can direct it to whomever.
    21
    MR. HARRINGTON: The only caveat to that is,
    22 you know, if somebody's referenced as being the expert on
    23 which the testimony's based, then we want the person
    24 whoever -- and if more than one person is represented as
    Keefe Reporting Company
    119

    1 being an expert on some subject, then we'll want to be
    2 able to follow up with them.
    3
    HEARING OFFICER TIPSORD: Certainly, but be
    4 that as it may, we did have the request for background
    5 with question number 1, so if we could have -- I believe
    6 Mr. Sprague addressed that when he testified already.
    7
    MR. HARRINGTON: Yes.
    8
    HEARING OFFICER TIPSORD: So we need
    9 Mr. Kaleel and Mr. Romaine.
    10
    MR. KIM: Yeah, we'll do that first. Just
    11 read question number 1.
    12
    HEARING OFFICER TIPSORD: You know what?
    13 That microphone comes off. You may want to just -- And
    14 that one's highly directional, so they'll have to speak
    15 right into it. Okay.
    16
    MR. KALEEL: Okay. Question number 1 is,
    17 "For all witnesses, please describe your personal
    18 background in researching the areas of the fate of
    19 mercury on the environment and health and environmental
    20 impacts of mercury contamination." My job is -- with the
    21 Illinois EPA, the Bureau of Air, is as the manager of the
    22 Air Quality Planning Section. I have about 30 years of
    23 experience in air pollution control, most of that in the
    24 area of air quality modeling. We've not focused a great
    Keefe Reporting Company
    120

    1 deal of effort on modeling of atmospheric mercury
    2 throughout most of my career. We have had some
    3 involvement -- I personally have had some involvement
    4 through my association with the Lake Michigan Air
    5 Directors Consortium. Beginning in about 2001, I
    6 believe, the State of Wisconsin was interested in
    7 pursuing mercury modeling and they brought that to the
    8 attention of the project team of which I'm a member, and
    9 they reported on a frequent basis on the status of their
    10 model development efforts to support a rule in Wisconsin,
    11 so I guess my background largely stems from that
    12 association and some of the work that was initiated by
    13 the State of Wisconsin. Don't have a lot of additional
    14 experience in this area beyond efforts to support this
    15 rulemaking; some additional reading and literature
    16 research that I have performed in this position.
    17
    HEARING OFFICER TIPSORD: Thank you,
    18 Mr. Kaleel. Mr. Romaine, you don't need to read the
    19 question again. It's the same question. We'll just --
    20
    MR. ROMAINE: My primary activity in the
    21 Agency is involved in permitting of sources. My
    22 investigation into the fate of mercury on the environment
    23 and health and environmental impacts of mercury
    24 contamination has been incidental permitting of existing
    Keefe Reporting Company
    121

    1 sources and proposed projects as necessary to respond to
    2 concerns expressed by the public during those permitting
    3 activities, so it's been very directed at specific
    4 comments from the public and has not been a broad
    5 investigation of environmental -- health and
    6 environmental impacts of mercury contamination.
    7
    HEARING OFFICER TIPSORD: And then I believe
    8 we had gotten to question number 5. Are there any of
    9 those remaining questions that anyone would like
    10 Mr. Sprague, Mr. Kaleel or Mr. Romaine to additionally
    11 address?
    12
    MR. HARRINGTON: I think if we could quickly
    13 go through -- or maybe we can assume -- if I could run
    14 through them, maybe we could get them done quickly.
    15 Basically, is --
    16
    HEARING OFFICER TIPSORD: You need to use
    17 the microphone, Mr. Harrington. We're losing you.
    18
    MR. HARRINGTON: Sorry. Has any member of
    19 the panel actually conducted studies in mercury
    20 deposition?
    21
    MR. ROMAINE: I have not.
    22
    MR. KALEEL: I have not.
    23
    MR. SPRAGUE: And I have not.
    24
    MR. HARRINGTON: Mr. Kaleel, I understand
    Keefe Reporting Company
    122

    1 that your expertise is in modeling and air quality
    2 planning; is that correct?
    3
    MR. KALEEL: Yes, it is.
    4
    MR. HARRINGTON: Has your -- Have you or
    5 your team attempted to do any modeling with respect to
    6 mercury in Illinois?
    7
    MR. KALEEL: We have not tried to perform
    8 any modeling within my section. I was involved to a
    9 certain extent in some of the modeling efforts that
    10 Marcia Willhite described last week in terms of the
    11 Bureau of Water's effort to retain an expert for the
    12 purposes of modeling.
    13
    MR. ROMAINE: I think you stated that too
    14 broadly. Has any of your staff been involved in modeling
    15 of mercury associated with power plants?
    16
    MR. KALEEL: I might defer that to Jeff
    17 Sprague. There have been some efforts to model in the
    18 context of individual power plant emissions and new power
    19 plants. It's not the kind of deposition modeling that I
    20 was thinking of at the time that you asked the question.
    21
    MR. HARRINGTON: Was any of that modeling
    22 relevant to this rulemaking in your opinion?
    23
    MR. KALEEL: I guess I didn't consider it.
    24 Maybe that's why I answered the questions --
    Keefe Reporting Company
    123

    1
    MR. HARRINGTON: Thank you.
    2
    MR. KALEEL: -- as quickly as I did.
    3
    MR. HARRINGTON: Has any member of the panel
    4 conducted any independent research with respect to
    5 environmental and health impacts of mercury?
    6
    MR. KALEEL: I have not performed any
    7 independent research.
    8
    MR. ROMAINE: I have not performed any
    9 independent research.
    10
    MR. SPRAGUE: And I haven't conducted any
    11 independent research.
    12
    MR. ROSS: It's dependent on how you qualify
    13 independent research. I have reviewed documents, spoken
    14 with experts.
    15
    MR. HARRINGTON: I believe you did outline
    16 that in the past. Thank you. Why don't we move on as to
    17 the numbered questions and we'll see how it works.
    18
    HEARING OFFICER TIPSORD: Okay. Question
    19 number 6.
    20
    MR. ROSS: "For each witness, what portions
    21 of the Technical Support Document did you personally
    22 participate in preparing?" And I was involved in several
    23 of the TSD sections, especially Sections 7, 9 and 10.
    24
    HEARING OFFICER TIPSORD: Mr. Kaleel,
    Keefe Reporting Company
    124

    1 Technical Support Document?
    2
    MR. KALEEL: I was involved with the
    3 preparation of Section 5.1 of the Technical Support
    4 Document. I think that section's entitled "Mercury in
    5 the Atmosphere." I also had a role reviewing other
    6 portions of the document but not a primary role in
    7 preparing it.
    8
    HEARING OFFICER TIPSORD: Mr. Sprague?
    9
    MR. SPRAGUE: I'm sorry. Which question was
    10 this?
    11
    HEARING OFFICER TIPSORD: The Technical
    12 Support Document, what parts of it you helped prepare.
    13
    MR. SPRAGUE: Oh. I prepared Section 3.0.
    14
    HEARING OFFICER TIPSORD: And Mr. Romaine?
    15
    MR. ROMAINE: I assisted in the preparation
    16 of Sections 7, 8 and 10. For a lot of that my role was
    17 simply as a reviewer of those portions of the document.
    18
    HEARING OFFICER TIPSORD: Thank you. You
    19 know what? It might be easier -- Mr. Kim, is there a
    20 particular reason you have them sitting behind you? It's
    21 a little hard to both see them and --
    22
    MR. KIM: I was anticipating they wouldn't
    23 have to do a lot of talking, but we can have them slide
    24 up.
    Keefe Reporting Company
    125

    1
    HEARING OFFICER TIPSORD: It might be easier
    2 for all concerned.
    3
    MR. KIM: I guessed wrong, obviously.
    4
    MR. ROSS: Question 7, "With respect to
    5 Section 5 of the TSD, how did Illinois EPA come to the
    6 conclusion that the reduction in mercury emissions
    7 proposed by the rule will result in significant
    8 reductions of mercury deposition and methylmercury levels
    9 in waters and fish in Illinois?" And I believe that
    10 question was posed to and answered in detail by both
    11 Dr. Keeler and Marcia Willhite.
    12
    MR. HARRINGTON: Does that suggest that the
    13 members of the air panel that are here today did not
    14 participate significantly in that decision?
    15
    MR. ROSS: I'd say that's a good assessment,
    16 that's correct.
    17
    MR. HARRINGTON: Thank you.
    18
    HEARING OFFICER TIPSORD: Question number 8?
    19
    MR. ROSS: "Did Illinois EPA come to an
    20 independent conclusion as to what the reduction in the
    21 deposition of mercury will be if the rule as proposed is
    22 fully implemented?" The Agency simply concluded that
    23 significantly reducing mercury emissions will result in a
    24 corresponding reduction in mercury deposition, and I
    Keefe Reporting Company
    126

    1 believe again that Dr. Keeler and Marcia Willhite
    2 addressed this in detail.
    3
    HEARING OFFICER TIPSORD: Ms. Bassi?
    4
    MS. BASSI: I'm sorry. Perhaps you could
    5 refresh my memory on this a bit. So basically, you
    6 believe -- if I am phrasing this incorrectly, this is the
    7 question. Your supposition is that a 90 percent
    8 reduction in emissions of mercury from power plants will
    9 result in a 90 percent reduction in deposition in
    10 Illinois from those power plants; is that correct?
    11
    MR. ROSS: That's not correct. I believe
    12 Marcia Willhite made that statement, but it was made in
    13 the context of really what she referred to as "water
    14 world" in that she uses that assessment or will need to
    15 use that assessment in dealing with water issues such as
    16 the TMDL and she has to develop an implementation plan to
    17 reach certain levels, so I believe she made that
    18 statement and attempted to clarify it in that context.
    19
    MS. BASSI: Thank you.
    20
    HEARING OFFICER TIPSORD: Mr. Forcade?
    21
    MR. FORCADE: Would you be able to say if
    22 you have a 50 percent reduction, would you expect the
    23 reduction in methylmercury in the waters to be greater or
    24 less? I think you used the word related reduction, or
    Keefe Reporting Company
    127

    1 how would you describe the reduction?
    2
    MR. ROSS: A corresponding reduction.
    3
    MR. FORCADE: Corresponding.
    4
    MR. ROSS: So you -- obviously you seek to
    5 reduce the source of these emissions and you would expect
    6 to see a corresponding reduction in the methylmercury
    7 levels in fish, which the studies in Florida and
    8 Massachusetts have borne out and which Dr. Keeler's
    9 research has addressed, and we have not attempted to
    10 quantify that. We've gone over that in some level of
    11 detail. I also addressed that on my first day, and I
    12 think that Marcia and Dr. Keeler addressed that at
    13 length.
    14
    HEARING OFFICER TIPSORD: Mr. Harrington?
    15
    MR. HARRINGTON: For efficiency's sake, may
    16 we assume that if no other Agency witness on this panel
    17 adds or clarifies anything that they have nothing further
    18 to add personally?
    19
    HEARING OFFICER TIPSORD: Excellent point.
    20 Excellent point.
    21
    MR. HARRINGTON: We can just move forward,
    22 then. Why don't we proceed.
    23
    MR. ROSS: Question 9, "How did you come to
    24 that conclusion?" I believe we've addressed that also.
    Keefe Reporting Company
    128

    1
    Section 10, "Are you aware of EPA and EPRI
    2 modeling studies that show that mercury from coal-fired
    3 power plants within the state probably contribute
    4 relatively little on average of the total mercury
    5 deposited in the state?" And yes, I am aware of it, and
    6 that was one area where we specifically asked Dr. Keeler
    7 to look at and discuss, and he did address it in his
    8 testimony.
    9
    MR. HARRINGTON: Specifically the EPA and
    10 EPRI studies?
    11
    MR. ROSS: Yes, he did. That was discussed
    12 when Dr. Keeler was here. He did discuss that model.
    13
    MR. HARRINGTON: I believe he discussed the
    14 model but not the conclusions with respect to Illinois.
    15 Are you aware -- Unless my memory is failing me on this
    16 point.
    17
    MR. ROSS: I believe he did, but I'm not
    18 certain. I believe he said that the modeling showed that
    19 there were no identified hot spots, so to say, except
    20 potentially around the Chicago area, and I don't want to
    21 put words in his mouth, but I had noted in my notes that
    22 that was discussed.
    23
    MR. HARRINGTON: Thank you very much.
    24
    MR. ROSS: Question 11, "Are you aware of
    Keefe Reporting Company
    129

    1 any studies demonstrating that mercury in the atmosphere
    2 or deposited in the ground other than methylmercury in
    3 fish has a direct impact on human health?" And this
    4 question I believe needs clarified in that the mercury in
    5 question is limited to that originating from coal-fired
    6 power plants, and if that is the case, then, no, I am not
    7 aware of any studies demonstrating that mercury
    8 originating from coal-fired power plants other than that
    9 deposited in the ground or in the atmosphere has a direct
    10 impact on human health.
    11
    MR. HARRINGTON: I think the way you
    12 restated that at the end may have come out with a double
    13 negative, so let me just try to clarify this. You are
    14 not aware of any studies showing that mercury from power
    15 plants other than that which becomes methylmercury in
    16 fish has any impact on public health; is that correct?
    17
    MR. ROSS: That's correct, I am not aware of
    18 any studies.
    19
    MR. HARRINGTON: Thank you.
    20
    HEARING OFFICER TIPSORD: Question 12.
    21
    MR. ROSS: Question 12, "Do you agree that
    22 the only impact of mercury in the environment that has
    23 been identified in the studies and literature is through
    24 the consumption of fish and other marine life impacted by
    Keefe Reporting Company
    130

    1 methylmercury?" Again, assuming that the mercury in
    2 question is that originating from coal-fired power
    3 plants, then no, I am not aware of any studies.
    4
    MR. HARRINGTON: Could you please explain
    5 the qualification that you gave in the last two
    6 questions?
    7
    MR. ROSS: Well, mercury is a health issue
    8 and does have impacts in areas other than coal-fired
    9 power plants or methylmercury in fish. Mercury has been
    10 identified as a toxic pollutant that if you ingest it
    11 through the drinking of contaminated water, inhalation, I
    12 think it was also spoken about a dentist coming into
    13 contact with mercury vapors, that there's health issues,
    14 so there's other mercury health issues and impacts other
    15 than what we are addressing with this rulemaking and
    16 discussing in this hearing.
    17
    MR. HARRINGTON: Those are a result of -- in
    18 general of mercury in large concentrations rather than
    19 the atmospheric type of mercury from power plants; is
    20 that correct?
    21
    MR. ROSS: I believe that's correct, but I'm
    22 not an expert in that area.
    23
    MR. HARRINGTON: Thank you.
    24
    MR. ROSS: 13, "Do you agree that the
    Keefe Reporting Company
    131

    1 purpose of the Illinois rule is to attempt to reduce the
    2 methylmercury content in fish in Illinois?" And yes, I
    3 agree with that. Also, we need to satisfy CAMR and the
    4 USEPA, so that is another purpose of the Illinois rule.
    5
    14, "Has the Illinois EPA or anyone else to your
    6 knowledge conducted any studies to determine the direct
    7 impact of mercury emissions from Illinois coal-fired
    8 electrical generating units upon waters in the state of
    9 Illinois?" And I believe that this was discussed in
    10 detail by Marcia Willhite and Dr. Keeler.
    11
    MR. HARRINGTON: I believe the answer was
    12 no, you're not aware of any such studies directly in
    13 Illinois?
    14
    MR. ROSS: I believe the answer that was
    15 provided was that they began such studies, Marcia, but
    16 she -- they did not complete the studies. She said she
    17 pulled the plug, I believe was how she characterized it.
    18
    MR. HARRINGTON: Thank you.
    19
    MR. ROSS: 15, "If so, please describe the
    20 study and its conclusion." Not applicable. Well,
    21 actually, I just answered that.
    22
    16, "To your knowledge, has anyone done a
    23 measurement of the mercury deposition within the state of
    24 Illinois and attempted to trace it to any particular
    Keefe Reporting Company
    132

    1 source?" And to my knowledge, no, they have not. "If
    2 so, please describe the study and its conclusion." I
    3 answered in the negative, so it's not applicable.
    4
    18, "Has Illinois EPA conducted any independent
    5 review or study of the availability of mercury control
    6 technologies for EGUs other than that prepared by
    7 Dr. Staudt?" And yes, we have. "If so, please describe
    8 that study and its conclusion." I addressed this several
    9 times, but we reviewed existing studies on the subject,
    10 consulted with other parties, including other agencies
    11 and experts, contacted several vendors of mercury control
    12 devices. At least one of those vendors will be
    13 testifying here. We also spoke with Praveen Amar of
    14 NESCAUM. So we did do our own research and came to our
    15 own conclusions prior to retaining Dr. Staudt.
    16
    HEARING OFFICER TIPSORD: Go ahead,
    17 Mr. Zabel.
    18
    MR. ROSS: The conclusion --
    19
    MR. ZABEL: Just to follow up, Mr. Ross,
    20 when you refer to studies such as you just described,
    21 you're talking about desktop studies?
    22
    MR. ROSS: Define desktop studies.
    23
    MR. ZABEL: Through a literature search.
    24 Let me rephrase the question. Did the Agency do any
    Keefe Reporting Company
    133

    1 fieldwork?
    2
    MR. ROSS: Define fieldwork.
    3
    MR. ZABEL: Sure. Did you do any actual
    4 physical experimentation on the technology?
    5
    MR. ROSS: No, we did not.
    6
    MR. ZABEL: Did you fund any such?
    7
    MR. ROSS: No, we did not.
    8
    MR. HARRINGTON: And the literature that you
    9 referred to and relied on, is that all listed in the
    10 Technical Support Document?
    11
    MR. ROSS: I believe so, yes.
    12
    HEARING OFFICER TIPSORD: Mr. Zabel?
    13
    MR. ZABEL: Are the persons with whom you
    14 had discussions listed in the TSD in any fashion?
    15
    MR. ROSS: I don't believe we attempt to
    16 list the names of everyone that we discussed this issue
    17 with. However, several of them will be testifying. I'm
    18 sure Section 8 will --
    19
    MR. HARRINGTON: If I may.
    20
    HEARING OFFICER TIPSORD: Mr. Harrington?
    21
    MR. HARRINGTON: Have -- Other than those
    22 who are testifying, did any of the people with whom you
    23 discussed this matter provide you information independent
    24 of what's in the documents that you relied on to reach a
    Keefe Reporting Company
    134

    1 conclusion that these -- as to the technical feasibility
    2 of the rule?
    3
    MR. ROSS: I would say to some degree, yes,
    4 many of the people -- I mean, when you have conversations
    5 with experts, it helps to form your opinion, and it
    6 certainly impacted the conclusions we made.
    7
    MR. HARRINGTON: Could you tell us who these
    8 experts were that are not referenced in the documents and
    9 who are not testifying?
    10
    MR. ROSS: I can attempt to recall their
    11 names. There was Praveen Amar. There was Mike Durham,
    12 who was with ADA-ES. He is a pollution control vendor.
    13 Vince Hellwig of Michigan. He -- I believe he's the
    14 director of Michigan's air program, and that was
    15 critical, because the Michigan utility report was a
    16 document that we -- it is referenced in the Technical
    17 Support Document and we did rely on it to some degree. I
    18 would probably have to go back and review my notes, but
    19 those are the ones that pop out in my mind.
    20
    MR. HARRINGTON: Did any of those people
    21 provide you with information that resulted in any
    22 different conclusions than that that Dr. Staudt will
    23 testify to?
    24
    MR. ROSS: I mean, that's a subjective
    Keefe Reporting Company
    135

    1 question. To the best of my ability, their conclusions
    2 were not significantly different than the conclusions
    3 reached by Dr. Staudt in our Technical Support Document.
    4
    MR. HARRINGTON: Did any of those people you
    5 consulted with independently conclude that it was
    6 technically feasible to achieve a 90 percent reduction of
    7 mercury through the addition of activated carbon or
    8 halogenated activated carbon alone prior to the existing
    9 ESPs on Powder River Basin coal?
    10
    MR. ROSS: We discussed that issue with
    11 them. I believe some of them expressed that it could be
    12 done. There were concerns expressed. We sought to
    13 address those concerns by providing flexibility in the
    14 rule. That was one of the lessons taken away from
    15 speaking with the experts, that any rule that was crafted
    16 needed to have some flexibility built into it for
    17 compliance, and so that was one of our guiding factors in
    18 seeking to make the rule flexible.
    19
    MR. HARRINGTON: Did any of them indicate to
    20 you confidence that a 75 percent removal could be
    21 achieved on the type of power plants in Illinois burning
    22 sub-bituminous coal?
    23
    MR. ROSS: You know, the way you're framing
    24 the question is did we -- at the time we were consulting
    Keefe Reporting Company
    136

    1 with them, we didn't have a rule developed. We didn't
    2 have the rule parameters set out, so it's not like when
    3 we talked with them that -- did we say, 75 percent, as
    4 our rule requires, is that achievable. That particular
    5 question was not posed to them. Like, Mike Durham, he
    6 has done many presentations. Praveen Amar, he helped
    7 draft the STAPPA/ALAPCO model rule in which they suggest
    8 that a 90 to 95 percent mercury reduction level is
    9 achievable. So just based on that, I can't recall the
    10 specifics of all of our conversation, but you're probably
    11 going to -- you know, if you would ask them today, I
    12 would assume Praveen Amar would say 90 percent is
    13 achievable since he helped draft the STAPPA/ALAPCO rule
    14 and they in fact suggest that states require 90 to 95
    15 percent. They give a range. I know Mike Durham, who is
    16 the vendor, has said that any rule needs to have a soft
    17 landing provision in it, any aggressive rule like
    18 Illinois'. I think he would -- and I hate speaking for
    19 him and he won't be testifying here, but I've seen his
    20 presentations where he says a rule needs flexibility and
    21 a soft landing. And Sid Nelson, who will be speaking
    22 here, is a vendor comparable to Mike Durham, and he would
    23 be able to -- I mean, you can ask some of these questions
    24 directly to a vendor of halogenated ACI systems.
    Keefe Reporting Company
    137

    1
    MR. HARRINGTON: I appreciate that, and
    2 that's why I was limiting it to those who wouldn't be
    3 testifying here as to --
    4
    MR. ROSS: Right. I understand.
    5
    MR. HARRINGTON: -- what information the
    6 Agency may have relied on.
    7
    HEARING OFFICER TIPSORD: Mr. Zabel?
    8
    MR. ZABEL: Just so the record's clear,
    9 Mr. Ross, when you say achievable, we're talking strictly
    10 about a 90 percent standard with ACI or halogenated ACI;
    11 not with scrubbers, not with SCRs, not with baghouses,
    12 just the carbon injection, halogenated or otherwise.
    13
    MR. ROSS: No, I was not limiting my
    14 comments to that. There are many options to comply with
    15 the rule. That is simply one option, is the installation
    16 of halogenated ACI, and technically, you don't need to
    17 reach 90 percent on each and every unit. The rule has
    18 some flexibility provisions built into it; namely, the
    19 averaging provisions where one unit can overcontrol,
    20 which allows another unit to undercontrol such that the
    21 average is 90 percent. So each and every unit does not
    22 need to achieve 90 percent. And also, with the recent
    23 amendment to the rule, there is the Temporary Technology
    24 Based Standard which also allows me to say that each and
    Keefe Reporting Company
    138

    1 every unit does not have to reach 90 percent. And it's
    2 not only 90 percent. The rule has flexibility where you
    3 can choose to comply with either 90 percent or an
    4 output-based limit, and that limit is 0.008 pounds of
    5 mercury per gigawatt hour, so -- and you can average to
    6 achieve that standard too, so in essence, there's two
    7 standards to the rule. There's not -- I mean, we're
    8 quantifying everything or we're saying that it's 90
    9 percent, but it's not only 90 percent. I want to make
    10 that clear, that the rule is flexible on this, either 90
    11 percent or an output-based standard.
    12
    MR. ZABEL: Well, maybe my question was a
    13 little misunderstood, Mr. Ross. When you say that a
    14 standard is achievable, what I'm really concerned about,
    15 are we talking about within the economic parameters that
    16 the Agency studied, which didn't include scrubbers, which
    17 didn't include SCRs, which didn't include, with a couple
    18 of exceptions, baghouses, or do you mean achievable under
    19 any combination of hardware and operational controls?
    20
    MR. ROSS: I think our study did include
    21 some of those. I mean, some units we -- and we'll get
    22 into this when we get into Section 8 and Dr. Staudt has
    23 gone unit by unit, but some of those units we believe
    24 have to do little or nothing in this state. Many --
    Keefe Reporting Company
    139

    1 You're absolutely right, the broad number of units we
    2 believe can comply with halogenated ACI to achieve
    3 compliance with the rule. Now, compliance with the rule
    4 doesn't -- what I'm trying to emphasize here, compliance
    5 with the rule doesn't necessitate a 90 percent reduction.
    6 There's flexibility in the rule where compliance with the
    7 rule could be, as I mentioned, overcontrol of one unit,
    8 undercontrol of another such that the average is 90
    9 percent or the average is 0.008 pounds per gigawatt hour.
    10 So there's -- there is some flexibility, I want to
    11 emphasize, in the rule, but again, when we go down each
    12 and every unit, which I think we're going to with Section
    13 8, you'll see that we're not talking about halogenated
    14 ACI for each and every unit.
    15
    MR. ZABEL: So when you use the term
    16 achievable, there is some method by which every unit
    17 could achieve the standard, whichever measurement is
    18 used.
    19
    MR. ROSS: That's correct.
    20
    MR. ZABEL: Okay. And when you talk about
    21 flexibility, which you've mentioned several times, let me
    22 give you an example to see if I understand what you mean
    23 by the flexibility of averaging in the rule. A
    24 two-unit -- this could be a plant or a system. I think
    Keefe Reporting Company
    140

    1 Phase I is system-wide, Phase II is plant-wide; is that
    2 correct?
    3
    MR. ROSS: That's correct.
    4
    MR. ZABEL: You have two units. One makes
    5 the 75 percent. What's the -- And they're identical
    6 units. Assume everything is absolutely identical. To
    7 make the 90 percent average, what's the percentage
    8 removal the other one's got to meet?
    9
    MR. ROSS: That's a number crunching
    10 exercise. I mean, we could --
    11
    MR. ZABEL: It's 105 percent, isn't it,
    12 Mr. Ross?
    13
    HEARING OFFICER TIPSORD: Mr. Zabel, let's
    14 let him finish.
    15
    MR. ZABEL: I'm sorry.
    16
    MR. ROSS: Well, we've looked at that and
    17 done the number crunching.
    18
    MR. ZABEL: Well, I've given you all the
    19 assumptions I think you need. The units are absolutely
    20 identical in size, emissions, fuel, any parameter you
    21 want to assume, except one meets 75 percent. For them to
    22 average 90, what's the other one got to meet?
    23
    MR. ROSS: I need a calculator. That's what
    24 I need.
    Keefe Reporting Company
    141

    1
    MR. KIM: If this is just a math question, I
    2 mean, what is it? 105?
    3
    MR. ZABEL: It's 105 percent, is it not?
    4 Mr. Romaine may answer if he wishes.
    5
    MR. ROMAINE: Well, I assume your -- the
    6 question is flawed, because if the two units are
    7 identical, they should be keeping identical mercury
    8 control.
    9
    MR. ZABEL: They should be if they installed
    10 the same hardware. That wasn't the assumption.
    11
    MR. ROMAINE: So they should only vary
    12 slightly. It's more likely the scenario you're
    13 describing would be one where one gets 88 percent and the
    14 other gets 92 percent.
    15
    MR. ZABEL: Then they have no flexibility.
    16 They have to do the same thing, don't they?
    17
    MR. ROMAINE: Right.
    18
    MR. ZABEL: Thank you.
    19
    MR. HARRINGTON: My understanding is we will
    20 come back to technology feasibility overall when we get
    21 to Chapter 8, so I'm not going to pursue it further. I
    22 was just directing my questions to any witnesses who
    23 wouldn't be present and what their opinions might have
    24 been, but I'm not trying to cut anybody else off.
    Keefe Reporting Company
    142

    1
    HEARING OFFICER TIPSORD: Thank you.
    2 Mr. Bonebrake?
    3
    MR. BONEBRAKE: I did have a couple of
    4 follow-ups. I think, Mr. Ross, in your testimony you
    5 indicated that one or more of the individuals that you
    6 spoke with had a concern or concerns expressed to you
    7 concerning achieving 90 percent. What was the concern or
    8 what were the concerns that were expressed to you?
    9
    MR. ROSS: That was a while ago, mind you,
    10 and to the best of my recollection, I think it was
    11 generally accepted that 90 percent reduction was
    12 aggressive; that some of the testing -- and Dr. Staudt
    13 will address this in detail. He's much more familiar
    14 with the over 30 some odd tests that have been done on
    15 mercury controls, but some of the testing has raised
    16 issues on particular situations where 90 percent would be
    17 more difficult than others, and we've acknowledged that
    18 there is some degree of uncertainty with many of these,
    19 some of these controls, so general new technology
    20 uncertainty type of concerns.
    21
    MR. BONEBRAKE: And your view would be our
    22 questions pertaining to these scenarios that would pose
    23 more difficulties or uncertainties, would -- those
    24 questions would best be directed to Dr. Staudt?
    Keefe Reporting Company
    143

    1
    MR. ROSS: Yes.
    2
    MR. BONEBRAKE: One related question. I
    3 think you also used the term soft landing --
    4
    MR. ROSS: Right.
    5
    MR. BONEBRAKE: -- in one of your answers.
    6 What does that mean, Mr. Ross?
    7
    MR. ROSS: My understanding is the way the
    8 term was used is that in the event that some of these
    9 units are not able to achieve an aggressive mercury
    10 reduction standard that there is some way that they could
    11 achieve compliance, such as building in the flexibility,
    12 so a soft landing would be flexibility in the rule or I
    13 think our -- the Temporary Technology Based Standard is
    14 exactly almost what was meant, in my opinion -- and this
    15 is just my opinion -- of what was meant by a soft
    16 landing, that a company does its best to reach or achieve
    17 compliance with the standard, but if it's still unable
    18 to, then there's a way that allows them additional time
    19 to take measures to try and get -- come into compliance,
    20 and that's what our Temporary Technology Based Standard
    21 does, so --
    22
    MR. BONEBRAKE: I'm sure we'll have more
    23 questions in that regard later, but thank you for now.
    24
    HEARING OFFICER TIPSORD: Ms. Bugel? Please
    Keefe Reporting Company
    144

    1 identify yourself.
    2
    MS. BUGEL: Faith Bugel, Environmental Law &
    3 Policy Center, for the record. I have one follow-up
    4 question for each witness. Mr. Romaine, I just wanted to
    5 go back to the questions about Mr. Zabel's example of 105
    6 percent versus 70 percent. If you have three units all
    7 that are equal in size and one of them is making 75
    8 percent, what do the other two have to make to hit the 90
    9 percent average?
    10
    MR. ROMAINE: Again, you're coming up with a
    11 theoretical example. You're making assumptions that each
    12 of the units operates for identical amount of throughput
    13 using similar coal supply. I think the question is
    14 flawed, because if they're identical, I would expect less
    15 variability in performance of the units, but using this
    16 arbitrary mathematical example, the arithmetic would say
    17 that the average of 75 plus 97 and a half plus 97 and a
    18 half is 90.
    19
    MS. BUGEL: Okay. Thank you. And then a
    20 question for Mr. Ross. The -- I just wanted to talk
    21 about the flexibility, ask you a question about the
    22 flexibility in the rule. First, there are at least three
    23 areas the rule provides flexibility or more?
    24
    MR. ROSS: I believe there's more.
    Keefe Reporting Company
    145

    1
    MS. BUGEL: Okay. What would those be?
    2
    MR. ROSS: First the rule requires --
    3 There's two standards, like I had explained. It's not
    4 just 90 percent. You have the choice of how you comply.
    5 It's 90 percent or an equivalent output-based standard,
    6 so you can comply with the 90 percent or you can comply
    7 with the 0.008 pounds of mercury per gigawatt hour.
    8 Second, the rule does not mandate how you comply; that
    9 is, it does not tell power plants, you need to put on
    10 this particular type of control device or here's the
    11 steps you need to take for compliance. It simply sets
    12 forth the standards and allows the companies to choose
    13 how they comply. The rule is in two phases, Phase I and
    14 Phase II, with Phase I being less stringent than Phase
    15 II, giving companies more time to optimize, take
    16 additional measures to achieve greater levels of
    17 compliance that are required in the second phase.
    18
    The company -- I mean the rule allows averaging
    19 provisions, which we've gone into to some level of
    20 detail, so each and every unit does not need to comply
    21 with the standard. There's averaging provisions. The
    22 rule has a Temporary Technology Based Standard, which is
    23 flexibility, in that units that can't comply with the
    24 standard are given additional time to comply, find ways
    Keefe Reporting Company
    146

    1 to comply, and the rule allows for units that will shut
    2 down in the future -- that is, there have been a few
    3 units identified in Illinois that will be shutting down
    4 in the near future -- those units can avoid installing
    5 controls to comply with the rule provided that they
    6 commit to shutting down by a certain date, so they can
    7 continue to operate without controls past the compliance
    8 date of the rule for a certain period of time provided
    9 that they commit to shut down.
    10
    MS. BUGEL: And I just had one follow-up
    11 question on your second point, which is that the rule
    12 does not mandate a technology. There's been a lot of
    13 discussion of halogenated ACI, but then is it correct
    14 that the rule does not require any company to use
    15 halogenated ACI to meet the rule?
    16
    MR. ROSS: That's correct.
    17
    MS. BUGEL: I have no further questions.
    18 Thank you.
    19
    MR. HARRINGTON: One follow-up, if I may.
    20 You mentioned soft landing earlier, and Mr. Bonebrake
    21 asked you about it. Was there also a suggestion of the
    22 other third parties who you talked to that emission
    23 trading be considered?
    24
    MR. ROSS: I don't believe I heard that from
    Keefe Reporting Company
    147

    1 the other third parties we consulted. We certainly heard
    2 it from the utilities and the stakeholders. Well, I may
    3 take that -- I think USEPA, we did consult with them
    4 prior to this rule, and I believe their position was that
    5 we should do a trading program.
    6
    MR. HARRINGTON: Thank you. Go ahead.
    7
    HEARING OFFICER TIPSORD: Question number
    8 20, I believe.
    9
    MR. ROSS: 20, "Is it fair to say that
    10 Illinois EPA is relying upon Dr. Staudt's expertise as
    11 set forth in his testimony and Chapter 8 of the Technical
    12 Support Document to determine the availability and costs
    13 of mercury control technology?" I believe we established
    14 this to a great deal that, yes, we are relying on
    15 Dr. Staudt. However, he was not the sole source of
    16 information, and we have addressed that in the previous
    17 questions.
    18
    21, "Has Illinois EPA carried out any comparison
    19 between the Illinois EGUs and those which were studied in
    20 the various studies referred to by Dr. Staudt in his
    21 testimony and Chapter 8 of the Technical Support
    22 Document?" To some degree. We have compiled detailed
    23 data on the 21 coal-fired power plants in Illinois
    24 subject to the rule, and we have shared this information
    Keefe Reporting Company
    148

    1 with Dr. Staudt and he has done a more extensive
    2 comparison than we have done on a unit-by-unit basis
    3 since we basically retained him to do -- to perform that
    4 analysis, so --
    5
    22, "If so, please describe that study and its
    6 conclusions." I basically did that, but the conclusions
    7 reached are described in detail in the TSD, and in
    8 summary, we concluded that all of Illinois' coal-fired
    9 EGUs should be able to comply with the requirements of
    10 the rule.
    11
    23, "What information did Illinois EPA provide to
    12 Dr. Staudt after he filed his original testimony?" We
    13 have been providing Dr. Staudt with updated information
    14 as we receive it. Since he filed his original testimony,
    15 I believe we supplied him with the knowledge that we were
    16 amending the rule to include TTBS and we provided him
    17 with the information that some of -- more than we
    18 originally believed, that Illinois EGUs were injecting
    19 SO3 at plants, and we provided him with information
    20 obtained from on-site inspections of the existing control
    21 configurations at Illinois' 21 coal-fired power plants
    22 that are subject to the rule.
    23
    MR. HARRINGTON: Did you provide any of this
    24 information in the form of documents?
    Keefe Reporting Company
    149

    1
    MR. ROSS: Yes, we did.
    2
    MR. HARRINGTON: We'd like to request that
    3 those documents be made part of the record.
    4
    MR. ROSS: I believe we can do that. We can
    5 supply those documents.
    6
    MR. HARRINGTON: And we may have questions
    7 about them after we get an opportunity to review them,
    8 but I'll hold those for now.
    9
    HEARING OFFICER TIPSORD: Well, it might be
    10 helpful if we could get those before Dr. Staudt's
    11 testimony.
    12
    MR. ROSS: Okay. I believe at least one
    13 party has requested that information and we supplied it
    14 to them. Kathleen submitted a request and we provided
    15 that information to her, but, yeah, certainly we have
    16 that compiled. That's the results of the inspections,
    17 and we have that information compiled and we can readily
    18 provide it.
    19
    MR. HARRINGTON: Was there additional
    20 documentation provided to him rather -- other than those
    21 drawings from your inspections?
    22
    MR. ROSS: Other than drafts of the TTBS,
    23 the Temporary Technology Based Standard, I do not believe
    24 so, and I believe that at least the concept paper in
    Keefe Reporting Company
    150

    1 those drafts were also shared with the utilities.
    2
    MR. HARRINGTON: After he -- Dr. Staudt
    3 provided -- may I have a moment, please?
    4
    HEARING OFFICER TIPSORD: Uh-huh.
    5
    (Off the record.)
    6
    MR. HARRINGTON: Why don't we go on. Thank
    7 you.
    8
    HEARING OFFICER TIPSORD: Okay. I think
    9 we're ready for question number 24, then.
    10
    MR. ROSS: "Did Dr. Staudt ask the Illinois
    11 EPA for additional information after he filed his
    12 original testimony? What did he ask for? Was it
    13 provided?" And Dr. Staudt has an outstanding request
    14 that we provide him with detailed information on the
    15 Illinois EGUs and updated information as we receive it,
    16 and we have encountered throughout this process of
    17 studying and reviewing this data that there are several
    18 conflicting sources of data regarding Illinois EGUs in
    19 the areas of coal-fired power plants regarding their
    20 control configurations. Examples of different sources of
    21 information include the 1999 Information Collection
    22 Request, ICF's database, Illinois EPA's permit
    23 applications, field inspections, and as new information
    24 is obtained, we have shared this information with
    Keefe Reporting Company
    151

    1 Dr. Staudt, and as I mentioned in the previous answer, we
    2 did inform Dr. Staudt that we believe many more EGUs are
    3 injecting SO3 than we originally had believed after he
    4 filed his testimony, which I think the question refers
    5 to, and so he did ask for additional information and we
    6 did provide it.
    7
    25, "What discussions did the Illinois EPA have
    8 with Dr. Staudt after he filed his testimony regarding
    9 revisions to his prefiled testimony?" We've talked about
    10 that and we had some discussion in previous answers, but
    11 we did discuss the potential need to revise his testimony
    12 as a result of the addition of the TTBS and our
    13 discussions with him involving SO3 injection, and I
    14 believe another issue that was maybe overlooked was we
    15 also talked about some of the smaller units at Meredosia
    16 firing Illinois coal and having cold-side ESPs and that
    17 there was issues with them being able to achieve --
    18 readily being able to achieve the standard with
    19 halogenated ACI.
    20
    26, "As a result of Dr. Staudt's revised prefiled
    21 testimony, is the Illinois EPA modifying its TSD in any
    22 way?" No, we have no plans to modify the TSD.
    23
    27, "As a result of Dr. Staudt's testimony, has
    24 the Illinois" --
    Keefe Reporting Company
    152

    1
    MR. HARRINGTON: Excuse me.
    2
    HEARING OFFICER TIPSORD: Excuse me.
    3 Mr. Harrington?
    4
    MR. HARRINGTON: Given the revisions of the
    5 prefiled testimony and the revised rule and the second
    6 revision of the prefiled testimony, does that affect the
    7 conclusions of the TSD, particularly the technical
    8 conclusions, in any way?
    9
    MR. ROSS: I believe it would have some
    10 impact on our conclusions. I'm not sure to the degree of
    11 impact it has on the Technical Support Document
    12 conclusions. I don't believe we've identified a conflict
    13 in there anywhere except in Section 10 in particular
    14 where we say the TTBS is not in the rule. Obviously the
    15 TTBS now is in the rule, so that's in conflict. The
    16 question, I believe, is are we going to modify the
    17 Technical Support Document, and in consultations with the
    18 legal staff, it was not identified as a requirement that
    19 we modify the Technical Support Document.
    20
    MR. HARRINGTON: My follow-up question was
    21 are there changes in the conclusions that are contained
    22 in the Technical Support Document that we should identify
    23 for the Board so when they're looking at it they'll know
    24 where the Agency's conclusions or changes may be?
    Keefe Reporting Company
    153

    1
    MR. ROSS: I would say to the extent there
    2 are changes in -- I mean, you'd have to be -- I'm not
    3 sure what conclusions you're referring to. The
    4 conclusions on cost I believe would be less affected, but
    5 Dr. Staudt could probably answer that better than I,
    6 but --
    7
    MR. HARRINGTON: Would there be a change in
    8 conclusion as to the ability of the technologies set
    9 forth in Chapter 8 of the Technical Support Document to
    10 achieve either the 90 percent removal or the 0.008
    11 standard?
    12
    MR. ROSS: I don't believe so, no, but I
    13 would have to go back, honestly, and review that. I have
    14 not done that.
    15
    MR. HARRINGTON: Thank you. I'm ready to
    16 move on.
    17
    HEARING OFFICER TIPSORD: Question 27.
    18
    MR. ROSS: "As a result of Dr. Staudt's
    19 testimony, has the Illinois EPA considered revising its
    20 proposed rule in any way?" And obviously we've amended
    21 the rule to include the TTBS. No further amendments are
    22 anticipated or believed needed.
    23
    HEARING OFFICER TIPSORD: Mr. Zabel?
    24
    MR. ZABEL: Was the addition of the -- or
    Keefe Reporting Company
    154

    1 the amendment to add the TTBS discussed with Dr. Staudt
    2 before it was proposed?
    3
    MR. ROSS: Yes.
    4
    MR. ZABEL: Is there any documentation of
    5 those discussions?
    6
    MR. ROSS: I don't believe as far as notes
    7 on what we discussed. We had numerous conference calls
    8 with Dr. Staudt, individual calls back and forth. He was
    9 here in person many times. Those discussions on the TTBS
    10 have been ongoing almost since the day we retained him,
    11 so they've been going on for months regarding the TTBS.
    12 As far as after he filed his testimony, it's the same
    13 situation. We've had numerous conference calls. He's
    14 been here in person I believe once or twice. Many, many
    15 conversations with Dr. Staudt along this. We've traded
    16 e-mails, probably, you know, 30, 40 on this issue.
    17
    MR. ZABEL: Was the filing initiated -- and
    18 I realize in that extensive an exchange you may not be
    19 able to answer this, Mr. Ross, but was the filing of the
    20 proposal to amend the rule to add the TTBS done at his
    21 instigation?
    22
    MR. ROSS: He was certainly in support of
    23 it. I think it's something that the Agency has believed
    24 was necessary to some extent since day one, and I believe
    Keefe Reporting Company
    155

    1 we explained in our amendment that that had been
    2 originally proposed at the initial stakeholder meeting
    3 and had been discussed in several of the stakeholder --
    4 subsequent stakeholder meetings, but industry did not
    5 indicate to a large degree that they -- anyone would
    6 utilize that and there wasn't a lot of feedback on it, so
    7 it was not contained in the rule. However, after the
    8 rule was filed, it came to our attention that industry in
    9 fact would utilize that and was very much in favor of
    10 having that in there, and so that kicked off another
    11 round of the Agency reviewing it in detail, in which
    12 Dr. Staudt was involved in the entire process of coming
    13 up with the TTBS that is now in the rule.
    14
    MR. ZABEL: How did it come to the Agency's
    15 attention that industry would utilize it?
    16
    MR. ROSS: Well, I -- we were called over to
    17 the capitol building to meet with representatives of
    18 industry in which the TTBS was the primary topic, and
    19 that was shortly after the rule was filed. When I say
    20 we, Laurel Kroack and myself and Director Scott were
    21 called over to the capitol building to meet with industry
    22 representatives.
    23
    MR. ZABEL: That was the primary topic, you
    24 say. Was there --
    Keefe Reporting Company
    156

    1
    MR. ROSS: That's correct.
    2
    MR. ZABEL: -- an indication in that meeting
    3 that industry would utilize the -- something along the
    4 lines of the TTBE or the TTBS?
    5
    MR. ROSS: Well, I wasn't privy to
    6 discussions that happened at a higher level, but it was
    7 conveyed to me that industry wanted and would utilize the
    8 TTBS if it was in the rule and that there was some
    9 concern that the rule that we filed did not contain the
    10 TTBS.
    11
    MR. ZABEL: Who conveyed that information to
    12 you?
    13
    MR. ROSS: Laurel Kroack, our bureau chief,
    14 and I believe she received it through discussions with
    15 our director, who I'm not sure who he spoke with, but I
    16 believe -- and I'm not certain on this -- but probably
    17 Steve Frankel, who is the Governor's environmental policy
    18 advisor.
    19
    MR. ZABEL: Do you know or have you been
    20 told whom any of those people above you talked to in
    21 industry?
    22
    MR. ROSS: No, but industry was well
    23 represented at the meeting I attended, and, no, I do not
    24 know who they spoke with.
    Keefe Reporting Company
    157

    1
    MR. ZABEL: So when this came down to you
    2 from on high, if I may use that phrase --
    3
    MR. ROSS: That's fine.
    4
    MR. ZABEL: -- you don't know what
    5 discussions those folks on high, if any, had with
    6 industry.
    7
    MR. ROSS: No, I do not. As I mentioned, it
    8 was conveyed to me that the TTBS, we needed to take
    9 another hard look at that and try and get something into
    10 the rule.
    11
    MR. ZABEL: So it may not have been
    12 instigated by industry at that point at all as far as you
    13 know.
    14
    MR. ROSS: I can only say what was conveyed
    15 to me, and the indication I had, the impression I walked
    16 away with was that industry had expressed concern that
    17 the rule was -- the rule that we filed did not contain
    18 the TTBS.
    19
    MR. ZABEL: Thank you.
    20
    HEARING OFFICER TIPSORD: Ms. Bassi?
    21
    MS. BASSI: Mr. Ross, when you say industry,
    22 to whom are you referring?
    23
    MR. ROSS: Well, there were representatives
    24 from Midwest Generation, Dynegy, Ameren, Kincaid,
    Keefe Reporting Company
    158

    1 Dominion, I believe City Water, Light & Power was
    2 represented, Indeck-Elwood, so the utilities and their
    3 representatives.
    4
    MS. BASSI: Were all of these utilities, or
    5 as you call them, represented existing sources?
    6
    MR. ROSS: No, they were not.
    7
    MS. BASSI: Is it possible that this
    8 conveyance of information came from potential new sources
    9 of electrical generation?
    10
    MR. ROSS: Yes, that's possible.
    11
    MS. BASSI: Is it possible that some of
    12 those new sources were not -- would not be coal-fired?
    13
    MR. ROSS: Would not be coal-fired?
    14
    MS. BASSI: Never mind. That was a dumb
    15 question. You can put that on the record.
    16
    MR. BONEBRAKE: She just did.
    17
    MS. BASSI: Yes. I had another question.
    18 Oh, I know. If the Agency believed from day one that a
    19 TTBS type relief mechanism should be included in the
    20 rule, why did the Agency not include it in the rule in
    21 the first place regardless of how industry reacted to
    22 your presentation of it?
    23
    MR. ROSS: Well, the TTBS was contemplated
    24 since day one and it was discussed since day one. As we
    Keefe Reporting Company
    159

    1 proceeded through the process, as I mentioned, in the
    2 stakeholder meetings we raised the topic and discussed it
    3 and it just didn't appear that there was much interest in
    4 the TTBS or that no one had specifically identified that
    5 they would utilize it to any large degree, so there were
    6 policy discussions and the decision was made to not
    7 include it.
    8
    MS. BASSI: I thought I remembered -- I
    9 think I remember -- that you said a few minutes ago that
    10 at least some people at the Agency believed it should be
    11 in there since day one regardless of any other, you know,
    12 regulated entity inputs or lack of expression or
    13 whatever, and my question is, if the Agency's belief was
    14 that it should be included regardless of what industry
    15 did or reacted to it, I mean, industry reacted negatively
    16 to the proposal and that didn't deter it. Why would that
    17 not have been included?
    18
    MR. ROSS: Well, there were policy
    19 discussions and decisions, and the result of those
    20 discussions and decision was that the TTBS did not make
    21 it into the initial filing of the rule.
    22
    MS. BASSI: Was it an attempt at pressure?
    23
    MR. ROSS: No.
    24
    MS. BASSI: No?
    Keefe Reporting Company
    160

    1
    MR. ROSS: Not -- Well, that was not
    2 conveyed to me, that it was an attempt at pressure.
    3
    MS. BASSI: What was conveyed to you as to
    4 why it would be left out? Just policy?
    5
    MR. ROSS: Policy, correct.
    6
    MS. BASSI: Okay.
    7
    HEARING OFFICER TIPSORD: Are we ready,
    8 then, Mr. Harrington?
    9
    MR. HARRINGTON: If I may just --
    10
    HEARING OFFICER TIPSORD: Absolutely.
    11
    MR. HARRINGTON: I assume there will be
    12 another opportunity to come back and talk about the
    13 details of the technology, to be presenting testimony in
    14 support of the amendment, explaining what it means, and
    15 then we can then get into more details on it at that
    16 time.
    17
    MR. ROSS: Yeah, we will be ready to discuss
    18 it in detail at a later period.
    19
    MR. HARRINGTON: Then I'll withhold my
    20 question. One question just so the record's clear. The
    21 amendment you filed with the Board and was accepted last
    22 Thursday is -- has more restrictions in it than the one
    23 that was discussed in the public hearing; is that not
    24 correct?
    Keefe Reporting Company
    161

    1
    MR. ROSS: Well, I believe we discussed
    2 concepts in the public hearing. We never actually
    3 proposed a TTBS. We had just provided and discussed
    4 bullet points of potential TTBS, the framework of it.
    5
    MR. HARRINGTON: We're prepared to come back
    6 to that another time.
    7
    HEARING OFFICER TIPSORD: Ms. Bassi?
    8
    MS. BASSI: Mr. Ross, at various times --
    9 and I -- at various times did the Agency not provide
    10 draft regulatory language?
    11
    MR. ROSS: On the TTBS?
    12
    MS. BASSI: Yes. Was that not included in
    13 one of the draft rules?
    14
    MR. ROSS: Not to my knowledge.
    15
    MS. BASSI: Again, my memory could be
    16 failing here.
    17
    MR. ROSS: No, I don't believe it was. I
    18 believe we had a placeholder in the draft rules where
    19 that was.
    20
    MS. BASSI: Okay.
    21
    MR. ROSS: Are we on 27?
    22
    HEARING OFFICER TIPSORD: No, I believe we
    23 are actually on 28.
    24
    MR. ROSS: 28, "Has Illinois EPA carried out
    Keefe Reporting Company
    162

    1 a review of the physical circumstances of each of the
    2 EGUs in Illinois to determine the feasibility of
    3 installing halogenated powdered activated carbon prior to
    4 the electrostatic precipitators on Illinois EGUs burning
    5 sub-bituminous coal?" And yes, we have.
    6
    HEARING OFFICER TIPSORD: Mr. Harrington?
    7
    MR. HARRINGTON: May I ask when that was
    8 conducted?
    9
    MR. ROSS: It was conducted to some degree
    10 in -- prior to this rulemaking. Well, when I say prior,
    11 definitely prior to the filing of the rule, but it's an
    12 ongoing process is why it's difficult to say exactly when
    13 it was conducted. It's been something that we've been
    14 building on as we go. There has been an initial document
    15 that was provided last year that had all the control
    16 configurations of Illinois EGUs listed out off the 59
    17 units, and as we've gone through the process, as I
    18 mentioned in the previous answer, we uncovered some
    19 errors in the control configurations on some of these
    20 units. We've continuously updated that original document
    21 to where it's grown in size and complexity and level of
    22 detail to now I think we have a comprehensive document
    23 that goes into some level of detail of each and every EGU
    24 that we are fairly confident in at this time.
    Keefe Reporting Company
    163

    1
    MR. HARRINGTON: Is that document part of
    2 the record?
    3
    MR. ROSS: I don't believe so.
    4
    MR. HARRINGTON: Was that document prepared
    5 for the purpose of determining and evaluating the
    6 feasibility of the controls being proposed in this
    7 rulemaking?
    8
    MR. ROSS: It was used for that purpose.
    9 Was it constructed solely for that reason? I would say
    10 no, but it was definitely relied upon for those
    11 determinations, so if the next question is can we provide
    12 that document as part of the record, yes, we can.
    13
    HEARING OFFICER TIPSORD: If it's not his,
    14 it's certainly mine.
    15
    MR. ROSS: Hopefully someone's making a note
    16 of this. Okay. So, yeah, we can provide that.
    17
    MR. HARRINGTON: And may I follow up? And I
    18 assume that document as it has been revised was provided
    19 to Dr. Staudt?
    20
    MR. ROSS: Yes, it has.
    21
    MR. HARRINGTON: Has that document ever
    22 been -- previously been provided to the various EGUs for
    23 their review and comment?
    24
    MR. ROSS: Certainly not in its present
    Keefe Reporting Company
    164

    1 form. In prior forms, I do not know. Not to my
    2 knowledge.
    3
    29, "If so, please describe the study and its
    4 conclusions." We have compiled detailed information on
    5 each of the EGUs using ICR data, permit applications and
    6 field inspection reports, and we will be providing that
    7 as part of the record.
    8
    MR. HARRINGTON: Thank you.
    9
    MR. ROSS: 30?
    10
    HEARING OFFICER TIPSORD: Uh-huh.
    11
    MR. ROSS: "Has Illinois carried out any
    12 independent studies to determine the impacts of sulfur
    13 trioxide injection for gas conditioning upon the
    14 effectiveness of halogenated powdered activated carbon
    15 injection prior to the ESPs?" And the answer to that is
    16 yes, we have to some degree. I believe Dr. Staudt has
    17 done this while under contract with the State.
    18
    MR. HARRINGTON: Excuse me. When you say
    19 has done this, has the State actually carried out any
    20 work in the field where it's examining the data or
    21 contracted for testing to see what the effect of SO3
    22 would be on --
    23
    MR. ROSS: Not to my knowledge, no.
    24
    MR. HARRINGTON: Does the State have any
    Keefe Reporting Company
    165

    1 studies in its possession which demonstrate the impact of
    2 SO3 conditioning upon the effectiveness of the
    3 halogenated powdered activated carbon injection?
    4
    MR. ROSS: Studies? No. We have Powerpoint
    5 slides that refer to studies, but we don't have the
    6 studies themselves, to the best of my knowledge, in our
    7 possession. I believe Dr. Staudt in all likelihood is in
    8 possession of those studies.
    9
    31, "If so, please describe that study and its
    10 conclusion." Again, Dr. Staudt is the best person to
    11 answer this question.
    12
    32, "Has Illinois EPA made any determination of
    13 the impacts of halogenated powdered activated carbon
    14 injection prior to the EPSs upon the performance of the
    15 ESPs to achieve particulate and opacity standards or upon
    16 the reliability of the ESPs?" Answer is yes, we have
    17 looked into this issue.
    18
    33, "If so, please describe that study and its
    19 conclusions." This filing has been submitted on recycled
    20 paper, it says here on mine. This is thoroughly
    21 discussed in the TSD. I believe there's a portion or
    22 segment of the TSD in Section 10 dedicated specifically
    23 to this topic. Our conclusion was that if an increase in
    24 PM emissions would occur, it is believed it would be
    Keefe Reporting Company
    166

    1 minimal, again due to the small addition to the
    2 particulate loading from the ESP from sorbent injection,
    3 so that is the conclusion, and it goes into detail in the
    4 Technical Support Document on why this is so. Basically,
    5 the incremental addition of particulate that occurs as a
    6 result of ACI injection is small in comparison to the
    7 overall loading an ESP experiences under normal
    8 operation. I believe it's between 1 percent or typical
    9 number's around 1 percent, and several of the -- well, I
    10 don't want to say several -- at least one or two of the
    11 tests that have been performed on ESP systems have looked
    12 into this issue, and Dr. Staudt will be going into some
    13 detail on those.
    14
    MS. BASSI: When you say at least one or
    15 two, is -- 1 percent at least one or two tests that were
    16 performed in this, do you mean there were only one or two
    17 tests performed or out of a whole myriad of tests only
    18 one or two showed 1 percent?
    19
    MR. ROSS: Well, I wasn't necessarily tying
    20 those together.
    21
    MS. BASSI: Oh.
    22
    MR. ROSS: I believe what we looked at is
    23 the incremental addition in particulate that the ESP
    24 would see as a result of ACI injection, and our
    Keefe Reporting Company
    167

    1 conclusion was that it would see an additional loading of
    2 around 1 percent, so what I'm saying is the additional
    3 loading to the ESP as a result of ACI is minimal, and we
    4 believe a lot of the ESPs would easily handle this
    5 additional particulate loading, and in some of the stack
    6 tests, we did have staff -- some staff go back and -- or
    7 who were familiar with stack testing at some of the power
    8 plants and the ESPs conducted at those power plants that
    9 the ESPs were -- the level that they demonstrated
    10 compliance was well above that 1 percent when you looked
    11 at it that they could easily handle this additional
    12 loading. I wouldn't say easily. They could handle this
    13 additional loading.
    14
    HEARING OFFICER TIPSORD: Mr. Harrington?
    15
    MR. HARRINGTON: Are you or other members of
    16 your panel the appropriate persons to direct questions
    17 about Section 10.4 of the Technical Support Document or
    18 should those be reserved for Dr. Staudt?
    19
    MR. ROSS: Well, I would say it would
    20 probably be best to ask those questions with Dr. Staudt
    21 present up here and a member of the Agency up here as
    22 well. That was a collaborative effort between Dr. Staudt
    23 and Agency personnel.
    24
    MR. HARRINGTON: We'll reserve those
    Keefe Reporting Company
    168

    1 questions for him.
    2
    HEARING OFFICER TIPSORD: Thank you.
    3
    MR. ROSS: 34, "Has Illinois EPA made any
    4 independent determination whether the use of halogenated
    5 powdered activated carbon injection prior to the ESPs
    6 would result in significant increase of particulate
    7 emissions potentially triggering the prevention of
    8 significant deterioration or nonattainment New Source
    9 Review on the type and size of ESPs in operation in
    10 Illinois?" Yes, we have looked into this issue, and
    11 again, it is addressed in the TSD.
    12
    HEARING OFFICER TIPSORD: Mr. Harrington?
    13
    MR. HARRINGTON: Just follow up. Is -- In
    14 addition to what's set forth in 10.4 of the TSD, do you
    15 have any other information on this subject?
    16
    MR. ROMAINE: I would just comment that it
    17 is something that was considered in development of the
    18 Temporary Technology Based Standard, which does establish
    19 an alternative criteria for activated carbon injection if
    20 a source demonstrates that injection of a higher rate
    21 would threaten compliance with New Source Review or PSD.
    22
    HEARING OFFICER TIPSORD: I'm sorry. You
    23 trailed off, Mr. Romaine. New Source Review or --
    24
    MR. ROMAINE: Prevention of significant
    Keefe Reporting Company
    169

    1 deterioration.
    2
    HEARING OFFICER TIPSORD: Yes. Thank you.
    3
    MR. HARRINGTON: We'll have an opportunity
    4 later to talk more about the temporary technology. I'll
    5 hold those questions.
    6
    MR. ROSS: 36.
    7
    HEARING OFFICER TIPSORD: You know what?
    8 Let's -- It's almost 2:30. Let's take a ten-minute
    9 break, and then we'll take another one between 3:30 and
    10 4.
    11
    (Brief recess taken.)
    12
    HEARING OFFICER TIPSORD: I think we're
    13 ready to go to Ameren question 36.
    14
    MR. BONEBRAKE: Madam Hearing Officer, I did
    15 have a follow-up question on Mr. Romaine's last statement
    16 right before break.
    17
    HEARING OFFICER TIPSORD: Okay.
    18
    MR. BONEBRAKE: Mr. Romaine, I think you
    19 mentioned just before we broke that New Source Review was
    20 considered in connection with the TTBS. Can you describe
    21 for us the analysis or other consideration of New Source
    22 Review that was performed by IEPA in connection with the
    23 TTBS?
    24
    MR. ROMAINE: There was no quantitative
    Keefe Reporting Company
    170

    1 analysis performed. The provisions in the TTBS that
    2 require injection of activated carbon at certain rates
    3 were simply bypassed in the event that the owner/operator
    4 of an EGU demonstrates that such rate or rates would
    5 increase particulate matter emissions or opacity to where
    6 it would threaten compliance with applicable regulatory
    7 requirements, so that is a feature of the TTBS that
    8 specifically responds to concerns expressed about the
    9 impact of activated carbon injection on compliance with
    10 particulate matter standards, opacity regulations and New
    11 Source Review requirements.
    12
    MR. BONEBRAKE: You used the term bypassed
    13 in the answer. What do you mean by that, Mr. Romaine?
    14
    MR. ROMAINE: For existing sources, the TTBS
    15 requires that, as a general matter, halogenated activated
    16 carbon be injected at certain minimum rates. If a source
    17 demonstrates that injection of those rates at all times
    18 or under certain circumstances would threaten particulate
    19 matter or opacity compliance, alternative minimum rates
    20 can be set on a case-by-case basis.
    21
    MR. BONEBRAKE: So does that mean that --
    22 and when we talk about threaten compliance, are you
    23 talking about approaching the significance levels under
    24 the New Source Review program for specific pollutants?
    Keefe Reporting Company
    171

    1
    MR. ROMAINE: Under the New Source Review
    2 program, that's correct, threaten would mean approaching
    3 the significance levels.
    4
    HEARING OFFICER TIPSORD: Mr. Zabel?
    5
    MR. ZABEL: Was there any other
    6 consideration to New Source Review permitting in
    7 connection either with the TTBS or the underlying rule
    8 itself?
    9
    MR. ROMAINE: As has already been explained,
    10 there was consideration made, as discussed in the
    11 Technical Support Document. I was explaining a further
    12 consideration that occurred after the preparation of the
    13 Technical Support Document.
    14
    MR. ZABEL: That leads me to another line of
    15 questions. Mr. Kim, I'm not -- I don't mean to interrupt
    16 you back there, but whether this is the appropriate time.
    17 Something in the TTBS triggered in my mind a question of
    18 state permitting, and I don't know if you have -- if this
    19 is the appropriate point for me to pursue it or if you
    20 had probably in mind when we were discussing the rule
    21 more -- in more depth.
    22
    MR. KIM: I think when we get to the bulk of
    23 Mr. Romaine's testimony, that might be maybe a better
    24 time.
    Keefe Reporting Company
    172

    1
    MR. ZABEL: That's when I had planned on it.
    2 I just wanted to be sure that was appropriate and
    3 acceptable.
    4
    MR. KIM: And I neglected to -- since we
    5 have Mr. Romaine and Mr. Kaleel on the panel now, I
    6 didn't submit their prefiled testimony. Should I do that
    7 now or do you want me to wait?
    8
    HEARING OFFICER TIPSORD: I would say we
    9 could go ahead and wait. I --
    10
    MR. KIM: That's fine.
    11
    HEARING OFFICER TIPSORD: I think they're
    12 answering these questions and I'm not sure these
    13 questions are directly related to their testimony at this
    14 point, so --
    15
    MR. KIM: And I think that's why I just
    16 didn't think of it.
    17
    HEARING OFFICER TIPSORD: And I -- that's
    18 what I was thinking too. I didn't really ask for it,
    19 so --
    20
    MR. KIM: Okay. Thank you.
    21
    MR. ROSS: Question 36, "If an injection of
    22 halogenated powdered activated carbon before the ESPs on
    23 Illinois EGUs will not attain the standards set forth in
    24 the Illinois EPA proposed regulation, would you agree as
    Keefe Reporting Company
    173

    1 set forth in the Technical Support Document that the
    2 injection of halogenated powdered activated carbon after
    3 the ESPs and prior to a newly installed baghouse is the
    4 only logical next step at this time to attempt to achieve
    5 the Illinois standards?" The quick answer is no, we
    6 would not agree with that. There are many options
    7 available to a company to achieve the standard, and we've
    8 gone over some of those options previously, some of the
    9 flexibility provisions. There's averaging, and then also
    10 I believe this question was probably created before the
    11 TTBS. Obviously, with the TTBS now in the rule, you
    12 cannot meet the standard and still comply with the rule,
    13 but there are other options available, control
    14 configuration options available, and Dr. Staudt is the
    15 expert in that area, and I believe he had this question
    16 or a similar question asked of him, so he will be going
    17 over this question in his testimony.
    18
    HEARING OFFICER TIPSORD: Mr. Harrington?
    19
    MR. HARRINGTON: Brief follow-up. If we
    20 take out the words in this question "to achieve the
    21 Illinois standards" and substitute the words "90 percent
    22 removal, 0.008" --
    23
    MR. ROSS: I understand what you mean.
    24
    MR. HARRINGTON: Right.
    Keefe Reporting Company
    174

    1
    MR. ROSS: Taking out the flexibility
    2 provisions part of the equation.
    3
    MR. HARRINGTON: Right. Just the
    4 omission -- either of those two omissions.
    5
    MR. ROSS: Right, and I fall back on that
    6 there still are other control options that could be
    7 utilized besides halogenated ACI. We have not rested on
    8 the premise that halogenated ACI or PAC, powdered
    9 activated carbon, which are analogous, are the only
    10 ways -- or the only control devices that can be utilized
    11 to comply with the rule, and again, I'm going to defer to
    12 Dr. Staudt on much of this. He is the expert in this
    13 issue much more so than I.
    14
    MR. HARRINGTON: Then we will reserve
    15 follow-up questions for Dr. Staudt.
    16
    HEARING OFFICER TIPSORD: Thank you.
    17
    MR. KIM: If there's no objection, instead
    18 of reading the question and then -- can I just -- or can
    19 the witness just as we come to a question say we would
    20 like to defer this to Dr. Staudt?
    21
    HEARING OFFICER TIPSORD: Absolutely.
    22
    BOARD MEMBER MOORE: Yes.
    23
    MR. KIM: Questions 37 and 38 I believe --
    24
    MR. ZABEL: Boy, the appeal on that one got
    Keefe Reporting Company
    175

    1 ruled on quickly, didn't it?
    2
    MR. KIM: Questions 37 and 38 I believe we
    3 would like to defer to Dr. Staudt's panel.
    4
    MR. ROSS: And the only reason I was
    5 attempting, because they specifically asked had the
    6 Agency or had the Illinois EPA.
    7
    BOARD MEMBER MOORE: You're being very
    8 thorough.
    9
    MR. KIM: That's fine, but --
    10
    MR. ROSS: But I'd be more than happy to
    11 skip right over those.
    12
    MR. KIM: Maybe we can move to 39.
    13
    MR. HARRINGTON: I assume Mr. Ross is going
    14 to be on the panel with Dr. --
    15
    MR. ROSS: Yes.
    16
    MR. HARRINGTON: -- Staudt at that time in
    17 terms of the Agency official position in terms of the
    18 testimony?
    19
    MR. KIM: Yes, he will.
    20
    MR. ROSS: Yes, I will.
    21
    MR. HARRINGTON: Very good. We'll reserve,
    22 then.
    23
    MR. ROSS: 39, "Has the Illinois EPA made
    24 any independent determination on the availability of such
    Keefe Reporting Company
    176

    1 equipment for all of the EGUs in the state of Illinois
    2 burning sub-bituminous coal?" And I believe that
    3 question is referring to baghouses or fabric filters; is
    4 that --
    5
    MR. HARRINGTON: Yes.
    6
    MR. ROSS: Okay. And the answer is no, we
    7 have not made any independent determination as far as
    8 that goes, because we don't believe they will be required
    9 on a widespread basis.
    10
    40, "If so, please describe that study and its
    11 conclusion." And I rest on my previous answer.
    12
    MR. KIM: And I believe we can skip
    13 questions 41 and 42 until Mr. Foerter is available.
    14
    MR. ROSS: I believe he is asked a similar
    15 or the same question.
    16
    MR. HARRINGTON: Let's just -- Obviously
    17 this question's aimed at the Illinois EPA itself having
    18 made such a determination.
    19
    MR. ROSS: Okay. In that case, proceed?
    20
    HEARING OFFICER TIPSORD: Are you going to
    21 be available with Mr. Foerter so that we can do that at
    22 that time?
    23
    MR. ROSS: Yes, I am.
    24
    HEARING OFFICER TIPSORD: If that's
    Keefe Reporting Company
    177

    1 acceptable. And then that way, if there are follow-ups
    2 that you feel more comfortable directing to him, we'll
    3 have you all together.
    4
    MR. ROSS: 43 is in the same category as 41
    5 and 42. Dave Foerter, for the record, is with the
    6 Institute of Clean Air Companies, which is an
    7 organization that represents pollution control vendors,
    8 so he is considered an expert on these matters.
    9
    MR. KIM: 44, then, I think would --
    10
    HEARING OFFICER TIPSORD: Also go. Right.
    11 43. So we'll go to 45.
    12
    MR. ROSS: Okay. 45, "Is it not Illinois
    13 EPA's position and belief that the limitations specified
    14 in the proposed Illinois regulation can be achieved by
    15 the injection of halogenated powdered activated carbon
    16 prior to the ESPs?" And that's tied in to the previous
    17 question, and so I believe that is not exactly our
    18 position and belief in that other options are available
    19 for compliance with the limitations.
    20
    MR. HARRINGTON: We should ask Dr. Staudt
    21 about those?
    22
    MR. ROSS: I believe you should ask the
    23 panel when Dr. Staudt is present.
    24
    MR. HARRINGTON: Thank you.
    Keefe Reporting Company
    178

    1
    MR. ROSS: 46, "If the operators of the
    2 Illinois EGUs install such a technology and work to
    3 optimize its application without sacrificing control of
    4 opacity and particulate emissions but are unable to
    5 achieve the standards in the Illinois proposal, what do
    6 you envision the consequences to be?" Well, again, I
    7 believe our contention is that the rules can be complied
    8 with, and this question was probably asked in the context
    9 prior to the TTBS.
    10
    MR. HARRINGTON: If I may follow up?
    11
    HEARING OFFICER TIPSORD: Please,
    12 Mr. Harrington.
    13
    MR. HARRINGTON: The TTBS is limited to 25
    14 percent of the capacity of each company; is that correct?
    15
    MR. ROSS: That's correct.
    16
    MR. HARRINGTON: So for the other 75 percent
    17 capacity, if the designated technology is installed and
    18 halogenated activated carbon prior to the ESPs is
    19 installed, cold-side ESPs with Powder River Basin coal,
    20 and they are unable to achieve the standard, what are the
    21 consequences?
    22
    MR. ROSS: I believe they would be out of
    23 compliance with the rule and they would enter into our
    24 enforcement proceedings, which is addressed -- and the
    Keefe Reporting Company
    179

    1 reason I was hesitant, because the consequences are
    2 addressed in some of the following questions in some
    3 detail.
    4
    MR. HARRINGTON: It goes beyond that, and
    5 why don't we go through those and we'll come back to this
    6 along the way.
    7
    MR. ROSS: Okay. 47, "As drafted, would not
    8 the continued operation be in violation of the regulation
    9 and the Title V permit that would be revised to
    10 incorporate the standards?" If the question is regarding
    11 a source's continued -- continuing to operate without
    12 complying with the proposed rule, then the answer is yes,
    13 the units would be operating in violation of the rule,
    14 and any revisions made to a source would not only be out
    15 of compliance with the rule, but also any applicable
    16 permit provision in an active Title V permit. However,
    17 as previously noted, there are other means by which
    18 sources may find additional flexibility to comply with
    19 the standard.
    20
    48, "In that case, would Illinois EPA believe
    21 that these facilities should shut down?" No, it is not
    22 our intent to cause the shutdown of any EGUs. As already
    23 discussed, the rule provides the affected facilities with
    24 several compliance options. Further, the Act provides
    Keefe Reporting Company
    180

    1 the option of seeking a variance to allow for additional
    2 time if necessary or an adjusted standard if the source
    3 can support such a request.
    4
    49, "Would Illinois EPA support variances and/or
    5 adjusted standards to allow continued operation of these
    6 facilities either with or without the addition of
    7 additional controls?" And we support the current
    8 structure of the Act and rules which allow for variances
    9 and adjusted standards. However, the Agency cannot
    10 speculate on whether it would support a request that it
    11 has not yet seen which is hypothetical in nature.
    12 Rather, the Agency would review any request for a
    13 regulatory relief on its own merits before a
    14 recommendation is made to the Board.
    15
    MR. HARRINGTON: Let me pursue this, if I
    16 may.
    17
    HEARING OFFICER TIPSORD: Mr. Harrington?
    18
    MR. HARRINGTON: For an adjusted standard,
    19 either there has to be a provision specifically in the
    20 rule setting forth how to obtain it, what the standard
    21 will be to get an adjusted standard, or you have to show
    22 that it is --
    23
    HEARING OFFICER TIPSORD: We're losing you
    24 in the microphone.
    Keefe Reporting Company
    181

    1
    MR. HARRINGTON: My understanding of the
    2 rule is the statute is for an adjusted standard, either
    3 it has to be provided for in the rule when it's adopted
    4 setting forth the standards to obtain one or you must
    5 show that it's based on circumstances not considered
    6 during the rulemaking. Is that your understanding as
    7 well?
    8
    MR. ROSS: I would have to consult with our
    9 legal staff and provide a follow-up answer to that.
    10
    MR. HARRINGTON: Well, assume that just for
    11 a moment. Has the Agency considered providing standards
    12 in the rule that would allow for an adjusted standard if
    13 this technology was installed even on units that didn't
    14 comply for the TTBS but despite proper operation was
    15 unable to achieve the limitations?
    16
    MR. ROSS: I know that we discussed that in
    17 some level of detail, and the conclusion that was reached
    18 in these discussions was that an adjusted standard and
    19 variances were available in the situation you're
    20 describing, so --
    21
    MR. HARRINGTON: Well, the rule can provide
    22 the standard within the rule, as I understand it, for
    23 getting such an adjusted standard so that there isn't an
    24 argument later on as to what somebody has to show to get
    Keefe Reporting Company
    182

    1 one. Has the Agency considered including such a
    2 provision --
    3
    MR. ROSS: I would say --
    4
    MR. HARRINGTON: -- in the rule?
    5
    MR. ROSS: I would say no, we have not. The
    6 discussions I was involved with was that that was
    7 problematic, if not allowed, providing for an adjusted
    8 standard type of provision in the rule, so that may be
    9 something we need to go back and evaluate if what now
    10 you're saying is that there is the ability to do
    11 something like that in the rule.
    12
    MR. HARRINGTON: Even if variances and
    13 adjusted standards are available under the Illinois
    14 Environmental Protection Act, do you understand that they
    15 are not binding on the federal government and so USEPA
    16 has officially approved them as an amendment to the state
    17 of limitation plan?
    18
    MR. ROSS: I believe that's accurate.
    19
    MR. HARRINGTON: And that USEPA and/or
    20 citizens could sue under the Clean Air Act for violation
    21 of the standard, the underlying standard, until and
    22 unless the variance for adjusted standard is approved as
    23 a revision?
    24
    MR. ROSS: I believe that's accurate to the
    Keefe Reporting Company
    183

    1 extent these provisions are included in the Title V
    2 permit. Is that --
    3
    MR. HARRINGTON: In addition, your -- my
    4 understanding is the proposal is to submit the Illinois
    5 rule to the USEPA for approval as part of the federally
    6 enforceable standards in Illinois; isn't that correct?
    7
    MR. ROSS: That's correct.
    8
    MR. HARRINGTON: And once it's so approved,
    9 then it is enforceable by USEPA regardless of the Title V
    10 permit; is that correct?
    11
    MR. ROSS: That's correct.
    12
    MR. HARRINGTON: And if it's enforceable by
    13 USEPA, it continues to be enforceable until and unless
    14 the variance for adjusted standards is approved by USEPA;
    15 isn't that correct?
    16
    MR. ROSS: That is correct.
    17
    MR. HARRINGTON: When was the last time an
    18 Illinois variance for adjusted standard was approved by
    19 Region 5 of the USEPA?
    20
    MR. ROSS: I can't answer that. I'll have
    21 to go back and review. We could probably provide an
    22 answer.
    23
    MR. HARRINGTON: Are you aware of any that
    24 have been approved as -- by USEPA as amendments to the
    Keefe Reporting Company
    184

    1 state of limitation plan?
    2
    MR. ROSS: No, but me saying that I'm not
    3 aware of any I would say does not carry a lot of weight.
    4
    MR. ROMAINE: I am aware of these type of
    5 proceedings that have been approved by USEPA.
    6 Unfortunately, I'm not able off the top of my head to
    7 give specifics either.
    8
    MR. HARRINGTON: It is a long and tedious
    9 process if it occurs at all, is it not?
    10
    MR. ROSS: That would not surprise me.
    11
    MR. ROMAINE: It can be. I've been
    12 surprised that some proceedings have moved fairly
    13 quickly.
    14
    MR. HARRINGTON: And during a period prior
    15 to approval of such a variance in adjusted standard,
    16 citizens can also bring an action under the Clean Air
    17 Act; is that correct?
    18
    MR. ROSS: I believe that is correct.
    19
    MR. HARRINGTON: Would this not subject
    20 facilities in Illinois to potential federal and state --
    21 federal and citizen sued enforcement potentially
    22 resulting in shutdowns even though that's not the
    23 Agency's intention?
    24
    MR. KIM: I'd just like to note --
    Keefe Reporting Company
    185

    1
    MR. ROSS: I can't answer that.
    2
    MR. KIM: -- that I don't believe -- as long
    3 as Mr. Ross can answer these questions, I think that's
    4 fine, but obviously with the proviso that Mr. Ross is not
    5 an attorney and is not necessarily going to be as well
    6 versed -- not to say his answers are incorrect, but not
    7 to say that he's going to be well versed in the
    8 intricacies of enforcement.
    9
    MR. HARRINGTON: And acknowledged, but as
    10 head of the program that we're dealing with here, I think
    11 the background of this rule and what its implications are
    12 is something that obviously would have been considered by
    13 him and his staff and superiors in the Agency, and I
    14 thought it needed to be brought out on the record. Has
    15 the Agency considered -- this follows a question by
    16 Mr. Zabel earlier -- not submitting this rule as a
    17 federally approved rule and maintaining it as a state
    18 only rule and adopting CAMR or something similar to meet
    19 the federal requirements?
    20
    MR. ROSS: That is a specific question that
    21 is asked coming up.
    22
    MR. HARRINGTON: Well, we'll proceed to that
    23 question.
    24
    MR. ROSS: Well, I say coming up with the
    Keefe Reporting Company
    186

    1 understanding there are 45 more questions. 50, "If the
    2 operators of the EGUs which installed a halogenated
    3 powdered activated carbon injection before the ESPs in
    4 good faith and in reliance upon the Agency's opinions as
    5 expressed in this proceeding are unable to achieve the
    6 standard set forth in the rule, would you agree that they
    7 should be allowed to continue operating employing such
    8 controls?" We cannot support continuing operation of
    9 EGUs that are not in compliance with the rule. However,
    10 as described in previous answers, we believe the rule
    11 allows for ample flexibility such that compliance of all
    12 EGUs is reasonably attainable. Alternatively,
    13 traditional compliance and enforcement or regulatory
    14 options may be pursued, and of note is that the specific
    15 scenario described is addressed by the TTBS, which allows
    16 for continued operation of a unit that has installed
    17 halogenated ACI prior to a cold-side ESP but such unit is
    18 unable to comply with the standard.
    19
    51, "As written, would not the requirements of
    20 the proposed regulation be written in the Title V permits
    21 for each of the EGUs?" And yes, that is our intent.
    22 However, several of the Title V permits are under appeal,
    23 and therefore there is -- we have discussed this issue
    24 and we do envision that many of these requirements would
    Keefe Reporting Company
    187

    1 appear in construction permits if needed and potentially
    2 in federally enforceable state operating permits.
    3
    MR. HARRINGTON: Could you read back that
    4 answer, please?
    5
    (Requested portion read back by the
    6
    reporter.)
    7
    MR. HARRINGTON: Is that federally
    8 enforceable state operating permits?
    9
    MR. ROSS: Correct, FESOPs.
    10
    MR. ROMAINE: I just wanted to comment that
    11 we are assuming that you were referring to the adopted
    12 rules. We're not planning to put the proposed rules in
    13 any permits.
    14
    MR. HARRINGTON: That's -- We understand
    15 that. We hope that's the case. Thank you.
    16
    MR. ROMAINE: And certainly the rules would
    17 be placed in permits and designated as state-only
    18 enforceable until such time as they were actually adopted
    19 by USEPA as part of Illinois' implementation plan. It
    20 would not be our intent to short-circuit the USEPA's
    21 formal approval program by placing it within the permit.
    22
    MR. HARRINGTON: Thank you.
    23
    MR. ROMAINE: In terms of the comment, I
    24 think we -- my opinion is that the state rules are
    Keefe Reporting Company
    188

    1 enforceable as state rules when adopted. Eventually they
    2 have to find their way into a Title V or Clean Air Act
    3 Permit Program permit. Given the difficulties with
    4 getting those permits actually effective for coal-fired
    5 power plants, it's possible that we would be relying
    6 simply on their effectiveness through regulation for a
    7 while.
    8
    HEARING OFFICER TIPSORD: Mr. Zabel?
    9
    MR. ZABEL: Is it the Agency's view that
    10 construction permits -- state construction permits will
    11 be required for ACI installation?
    12
    MR. ROMAINE: Could you please repeat the
    13 question?
    14
    MR. ZABEL: Could you read it back, please?
    15
    (Requested portion read back by the
    16
    reporter.)
    17
    MR. ROMAINE: Yes, it is. ACI installation
    18 would constitute installation of an air pollution control
    19 device.
    20
    MR. ZABEL: And the current regulations
    21 would require a construction permit for that in your
    22 view.
    23
    MR. ROMAINE: That is correct.
    24
    MR. ZABEL: Thank you.
    Keefe Reporting Company
    189

    1
    MR. ROMAINE: We would attempt to expedite
    2 the issuance of those permits as they facilitate
    3 compliance with this regulation.
    4
    MR. ZABEL: What's the average time to act
    5 on a construction permit for pollution control equipment,
    6 Mr. Romaine?
    7
    MR. ROMAINE: I don't keep those statistics.
    8 It varies based on the type of control equipment and the
    9 availability of a prior construction permit. Once we
    10 have the first prototype, the timing becomes much
    11 quicker.
    12
    MR. ZABEL: How long in advance of the
    13 requirement to have the permit is an application
    14 required?
    15
    MR. ROMAINE: Under Section 39(a) of the
    16 Act, we're required to act on applications for
    17 construction permits within 90 days if public notice is
    18 not required.
    19
    MR. ZABEL: I think that wasn't my question,
    20 but I appreciate -- that would have been the next one
    21 anyway, but how long in advance of the 90 days that the
    22 Agency has to act on it is the permittee required to
    23 apply for the permit?
    24
    MR. ROMAINE: I don't believe that the
    Keefe Reporting Company
    190

    1 regulations specify a certain period of time in advance
    2 of that statutory time an applicant is required to apply
    3 for a permit.
    4
    MR. ZABEL: So a construction permit in
    5 theory could be applied one day before it was needed.
    6
    MR. ROSS: That would not be wise.
    7
    HEARING OFFICER TIPSORD: No.
    8
    MR. ZABEL: I'll stipulate to that answer,
    9 Mr. Ross.
    10
    MR. ROMAINE: I was using the time clock
    11 rather differently. There's nothing that says an
    12 applicant has to apply one day -- cannot apply one day
    13 before the ninety days with which the Agency is allowed
    14 to turn around the permit application.
    15
    MR. ZABEL: Did the Agency -- and I don't
    16 know if this is appropriate for you, Mr. Romaine. Did
    17 the Agency consider the permitting time in setting its
    18 timetable for this regulation?
    19
    MR. ROMAINE: We did not explicitly consider
    20 the permitting time. I think that's because we do not
    21 expect that the permitting time would pose an obstacle to
    22 compliance.
    23
    HEARING OFFICER TIPSORD: Question number
    24 52?
    Keefe Reporting Company
    191

    1
    MR. ROSS: "In that case, would not the
    2 limits be enforceable by USEPA and by the citizens
    3 independent of the Illinois EPA's decision in the
    4 matter?"
    5
    MR. ROMAINE: Well, once these regulations
    6 are approved by USEPA as part of Illinois' plan, they're
    7 enforceable by USEPA. Whether or not they're in the
    8 Title V permit does not directly affect USEPA's ability
    9 to enforce those regulations. It also doesn't affect the
    10 public's ability to enforce those regulations. The
    11 public has the ability to enforce these regulations under
    12 state law. Inclusion of the regulations or provisions of
    13 the regulation in the Title V permit would allow the
    14 public to enforce the regulations -- would facilitate the
    15 public's ability to enforce the regulations under federal
    16 law. However, they would also have that ability under
    17 the state regulations.
    18
    HEARING OFFICER TIPSORD: I'm sorry.
    19 Mr. Zabel?
    20
    MR. ZABEL: On the construction permit
    21 question, there's a new exclusion for pollution control
    22 equipment. I take it it's the Agency's view that would
    23 not apply to ACI installations?
    24
    MR. ROMAINE: That is correct. That
    Keefe Reporting Company
    192

    1 exclusion does not extend to control systems that are
    2 installed to comply with new regulations, new regulatory
    3 requirements, or in response to enforcement actions.
    4
    MR. ZABEL: I'm curious why that's
    5 explicitly addressed in the draft -- in the proposed --
    6 in the amendment, the TTBS, wasn't addressed in the
    7 original rule proposal.
    8
    MR. ROMAINE: I don't understand the
    9 question.
    10
    MR. ZABEL: The TTBS I believe -- and I have
    11 it in -- right in front of me, Mr. Romaine -- explicitly
    12 states that a construction permit would be required for
    13 someone getting the TTBS, but there's no such statement
    14 one way or the other in the general proposed mercury
    15 rule.
    16
    MR. ROMAINE: That is correct.
    17
    MR. ZABEL: Was there some reason for that?
    18
    MR. ROMAINE: Yes, there was.
    19
    MR. ZABEL: Which was? We're back in a
    20 deposition.
    21
    MR. ROMAINE: If a source elects to operate
    22 under the TTBS, an argument could be made that they were
    23 in compliance with the regulation. With the newly
    24 adopted permit exemption, an argument could then be made
    Keefe Reporting Company
    193

    1 that a construction permit was not needed for the
    2 installation of the activated carbon injection system.
    3 To avoid that potential series of arguments, it was
    4 decided simply to state that even if a source elected to
    5 install -- or operate through the TTBS, the source would
    6 still have to obtain construction permits for the
    7 installation of activated carbon injection system. I
    8 hope I've got that right.
    9
    MR. ZABEL: It's 225 something. 225.234 --
    10 oh, dear -- (e)(1)(c), Mr. Romaine. I have it on a page
    11 8, but I'm not sure the pagination of each version of
    12 this is the same, so -- and, I mean, you said you weren't
    13 sure you had it right, so I'm citing it to you to take a
    14 look at and you can verify your last answer.
    15
    HEARING OFFICER TIPSORD: I also have it on
    16 page 8 of the proposed amendment.
    17
    MR. ROMAINE: I think I skipped a point in
    18 there that a source operating under the Temporary
    19 Technology Based Standard could propose to install
    20 additional control equipment. The provision that has
    21 been included in the Temporary Technology Based statement
    22 says that a construction permit would be required for
    23 that additional control equipment notwithstanding the
    24 fact that such a source would be in compliance based upon
    Keefe Reporting Company
    194

    1 its reliance upon the Temporary Technology Based
    2 Standard.
    3
    MR. ZABEL: Could you read that back? I
    4 don't think I understood that, which wouldn't surprise
    5 me.
    6
    (Requested portion read back by the
    7
    reporter.)
    8
    MR. ZABEL: I guess the phrase "additional
    9 control equipment" in that answer confused me,
    10 Mr. Romaine. What were you referring to?
    11
    MR. ROMAINE: I was considering a scenario
    12 situation where a source operating a unit under a
    13 Temporary Technology Based Standard elected to install
    14 additional control techniques to facilitate compliance
    15 with the emission standards in the proposed regulation.
    16
    MR. ZABEL: But if I understood your earlier
    17 question, someone applying for the installation of ACI
    18 not seeking the TTBS would have to get a construction
    19 permit; is that correct?
    20
    MR. ROMAINE: That's correct.
    21
    MR. ZABEL: And so if he's applying -- if
    22 he's installing additional equipment at this point to
    23 come into compliance with that rule, why would that have
    24 been any different?
    Keefe Reporting Company
    195

    1
    MR. ROMAINE: The scenario that's -- or the
    2 set of circumstances that's being addressed under
    3 225.234(e) is a source that is operating under the
    4 Temporary Technology Based Standard. That source is then
    5 evaluating other alternative techniques in addition to
    6 activated carbon injection or in conjunction with
    7 activated carbon injection as part of its efforts to
    8 comply with the numerical emission standards of the
    9 proposed rule. From a compliance perspective, that unit
    10 would hopefully be in compliance based upon its reliance
    11 on the Temporary Technology Based Standards
    12 notwithstanding the fact that it was not complying with
    13 the numerical emission standards. However, it would be
    14 taking action with some installation of additional
    15 control device to comply with the numerical emission
    16 standards.
    17
    MR. ZABEL: So each evaluation he undertakes
    18 requires a construction permit; is that correct?
    19
    MR. ROMAINE: Not necessarily. It would
    20 depend whether the evaluation entails installation of
    21 additional control devices.
    22
    MR. ZABEL: If it does, he would require a
    23 construction permit.
    24
    MR. ROMAINE: Yes, it would.
    Keefe Reporting Company
    196

    1
    MR. ZABEL: And the original question,
    2 setting aside the TTBS, the installation of ACI, just to
    3 come back to the question I believe you've already
    4 answered anyway, requires a construction permit.
    5
    MR. ROMAINE: That is correct.
    6
    MR. ZABEL: 201.146(hhh) is inapplicable
    7 in --
    8
    MR. ROMAINE: That is correct.
    9
    MR. ZABEL: Okay.
    10
    HEARING OFFICER TIPSORD: Mr. Bonebrake?
    11
    MR. BONEBRAKE: And just to follow up,
    12 Mr. Romaine, your view is that the construction permit
    13 exemption regulation that Mr. Zabel just cited would be
    14 inapplicable for the installation of ACI to achieve
    15 compliance with this rule because the rule would be
    16 considered new under the permit exemption; is that
    17 correct?
    18
    MR. ROMAINE: That is correct.
    19
    MR. BONEBRAKE: And it would be new because
    20 it would be promulgated -- if promulgated after the date
    21 the exemption was promulgated; is that correct?
    22
    MR. ROMAINE: I haven't looked at it in
    23 those terms. I believe that the actual -- what I was
    24 actually concerned about when I looked at it, in fact
    Keefe Reporting Company
    197

    1 with regard to another project, is that exemption also
    2 refers to proposed regulations. I did not look at it in
    3 terms of the wording for adopted regulations.
    4
    MR. ZABEL: I have a copy of the regulation
    5 if you'd like to look at it, Mr. Romaine.
    6
    MR. ROMAINE: I would. Thank you.
    7
    MR. ZABEL: It's just hhh. It's not the
    8 entire 146. Didn't want to kill a tree to copy the whole
    9 thing.
    10
    HEARING OFFICER TIPSORD: For the record,
    11 we're looking at 35 Illinois Admin Code 201.146(hhh).
    12
    MR. ROMAINE: I'm looking at the language
    13 that Mr. Zabel provided for newly adopted permit
    14 exemption, 201.146(hhh). The language that is of
    15 particular relevance is the language in (hhh)(4), which
    16 says that a construction permit would not be required or
    17 replacement or addition of air pollution control
    18 equipment for existing emission units in circumstances
    19 where different state or federal regulatory requirements
    20 or newly proposed regulatory requirements will not apply
    21 to the unit. So the -- one of the criteria to qualify
    22 for this new permit exemption is that different state or
    23 federal regulatory requirements or newly proposed
    24 regulatory requirements do not apply to the particular
    Keefe Reporting Company
    198

    1 unit. We would consider that these regulations would be
    2 either different state or federal requirements or newly
    3 proposed federal requirements. Therefore, a construction
    4 permit would be required for the installation of an
    5 activated carbon injection system to comply with these
    6 regulations.
    7
    MR. ZABEL: Since I had a lot of trouble
    8 with that language, Mr. Romaine, could you give me an
    9 example of when it -- when the exclusion would apply?
    10
    MR. ROMAINE: The exclusion would not apply?
    11
    MR. ZABEL: No, no. I'm sorry. Would
    12 apply. Give me a pollution control installation -- pick
    13 one -- I mean, I really don't care what it is -- when you
    14 would not need to get a construction permit; when this
    15 exemption to the exclusion wouldn't make you get a
    16 construction permit.
    17
    MR. ROMAINE: This exclusion -- This
    18 exception would be possible for somebody that simply
    19 elects to replace a control device that is old and
    20 believes that it's appropriate to install a new control
    21 device to comply with the regulations that it's currently
    22 complying with. It has routinely been relied upon given
    23 the short time span this rule's been in place for
    24 operations at industrial facilities who elect to replace
    Keefe Reporting Company
    199

    1 old, outdated baghouses with new models of baghouses.
    2
    HEARING OFFICER TIPSORD: Ms. Bassi?
    3
    MS. BASSI: With respect to this number --
    4 or subsection 4 to hhh, how do you define new, newly
    5 proposed?
    6
    HEARING OFFICER TIPSORD: Ms. Bassi, again,
    7 I understand wanting to get to this point, but we're not
    8 going to belabor what this section means. If you want to
    9 relate it to this rule, that's fine, but we've already
    10 gone astray discussing what this section means. We'll
    11 answer this question but we're not going to belabor this
    12 point.
    13
    MS. BASSI: Well, let me put it in the
    14 context of this rule. Mr. Romaine, I believe that you
    15 testified a minute ago that this rule would not be
    16 reflected in a current construction permit or -- and by
    17 that I mean one that you would be issuing, say, today or
    18 tomorrow or any time before this rule is promulgated by
    19 the Board. Once the Board has promulgated this rule,
    20 assuming it does, is -- how does newly proposed fit into
    21 that context? I mean, then it's an existing rule.
    22
    MR. ROMAINE: That's correct. However,
    23 there's also language in the provision that talks about
    24 different state or federal regulatory requirements.
    Keefe Reporting Company
    200

    1
    MS. BASSI: But it's not a different state
    2 requirement because it's been adopted, and so how does
    3 this --
    4
    MR. ROMAINE: It would be different from the
    5 ones that were in place before it was adopted.
    6
    MS. BASSI: Thank you.
    7
    HEARING OFFICER TIPSORD: Mr. Forcade?
    8
    MR. FORCADE: Mr. Romaine, I'm assuming if
    9 you were to attempt to install pollution control
    10 equipment to achieve compliance with one of the standards
    11 in the rulemaking that you would need to apply for a
    12 construction permit?
    13
    MR. ROMAINE: That is my position, yes.
    14
    MR. FORCADE: Would you be able to construct
    15 the equipment before you got the permit?
    16
    MR. ROMAINE: Not in compliance.
    17
    MR. FORCADE: What is your definition of
    18 commenced construction? What would you be allowed to do
    19 and not allowed to do prior to the issuance of your
    20 permit?
    21
    MR. ROMAINE: When I'm asked those
    22 questions, I always get out the rules and quote back the
    23 definition of commenced construction. I don't have the
    24 entire board regulations with me.
    Keefe Reporting Company
    201

    1
    MR. FORCADE: Well, is it your recollection
    2 and belief that you would be able to order the equipment?
    3
    MR. ROMAINE: I know that the Agency has not
    4 pursued a course of action against people that have
    5 ordered equipment but have not undertaken the actual
    6 installation of the equipment.
    7
    MR. FORCADE: Would you be able to do more
    8 than simple grading on the site preparation issue?
    9
    MR. KIM: To the extent these questions are
    10 not necessarily limited to this rule, but this -- I mean,
    11 Mr. Forcade's question could be applied to any potential
    12 enforcement case involving a construction permit
    13 situation.
    14
    HEARING OFFICER TIPSORD: Mr. Forcade?
    15
    MR. FORCADE: No, my issue goes entirely to
    16 the issue of timing. If we're going to have an
    17 obligation from the date this rule is finally adopted,
    18 assuming it's adopted in the form the Agency's proposed,
    19 until December -- July two thousand --
    20
    MR. HARRINGTON: Nine.
    21
    MR. FORCADE: No, no, I'm talking about the
    22 application for the Title V permit. I want to know in
    23 that window what steps can be taken at what point in
    24 time, so it's directly related to this rule and unrelated
    Keefe Reporting Company
    202

    1 to enforcement. I want to know what you can legally do
    2 and not legally do in what time frame in order to achieve
    3 compliance under the obligations of the rule.
    4
    MR. KIM: Before Mr. Romaine answers, I'm
    5 going to again qualify his answer that what you're asking
    6 about -- and I'm not saying it's not a valid question,
    7 but it's -- you're posing a potential enforcement
    8 scenario, and on behalf of the Agency, I think we're very
    9 reluctant to commit to anything, especially in the
    10 context of a rulemaking hearing, exactly what we will or
    11 will not do in terms of an enforcement proceeding because
    12 nobody here is empowered to speak on behalf of the Agency
    13 and give you a commitment as to what we will or will not
    14 do in terms of potential enforcement. I mean, we -- with
    15 that qualification, you can ask Mr. Romaine what his
    16 interpretation is, I suppose, but I just want to make
    17 clear we're not making any kind of compliance -- or
    18 enforcement commitments prospectively in this context or
    19 in any other situation like this.
    20
    HEARING OFFICER TIPSORD: Okay.
    21
    MR. ROMAINE: As I said, I first refer
    22 people back to the regulation, then I discuss specific
    23 circumstances with them. My general advice at this time
    24 is comply with the permit application as soon as possible
    Keefe Reporting Company
    203

    1 and the Agency will do everything possible to accommodate
    2 sources to make sure that the permitting process does not
    3 stand in the way of actions that are necessary to come
    4 into compliance with the proposed regulation.
    5
    MR. FORCADE: So could you rewire the
    6 electrical? I mean, I'm trying to pursue a point which I
    7 don't seem to be getting an answer to, which is what are
    8 the things you can do prior to the issuance of the Agency
    9 permit?
    10
    MR. ROMAINE: Well, I guess theoretically
    11 speaking, would the rewiring of that electrical system be
    12 necessary for purposes other than compliance with the
    13 regulation? Can you come up with an argument on behalf
    14 of your client that suggests that that is an activity
    15 that they would be doing irrespective of the need to make
    16 changes to comply with this regulation?
    17
    MR. FORCADE: Assuming that they were not,
    18 am I correct that your answer would be you would not be
    19 allowed to do that without a construction permit?
    20
    MR. ROMAINE: You have just answered that
    21 yourself on behalf of your client.
    22
    MR. FORCADE: No, I haven't. I've asked you
    23 a question and I would appreciate an answer. Would it be
    24 correct in your view that if you could not make a case
    Keefe Reporting Company
    204

    1 for the electrical being redone for any purpose other
    2 than installation of this particular piece of pollution
    3 control equipment, would you be allowed to do that?
    4
    MR. KIM: Again, I -- before he answers,
    5 this is not getting to anything that's going to be
    6 relevant to this proceeding. We're asking about a
    7 specific scenario that somewhere down the road someone's
    8 going to get a piece of the transcript and say, oh, no,
    9 the Agency said you cannot sue us or you will not -- it's
    10 not constructive for this case. It's not helpful here
    11 and it's inappropriate to ask us, again, what we will or
    12 will not do in an enforcement proceeding potentially
    13 somewhere down the road.
    14
    HEARING OFFICER TIPSORD: Well, and if I
    15 may, I think that there's legitimate concern here
    16 concerning the timing of the effective date of the
    17 rule -- and I see where you're going with that -- the
    18 effective date of the rule and the amount of time you're
    19 going to have to apply for a construction permit that you
    20 may be required to have. What I'm going to suggest at
    21 this point is that Mr. Romaine will be testifying in the
    22 context of what the rule means and that perhaps we can
    23 better get at these issues in the context of the actual
    24 rule since that's one of the things he said he would rely
    Keefe Reporting Company
    205

    1 on, so, Mr. Forcade, if you wouldn't mind if we could
    2 hold these off, and let's continue with Ameren's
    3 questions at this point and we'll discuss them when we're
    4 actually looking at the context of the rule itself.
    5
    MR. FORCADE: That's fine.
    6
    HEARING OFFICER TIPSORD: And if I'm not
    7 mistaken, I believe that 53 and 54 have already been
    8 answered.
    9
    MR. ROSS: 53 I don't believe has been --
    10
    MR. HARRINGTON: I think those have been
    11 answered.
    12
    HEARING OFFICER TIPSORD: I think we've
    13 answered them about incorporating into the federally
    14 enforceable, yeah. And then question number 55?
    15
    MR. KIM: Can I instruct the witness never
    16 to disagree with you when you say the question's been
    17 answered?
    18
    MR. ROSS: I apologize. I apologize.
    19
    HEARING OFFICER TIPSORD: And at this point,
    20 since this question is specifically about Mr. Romaine's
    21 testimony, we probably need to enter his testimony into
    22 the record.
    23
    MR. KIM: Sure.
    24
    HEARING OFFICER TIPSORD: And we are going
    Keefe Reporting Company
    206

    1 to be admitting it as Exhibit No. 36, and we are
    2 admitting the testimony that's revised which was filed on
    3 April 28, I believe --
    4
    MR. KIM: Correct.
    5
    HEARING OFFICER TIPSORD: -- as Exhibit
    6 No. 36.
    7
    MR. BONEBRAKE: Madam Hearing Officer, did
    8 you admit the --
    9
    HEARING OFFICER TIPSORD: I did not, because
    10 it's part of the Administrative Code, so I did not admit
    11 it as an exhibit. We identified it for the record. If
    12 there's no objection, this will be admitted as Exhibit
    13 36. Seeing none, this is marked as Exhibit 36. Okay.
    14 Then, Mr. Romaine, you can go ahead and read question 55
    15 and answer it, please.
    16
    MR. ROMAINE: "As set forth as page 3 of
    17 Mr. Romaine's revised testimony, is it not correct that
    18 the earliest date that the first formal determination of
    19 compliance with these standards can occur is July 1,
    20 2010?" Answer, yes, this is correct, because compliance
    21 is determined on a 12-month rolling basis. The earliest
    22 date that 12 months of data would be available to
    23 formally determine compliance for an existing unit would
    24 be July 1, 2010, 12 full months after July 1, 2009. At
    Keefe Reporting Company
    207

    1 the same time, since emission monitoring must begin by
    2 January 1, 2009, existing sources should have a
    3 significant body of data to assess their expected
    4 compliance status well in advance of July 1, 2010.
    5
    56, "If at that time it is first determined that
    6 a facility is not in compliance, what penalties would it
    7 be subject to?" A facility/source would be subject to
    8 the usual enforcement procedures set forth in Section 31
    9 of the Act with penalties sought based on the nature and
    10 gravity of noncompliance. However, as has been described
    11 in other testimony, the proposed rule contains a number
    12 of regulatory options by which a source can show
    13 compliance.
    14
    HEARING OFFICER TIPSORD: 57?
    15
    MR. ROMAINE: 57.
    16
    HEARING OFFICER TIPSORD: Excuse me.
    17 Mr. Harrington has a follow-up.
    18
    MR. HARRINGTON: Am I correct that the
    19 technology -- strike that. Is it not correct that the
    20 removal or emission levels or emission standards set
    21 forth in this rule are intended to be at the limits of
    22 technology, to be achievable but not -- to be a stretch?
    23
    MR. ROSS: I believe we previously described
    24 them as aggressive.
    Keefe Reporting Company
    208

    1
    MR. HARRINGTON: Aggressive. So one could
    2 go through 360 days of the year and be on the cusp of
    3 compliance throughout that time and still not know
    4 whether you were going to comply on the 365th day; is
    5 that not correct?
    6
    MR. ROMAINE: That's theoretically possible.
    7 I think that's unlikely.
    8
    MR. HARRINGTON: Would you think people
    9 would be operating at 95 percent removal or are they more
    10 likely be operating at 89.9 and 90.1 percent removal?
    11
    MR. ROSS: I think our perspective is it
    12 would be hoped that they would be operating at a
    13 comfortable margin above the compliance requirements, but
    14 that would be up to the planning and strategy of each
    15 individual source.
    16
    MR. HARRINGTON: We will get to the
    17 technology, but if in fact the data establishes that for
    18 the technologies posited in the Technical Support
    19 Document that at their best they were operating at the
    20 margin of 90 percent compliance, would not the scenario I
    21 posited be more likely?
    22
    MR. ROSS: As you state, we will be
    23 discussing that in detail on Section 8, but there are --
    24 there is test data which shows and there are scenarios
    Keefe Reporting Company
    209

    1 where a high level of mercury reduction can be achieved,
    2 and there are also test data that show your scenario, so
    3 certainly it's a topic for debate.
    4
    MR. HARRINGTON: We'll get to that later.
    5
    HEARING OFFICER TIPSORD: Moving on, then.
    6
    MR. ROMAINE: 57, "If that is the first date
    7 a facility is determined not to be in compliance, would
    8 it be considered that there are 365 days of violation?"
    9 Yes.
    10
    58, "Would it be prudent for a company to rely
    11 upon questionable technology to meet such limits in light
    12 of the consequences of the failure to achieve
    13 compliance?" Response: I believe it's never prudent for
    14 a source to rely on questionable technology to meet its
    15 environmental obligations. However, the Agency disagrees
    16 with the suggestion in this question that the use of
    17 activated carbon injection or co-benefits for control of
    18 mercury emissions is questionable technology.
    19
    HEARING OFFICER TIPSORD: Question number
    20 59.
    21
    MR. ROMAINE: "Is it correct that the
    22 Illinois EPA has made no independent determination of the
    23 availability and accuracy of continuous emission monitors
    24 for measuring mercury and the flue gas?"
    Keefe Reporting Company
    210

    1
    MR. HARRINGTON: Should be "in the flue
    2 gas," obviously. I apologize.
    3
    MR. ROMAINE: Response: Agency staff have
    4 reviewed material prepared by USEPA as part of its
    5 rulemaking for CAMR but have not made an independent
    6 status -- study of the status of continuous monitoring
    7 technology for mercury emissions. That said, since the
    8 emissions monitoring requirements in the proposed rule
    9 are essentially identical to those in CAMR, the proposed
    10 rule would not impose monitoring requirements that are
    11 more burdensome or stringent than CAMR.
    12
    HEARING OFFICER TIPSORD: Mr. Romaine, you
    13 need to slow down when you're reading your responses.
    14 Question 60.
    15
    MR. ROMAINE: "If not" --
    16
    HEARING OFFICER TIPSORD: I'm sorry.
    17 Mr. Harrington?
    18
    MR. HARRINGTON: I try not to anticipate
    19 some of the following questions, but do you know whether
    20 USEPA's proposed technologies were designed to have the
    21 level of accuracy necessary to measure compliance with
    22 this rule?
    23
    MR. ROMAINE: I believe that the monitoring
    24 technologies that USEPA is relying upon for CAMR would
    Keefe Reporting Company
    211

    1 also be suitable for the proposed rule.
    2
    MR. HARRINGTON: Thank you.
    3
    HEARING OFFICER TIPSORD: Mr. Zabel?
    4
    MR. ZABEL: The risk of inaccuracy is quite
    5 different in a command and control than in a cap and
    6 trade rule, is it not, Mr. Romaine?
    7
    MR. ROMAINE: Yes, it is.
    8
    MR. ZABEL: In a cap and trade, if that
    9 inaccuracy showed a 365-day violation, the source could
    10 buy allowances to avoid the penalties; is that not true?
    11
    MR. ROMAINE: That is true.
    12
    MR. ZABEL: And there's no safe harbor under
    13 the command and control rule, is there?
    14
    MR. ROMAINE: There may not be a safe harbor
    15 under the command and control rule; however, we have
    16 developed this regulation now that we've included
    17 Temporary Technology Based Standard to include a safe
    18 harbor.
    19
    MR. ZABEL: But the question is, if the
    20 monitor has some degree of inaccuracy and shows a
    21 violation for a source that didn't get a TTBS, it's in
    22 violation and there's no safe harbor for it at that 365th
    23 day in July of 2010, is there?
    24
    MR. ROMAINE: That is correct.
    Keefe Reporting Company
    212

    1
    MR. ZABEL: Thank you.
    2
    HEARING OFFICER TIPSORD: Question?
    3
    MS. BASSI: Well, I was just going -- the --
    4 in order to take advantage of the TTBS, would -- is it
    5 correct to state that one would have to apply for it
    6 prospectively as opposed to saying what one's emissions
    7 are and then apply for the TTBS and have it apply
    8 retroactively?
    9
    MR. ROMAINE: That is correct.
    10
    MS. BASSI: Thank you.
    11
    MR. ROMAINE: 60, "If not, what such study
    12 has been performed?" As I've explained, USEPA and others
    13 have evaluated and continued to evaluate continuous
    14 monitoring technology for mercury emissions. Agency
    15 staff have reviewed and will continue to review material
    16 released by USEPA and others documenting this work.
    17
    HEARING OFFICER TIPSORD: Question 61.
    18
    MR. ROMAINE: "Are you aware of the current
    19 studies being performed by USEPA and its contractors to
    20 determine the accuracy and precision of continuous
    21 emission monitors for mercury?" It is my understanding
    22 that USEPA's work is targeted at improving continuous
    23 monitoring methodology, not assessing the current level
    24 of monitoring technology. It appears that USEPA is
    Keefe Reporting Company
    213

    1 particularly interested in assuring that traditional
    2 emissions monitoring systems which provide real-time
    3 emission data are available for CAMR as well as sorbent
    4 trap systems, which do not provide such immediate data
    5 since collected samples must be sent off to a laboratory
    6 for analysis.
    7
    HEARING OFFICER TIPSORD: Mr. Harrington?
    8
    MR. HARRINGTON: Just for the record, would
    9 you explain the difference between those two for the
    10 Board, please?
    11
    MR. ROMAINE: Under this rule and under
    12 CAMR, USEPA has basically followed two very different
    13 types of approaches to monitoring of mercury. One type
    14 of monitoring device is what I would call the traditional
    15 type of continuous emission monitoring device where an
    16 instrument is placed in the stack, provides instantaneous
    17 or essentially instantaneous feedback on levels of
    18 mercury emissions in the stack similar to the types of
    19 technology that is used for monitoring for sulfur
    20 dioxide, nitrogen oxides, carbon monoxide emissions,
    21 though it's not for the opacity, where there is in fact
    22 minute-by-minute, 15-minute by 15-minute or hourly data
    23 for the emissions of the pollutant from the unit.
    24
    Under CAMR, the proposed rule, USEPA -- well,
    Keefe Reporting Company
    214

    1 under CAMR, USEPA has also allowed the use of sorbent
    2 trap technology. A sorbent trap is a device that removes
    3 mercury from an extracted gas stream from the stack and
    4 measures the amount of mercury in that particular sample.
    5 That sample collects mercury for a period of time, a
    6 couple of days, maybe longer, and then that sample is
    7 then sent off to the laboratory to measure the amount of
    8 mercury that was collected on the trap during that period
    9 of time. The data for mercury emissions is only
    10 available when the analysis of the trap is conducted, so
    11 it does not provide immediate feedback. It provides
    12 periodic data on some frequency for the amount of mercury
    13 that has been emitted since the last trap was sent for
    14 analysis.
    15
    MR. HARRINGTON: How would the sorbent trap
    16 methodology be utilized in connection with the proposed
    17 IEPA rule?
    18
    MR. ROMAINE: The sorbent trap would be used
    19 to determine emission data, massive emissions into the
    20 atmosphere, in a manner similar to use -- in a manner
    21 similar to that for which a more traditional continuous
    22 emission monitor would be used.
    23
    MR. HARRINGTON: Would that sampling have to
    24 be low proportional to the flow of the flue gas?
    Keefe Reporting Company
    215

    1
    MR. ROMAINE: I think the answer is yes, you
    2 have to carefully correlate the amount of flue gas that
    3 is passed through the trap with this amount of flue gas
    4 that is coming out of the unit.
    5
    MR. HARRINGTON: Would you do this on a
    6 daily basis, like, take a sample every day and have it
    7 analyzed?
    8
    MR. ROMAINE: I'm not aware of what
    9 frequency is required for sorbent trapping, but the
    10 literature I was looking at suggested a couple of days.
    11 It might be possible for doing it for longer periods of
    12 time. One of the concerns is obviously not exceeding the
    13 absorption capacity of the actual trapping medium, and as
    14 you mentioned, another concern is making sure that you
    15 maintain appropriate accuracy of the data relative to the
    16 stack flow.
    17
    MR. HARRINGTON: And then the sorbent has to
    18 be sent off to an independent laboratory or a laboratory
    19 for analysis; is that correct?
    20
    MR. ROMAINE: That is correct.
    21
    MR. HARRINGTON: Do you know how long such
    22 analysis takes when it's sent off?
    23
    MR. ROMAINE: I don't know in particular how
    24 long it takes. USEPA has expressed concern that there is
    Keefe Reporting Company
    216

    1 certainly a lag time for analysis of those samples.
    2 Accordingly, a source using sorbent trap technology is
    3 not getting immediate feedback on the levels of emission
    4 of mercury coming out. They may not find out that
    5 information for a couple of weeks after the emissions
    6 have actually occurred.
    7
    MR. HARRINGTON: Do we know how many
    8 laboratories in or about Illinois are qualified to
    9 perform this analysis?
    10
    MR. ROMAINE: I do not know that.
    11
    MR. HARRINGTON: Do you know whether they
    12 would have the capacity to accommodate all of the
    13 facilities that would be subject to this rule?
    14
    MR. ROMAINE: I don't know that either. I
    15 would expect that if all the facilities subject to this
    16 rule elect to go with sorbent trap technology or
    17 monitoring technology that there would be laboratories
    18 that would be interested in their business, but I don't
    19 have anything specific at this point about capabilities
    20 of existing laboratories.
    21
    MR. HARRINGTON: Do you have any idea what
    22 the cost would be?
    23
    MR. ROMAINE: I have general ideas about the
    24 cost of monitoring as provided by USEPA in their
    Keefe Reporting Company
    217

    1 evaluation of technology. The cost for sorbent trap
    2 technology according to USEPA is somewhat higher than
    3 continuous emission monitoring data based on the
    4 information I saw. I don't know if it's changed
    5 recently.
    6
    MR. HARRINGTON: Now, with respect to
    7 continuous emission monitors, is it your understanding
    8 USEPA is presently doing studies to determine which, if
    9 any, of these will be appropriate for monitoring for
    10 CAMR?
    11
    MR. ROMAINE: I would not characterize it
    12 that way, no.
    13
    MR. HARRINGTON: How would you characterize
    14 it?
    15
    MR. ROMAINE: I would characterize it as
    16 USEPA working with the manufacturers of monitors to
    17 assure that there are monitors available for
    18 implementation of CAMR.
    19
    MR. HARRINGTON: Do you know if they are
    20 looking at whether these monitors will have the necessary
    21 levels of detection, accuracy, precision, variability, to
    22 be used in connection with the Illinois rule?
    23
    MR. ROMAINE: USEPA is focusing on making
    24 sure that the monitoring is available for the
    Keefe Reporting Company
    218

    1 implementation of CAMR. It's my position that the types
    2 of monitoring used for CAMR would also be suitable for
    3 use with Illinois' proposed rule, and USEPA is certainly
    4 working to make sure that there are monitoring
    5 methodologies that can be used. That involves I think
    6 both improvements to the monitoring methodology and it
    7 could eventually involve changes to other aspects of the
    8 regulations that are found in 40 CFR, Part 75, Subpart I.
    9
    MR. HARRINGTON: That's the monitoring and
    10 testing provisions of the federal rule?
    11
    MR. ROMAINE: That is correct.
    12
    MR. HARRINGTON: Are those provisions --
    13 Have you looked at those provisions and determined
    14 independently that they're appropriate for monitoring
    15 under the proposed Illinois regulation?
    16
    MR. ROMAINE: No, I have not.
    17
    MR. HARRINGTON: Would you expect those
    18 provisions to be followed for any monitoring in Illinois?
    19
    MR. ROMAINE: Yes, I would.
    20
    MR. HARRINGTON: Do you know if anyone else
    21 at the Agency has examined those provisions and the
    22 devices that are available to determine independently
    23 that they're suitable for monitoring compliance with the
    24 proposed Illinois rule?
    Keefe Reporting Company
    219

    1
    MR. ROMAINE: I'm not aware that any such
    2 evaluation has been performed as you've described it. As
    3 I've said, Agency staff, they're involved in continuous
    4 emission monitoring, are tracking what USEPA is doing
    5 with regard to the development of monitoring technology
    6 for implementation of CAMR.
    7
    MR. HARRINGTON: If those devices -- and I'm
    8 modifying -- sort of been modifying a couple of questions
    9 in light of these answers. If those devices are not
    10 precise and accurate at the levels of which monitoring
    11 would be needed under the Illinois rule, would you agree
    12 that that then presents a significant problem with this
    13 proposed regulation?
    14
    MR. ROMAINE: That's proposing a
    15 hypothetical situation that I don't believe to be the
    16 case. I believe that the needs of Illinois' rules are
    17 identical -- of the proposed rule are identical to those
    18 of CAMR.
    19
    MR. HARRINGTON: If the evidence in this
    20 proceeding should demonstrate to the contrary, would you
    21 change your opinion?
    22
    MR. ROMAINE: If evidence demonstrates
    23 something to the contrary, I'm always open to changing my
    24 opinion.
    Keefe Reporting Company
    220

    1
    MR. HARRINGTON: It's -- I have heard it
    2 suggested that the monitors have as much as a 20 percent
    3 bias either high or low but that it cannot be determined
    4 which in any individual case. Have you heard such
    5 information?
    6
    MR. ROMAINE: I have not heard such
    7 information, so I'm not able to comment on that.
    8
    MR. HARRINGTON: If that were the case,
    9 would it significantly impact the ability to monitor
    10 compliance with the Illinois rule?
    11
    MR. ROMAINE: I'm not sure. First, the
    12 Illinois rule is based on a 12-month rolling average, so
    13 that has an effect on the role of variability in
    14 monitoring data. It assumes a bias exists. That's
    15 different than variability, and I believe that USEPA's
    16 concern as part of implementation of CAMR is to make sure
    17 that there is not the type of bias that you're
    18 hypothesizing would exist. And finally, the types of
    19 circumstances that you've described theoretically are
    20 things that could have theoretically existed when USEPA
    21 adopted or the congress adopted the acid rain program for
    22 SO2 and NOx emissions and have not been found to be of
    23 concern, and in fact, monitoring technology has come up
    24 and been able to meet the regulatory demands that are put
    Keefe Reporting Company
    221

    1 on it.
    2
    MR. HARRINGTON: And again, to refer to
    3 Mr. Zabel's earlier question, both the acid rain program
    4 and the NOx program are trading programs, are they not,
    5 where companies have other options to come into
    6 compliance if they find that the calculations show them
    7 to be over their limit?
    8
    MR. ROMAINE: No.
    9
    MR. HARRINGTON: You said they're not
    10 trading programs?
    11
    MR. ROMAINE: I'm being very precise. Under
    12 the acid rain program, the SO2 requirements for a trading
    13 program, the NOx control requirements allowed for
    14 averaging but they were not a trading program. Obviously
    15 the NOx trading program is a trading program.
    16
    MR. HARRINGTON: I believe that takes us
    17 through question 65. I believe some of these additional
    18 questions may have been answered earlier, but there may
    19 be some additional follow-up on the sampling for the
    20 coal.
    21
    HEARING OFFICER TIPSORD: All right. Let's
    22 take a short break and let you guys take a look at that
    23 and see where you want to be.
    24
    (Brief recess taken.)
    Keefe Reporting Company
    222

    1
    HEARING OFFICER TIPSORD: All right. I
    2 believe we were going to go to question number 66.
    3
    MR. KIM: Before we -- I'm sorry. Before we
    4 proceed, I just have a request. Jeff Sprague was
    5 identified as a person on this panel, but he's been
    6 pretty quiet for a while and he doesn't have any -- he
    7 will not be answering any of the questions here today of
    8 the Ameren general questions, so unless there's an
    9 objection by anybody, I'd like to be able to cut him
    10 loose from the panel.
    11
    MR. HARRINGTON: No objection.
    12
    MR. KIM: Thank you.
    13
    HEARING OFFICER TIPSORD: And,
    14 Mr. Harrington, you had raised your hand about question
    15 66?
    16
    MR. HARRINGTON: Actually, I dropped back on
    17 the question for the -- is this on?
    18
    HEARING OFFICER TIPSORD: Uh-huh.
    19
    MR. HARRINGTON: Okay. A question on the
    20 monitoring of mercury in the flue gas. It's been called
    21 to my attention that the plus or minus 20 percent
    22 variation in continuous emission monitors from true value
    23 is actually the USEPA quality control standard for
    24 certification of such monitors. Are you familiar with
    Keefe Reporting Company
    223

    1 that?
    2
    MR. ROMAINE: Yes and no.
    3
    MR. HARRINGTON: Explain, please.
    4
    MR. ROMAINE: I'm aware of the performance
    5 specifications for continuous emission mercury monitors,
    6 but the performance specification does not address
    7 variation from true values.
    8
    MR. HARRINGTON: Would you explain what the
    9 performance specification does address?
    10
    MR. ROMAINE: Performance specification is
    11 the measure of the difference in measured values between
    12 a continuous emission monitor and a reference method.
    13
    MR. HARRINGTON: And the reference method in
    14 this case?
    15
    MR. ROMAINE: That's a good question. I'm
    16 not sure what the reference method is. One of the things
    17 that I believe USEPA is working on is to refine the
    18 reference method that would be used in conjunction with
    19 continuous mercury monitoring.
    20
    MR. HARRINGTON: And I think the supposition
    21 behind your answers is that the reference method also
    22 won't necessarily represent a true value.
    23
    MR. ROMAINE: That is correct.
    24
    MR. HARRINGTON: Has the Agency made any
    Keefe Reporting Company
    224

    1 attempt to calculate what the concentration of mercury in
    2 the flue gas would be for someone typically getting the
    3 0.008 pounds per gigawatt hour standard?
    4
    MR. ROSS: If I'm getting the question
    5 right, have we made any calculation of what the
    6 concentration of mercury would be in the flue gas to meet
    7 the 0.008 pounds per gigawatt hour?
    8
    MR. HARRINGTON: Correct.
    9
    MR. ROSS: Not above and beyond that the
    10 concentration would need to be such that it would be in
    11 compliance. We haven't done any specific calculations.
    12 I mean, that provision was added for flexibility purposes
    13 as a benefit to power plants to provide them with
    14 additional options to comply with the regulation. We
    15 haven't gone above and beyond that level of thinking, I
    16 believe.
    17
    MR. HARRINGTON: Well, going back to the
    18 public hearing, was it not explained at the public
    19 hearings that the 0.008 pounds per gigawatt hour was an
    20 attempt to calculate what 80 percent removal would be,
    21 taking into account -- 90 percent removal, taking into
    22 account the benefits of washing coal so that supposedly
    23 the actual emissions per ton of coal would be about the
    24 same whether it was from washed bituminous coal or PRB
    Keefe Reporting Company
    225

    1 coal so you got credit for that washing?
    2
    MR. ROSS: That's correct. We established a
    3 lower bound and an upper bound and then we picked a
    4 parameter in between those bounds that the calculations
    5 that we did showed that we were providing some level of
    6 credit for coal washing, correct. I think it was 47
    7 percent mercury reduction pre-combustion.
    8
    MR. HARRINGTON: So from that, one could
    9 assume that the concentrations in flue gas from either
    10 somebody meeting the 90 percent removal requirement and
    11 somebody meeting the 0.008 pound per gigawatt requirement
    12 would be the same on the same type of facilities,
    13 roughly. I mean, not with great precision, but --
    14
    MR. ROSS: Well, there's many variables in
    15 there, so I don't know if that's necessarily the case.
    16
    MR. HARRINGTON: Would a value of 0.8
    17 micrograms per cubic meter be a realistic value for what
    18 the flue gas would be from a system meeting the
    19 requirements of the proposed Illinois rule at either 90
    20 percent removal or 0.008 pounds per gigawatt?
    21
    MR. ROMAINE: I have not done the
    22 calculations or done the investigation to confirm the
    23 reasonableness of that number.
    24
    MR. HARRINGTON: Assuming for a moment that
    Keefe Reporting Company
    226

    1 number is the correct range, what would be the effect if
    2 a mercury continuous emission monitor or other monitoring
    3 system had an accuracy of one microgram per -- plus or
    4 minus one microgram per cubic meter?
    5
    MR. ROMAINE: It would make it impossible to
    6 determine compliance with that particular emission
    7 standard as a practical matter.
    8
    MR. HARRINGTON: Thank you. Going back to
    9 the coal sampling, we touched on this earlier, but I do
    10 have some additional questions.
    11
    HEARING OFFICER TIPSORD: Okay.
    12
    MR. HARRINGTON: Do you know what the
    13 requirements or capabilities of the analytical
    14 laboratories would be to conduct accurate mercury
    15 analysis on coal?
    16
    MR. ROMAINE: As the question has been
    17 phrased, no. It's our belief that there are laboratories
    18 available that can conduct appropriate evaluations for
    19 the mercury content of coal. Analysis of the composition
    20 of coal is frequently done. The USGS and the Illinois
    21 State Geological Survey routinely conduct analyses for
    22 mercury content of coal. We are not concerned about the
    23 inability of laboratories to conduct analyses for the
    24 mercury content of coal.
    Keefe Reporting Company
    227

    1
    MR. HARRINGTON: Are you aware of how many
    2 laboratories in Illinois would be certified to conduct
    3 such analyses?
    4
    MR. ROMAINE: I'm not aware of that, no.
    5
    MR. HARRINGTON: Are you aware of -- Can you
    6 identify any public laboratories that are certified to
    7 conduct such analyses?
    8
    MR. ROMAINE: There may be Agency staff that
    9 can do that. I can't do that.
    10
    MR. HARRINGTON: And if there is such an
    11 answer, we'd appreciate receiving it maybe later in the
    12 proceedings. Do you know what the cost per sample for
    13 mercury analysis of coal is?
    14
    MR. ROMAINE: Based on our investigations,
    15 we've come up with a typical value or cost of $70 per
    16 sample.
    17
    MR. HARRINGTON: Was that through surveying
    18 laboratories in Illinois?
    19
    MR. ROMAINE: That was from discussions with
    20 one particular laboratory, and I think we also contacted
    21 or found a very useful reference, was Dennis Laudal at
    22 the University of North Dakota, who has done a lot of
    23 work in measurement of mercury emissions and analysis of
    24 coal.
    Keefe Reporting Company
    228

    1
    MR. HARRINGTON: Has the IEPA considered the
    2 number of redundant and/or duplicate samples necessary to
    3 ensure the reliability of the results?
    4
    MR. ROMAINE: Only in a broad sense.
    5 Because this rule would have an annual compliance time
    6 period, we are requiring as proposed that there be 365
    7 samples of coal for mercury. We believe that's an
    8 adequate number of samples to get reliable data.
    9
    MR. HARRINGTON: And the duplicate samples
    10 would not be required?
    11
    MR. ROMAINE: We have not specified
    12 requirements for duplicate samples. Obviously, if a
    13 source elects to take additional samples to improve what
    14 it believes is the reliability or accuracy of the mercury
    15 content of the coal supply, nothing in the rule would
    16 preclude that.
    17
    MR. HARRINGTON: Do you know what the
    18 turnaround time for analysis of coal is --
    19
    MR. ROMAINE: No, I don't.
    20
    MR. HARRINGTON: -- for mercury? And do you
    21 know what the expected range of concentrations of mercury
    22 in coal would be both for Illinois coal and for Powder
    23 River Basin coal?
    24
    MR. ROMAINE: I don't have that off the top
    Keefe Reporting Company
    229

    1 of my head. We had information, I believe, in the record
    2 that discusses the mercury content for Illinois coal and
    3 the mercury content for Powder River Basin coal.
    4
    MR. HARRINGTON: Call your attention to
    5 Table 8.5 on page 153 of the Technical Support Document.
    6 Are you familiar with this table?
    7
    MR. ROMAINE: Yes, I am.
    8
    MR. HARRINGTON: Does anyone on the panel
    9 know who prepared it?
    10
    MR. ROSS: I believe Dr. Staudt prepared
    11 this table.
    12
    MR. HARRINGTON: So that would be
    13 appropriate to ask questions of him about the table?
    14
    MR. ROSS: Yes.
    15
    MR. HARRINGTON: Okay. We'll reserve those
    16 questions.
    17
    HEARING OFFICER TIPSORD: Are we ready for
    18 question 69, then?
    19
    MR. HARRINGTON: Yes, we are. I am.
    20
    MR. ZABEL: Madam Hearing Officer?
    21
    HEARING OFFICER TIPSORD: Yes, Mr. Zabel?
    22
    MR. ZABEL: We've had some questions on the
    23 coal sampling provision of the rule. We had an issue
    24 concerning my use of a construction permit that's been
    Keefe Reporting Company
    230

    1 issued by the Agency this morning. I would like to
    2 follow up with Mr. Romaine on that at this point, but I
    3 don't want to do that without possibly addressing the
    4 concern you raised.
    5
    HEARING OFFICER TIPSORD: Well, I just
    6 caution you that if it is a permit that may be appealed
    7 to the Pollution Control Board, any issues that -- I
    8 mean, you risk the possibility of putting forth something
    9 that might cause the board members to recuse themselves
    10 from hearing it. You know, I just --
    11
    MR. ZABEL: I'd like to address that just to
    12 be sure that our view of that is clear on the record,
    13 because I don't think it would require any recusal at
    14 all. This is a public record under oath, which the Board
    15 can take notice of its own records.
    16
    HEARING OFFICER TIPSORD: I understand that.
    17 I just know that I have recently been involved in a
    18 rulemaking where the questioning became -- and that's why
    19 I said I know you're aware of this, but where I had to
    20 caution participants many, many times about getting into
    21 details that were not a part of the public record or part
    22 of -- so it's just a cautionary statement.
    23
    MR. ZABEL: We'll say on the record and it's
    24 always been my view in board proceedings that they can
    Keefe Reporting Company
    231

    1 take judicial notice of their own records, particularly
    2 matters that are under oath in public.
    3
    HEARING OFFICER TIPSORD: And that's fine.
    4 I just wanted to give you the cautionary language. I --
    5
    MR. ZABEL: I appreciate it.
    6
    Mr. Romaine, are you familiar with a permit
    7 issued to the Vermilion Power Station May 30, 2006?
    8
    MR. ROMAINE: Yes, I am. I happen to have a
    9 copy of it in front of me.
    10
    MR. ZABEL: Good. I won't have to give you
    11 one. Would you turn to Section 1.9-1 of that permit?
    12
    HEARING OFFICER TIPSORD: I will mark this
    13 as Exhibit No. 37 if there's no objection. Seeing none,
    14 this will be Exhibit No. 37.
    15
    MR. ZABEL: Can you describe the permit for
    16 me, Mr. Romaine?
    17
    MR. ROMAINE: This is a construction permit
    18 that addresses a supplemental environmental project that
    19 Dynegy is undertaking at its Vermilion power plant
    20 pursuant to a consent decree entered into with USEPA and
    21 other parties.
    22
    MR. ZABEL: And what equipment is going to
    23 be installed under this permit?
    24
    MR. ROMAINE: This permit authorizes the
    Keefe Reporting Company
    232

    1 construction of a baghouse and an activated carbon
    2 injection system.
    3
    MR. ZABEL: And on -- in the section to
    4 which I referred you, which is page 7 -- well, before
    5 that. Strike that. I think you indicated in answer to a
    6 question by Mr. Harrington that the Agency thought 365
    7 samples are enough to determine mercury input, it would
    8 be, I assume; is that correct?
    9
    MR. ROMAINE: That is correct in the context
    10 of the proposed rule.
    11
    MR. ZABEL: And this permit in question was
    12 not issued in the context of the proposed rule. I
    13 believe you testified earlier because it's proposed, you
    14 would not use it in construction permits; is that
    15 correct?
    16
    MR. ROMAINE: That's correct.
    17
    MR. ZABEL: In Section 1.9-1, the Agency has
    18 asked for ASTM testing of mercury sampling and analysis;
    19 is that correct?
    20
    MR. ROMAINE: That's partially correct.
    21
    MR. ZABEL: Please explain.
    22
    MR. ROMAINE: The actual permit provision
    23 says this sampling and analysis -- and I corrected a
    24 typo, omitted the "and" -- but this sampling and analysis
    Keefe Reporting Company
    233

    1 shall be conducted using appropriate ASTM methods or
    2 other methods approved or endorsed by USEPA.
    3
    MR. ZABEL: Is one grab sample per day an
    4 ASTM method for determining mercury in coal?
    5
    MR. ROMAINE: The purpose of this permit was
    6 not to obtain a representative value for the mercury
    7 content of coal on a daily basis. All this permit
    8 condition requires is that Dynegy obtain representative
    9 data for the mercury content of coal that it can
    10 correlate with the emission data that it collects for
    11 mercury emissions from the facility when using the new
    12 control system. So the requirements to conduct sampling
    13 of coal to determine a representative value for a short
    14 potentially three-hour, six-hour emission test are very
    15 different than the requirements like in a representative
    16 sample -- samples of coal to determine a value for
    17 mercury content over the course of a year when a unit is
    18 equipped with a continuous emission monitor.
    19
    MR. ZABEL: This testing requirement,
    20 captioned as a record-keeping requirement, would only be
    21 for purposes of that confirmatory testing?
    22
    MR. ROMAINE: Excuse me?
    23
    MR. ZABEL: Well, you said it's to verify
    24 for a short-term time period; is that correct?
    Keefe Reporting Company
    234

    1
    MR. ROMAINE: What I said was it -- What I
    2 said was the purpose of the requirement is for Dynegy to
    3 have data for the mercury content of its coal that it
    4 could correlate with the emission data. This system
    5 pursuant to the consent decree is required to have 90
    6 percent removal or to be designed to achieve 90 percent
    7 removal of mercury. To determine 90 percent removal of
    8 the mercury requires that there be data for both the
    9 amount of mercury going into the unit and the amount of
    10 mercury coming out of the unit. The consent decree does
    11 not include requirements for continuous emission
    12 monitoring. Therefore, the general presumption of this
    13 permit is that on some basis, as agreed to pursuant to
    14 the consent decree and in discussions with USEPA and
    15 other parties, there will be a schedule for conducting
    16 specific emissions testing of the unit, and all the
    17 permit condition requires is that in conjunction with
    18 that testing there also be data for the mercury content
    19 of the coal supply into the boiler.
    20
    MR. ZABEL: And your understanding is that
    21 correlation of the emission testing would be over a
    22 shorter time period than a 12-month rolling calendar.
    23
    MR. ROMAINE: My expectation is that would
    24 be over a far shorter period of time.
    Keefe Reporting Company
    235

    1
    MR. ZABEL: And then it would be your --
    2 would it be your view, Mr. Romaine, that this provision
    3 would be unnecessary under the present rule? Under the
    4 proposed rule. Sorry.
    5
    MR. ROMAINE: The provision in this permit
    6 would not need to be applied generally under the proposed
    7 rule. It could still be applicable to Dynegy because one
    8 of the curious features of the consent decree is it's
    9 silent on the compliance time period associated with the
    10 90 percent removal requirement for this proposed
    11 supplementary environmental control project.
    12
    MR. ZABEL: But to make it easy, assume I'm
    13 asking the question for my other client, Midwest
    14 Generation, which has no consent decree.
    15
    MR. ROMAINE: In terms of your other client,
    16 there would be no need to obtain mercury content for the
    17 coal to correlate with a 90 percent removal requirement
    18 at the present time.
    19
    MR. ZABEL: ASTM testing is more rigorous
    20 than a grab sample per day with 365 days; is that
    21 correct, Mr. Romaine?
    22
    MR. ROMAINE: I'm not sure it is. I think
    23 they're -- I'm not familiar with the exact wording of the
    24 ASTM method, but the ASTM method seems to allow some
    Keefe Reporting Company
    236

    1 flexibility in the rigor with which samples are collected
    2 depending on the purpose of the sampling. Certainly if
    3 the purpose of the sampling was to determine the heat
    4 content of a coal supply on a daily basis for contractual
    5 purposes, it would require more than a single grab
    6 sample. In terms of conducting sampling and analysis to
    7 correlate with an emission test, it's possible that the
    8 ASTM methods would in fact allow a single sample or a
    9 very small number of grab samples to be taken to be
    10 correlated with an emission test.
    11
    MR. ZABEL: And for mercury, you don't -- do
    12 you know what the sampling requirement is in the ASTM
    13 standards?
    14
    MR. ROMAINE: I'm not familiar with the
    15 details of the standard, no.
    16
    MR. ZABEL: Do you know what the variability
    17 of mercury is in coal?
    18
    MR. ROMAINE: I am familiar with data that
    19 shows the variability of mercury in coal as sampled. I
    20 don't know anything beyond that.
    21
    HEARING OFFICER TIPSORD: I think we're
    22 ready for question 69, then. Question 69.
    23
    MR. KALEEL: Number 69, "Please describe
    24 what other Illinois rulemakings are expected to impose
    Keefe Reporting Company
    237

    1 requirements on EGUs in Illinois." There are a number of
    2 federal requirements related to the eight-hour ozone
    3 ambient air quality standard, to the fine particle or
    4 PM2.5 ambient air quality standard and to USEPA's regional
    5 haze program that may affect EGUs. A list of some of
    6 these are the CAIR rule, the Clean Air Interstate Rule;
    7 NOx and SO2 RACT; requirements for best available
    8 retrofit technology, or BART; and any other requirements
    9 that the State determines are necessary to allow us to
    10 demonstrate attainment of the air quality standards. It
    11 should be noted that the Agency has not proposed any
    12 rules on any of these requirements thus far with the
    13 exception of the requirement for CAIR.
    14
    HEARING OFFICER TIPSORD: And I believe that
    15 also answers question 70. Mr. Harrington, do you have a
    16 follow-up?
    17
    MR. HARRINGTON: Has the Agency been
    18 considering what will be necessary for attainment of the
    19 PM2.5 refined particulate standards in Chicago and East
    20 St. Louis?
    21
    MR. KALEEL: Yes, we have.
    22
    MR. HARRINGTON: Have you been a part of the
    23 LADCO consideration of something that's called EGU1 and
    24 EGU2; in other words, controls beyond CAIR for NOx and
    Keefe Reporting Company
    238

    1 SOx?
    2
    MR. KALEEL: There are a couple of different
    3 control strategy options that are commonly called the
    4 EGU1 and EGU2, and these are a result of a LADCO
    5 contractual effort, what they call development of their
    6 white papers, which are a range of potential control
    7 options for reaching the eight-hour ozone and PM2.5
    8 standards.
    9
    HEARING OFFICER TIPSORD: Mr. Harrington,
    10 with all due respect, you have several questions about
    11 PM2.5, SOx and NOx as we move on.
    12
    MR. HARRINGTON: Yes. I was --
    13
    HEARING OFFICER TIPSORD: Okay.
    14
    MR. MATOESIAN: The Agency would submit that
    15 these questions are out of the scope of the rulemaking.
    16 The CAIR --
    17
    HEARING OFFICER TIPSORD: We can't -- You're
    18 going to need a microphone.
    19
    MR. MATOESIAN: The Agency would submit that
    20 these questions are out of the scope of the rulemaking.
    21 The CAIR rulemaking I believe hasn't even been submitted
    22 to the Board yet.
    23
    HEARING OFFICER TIPSORD: The CAIR rule has
    24 been submitted to the Board.
    Keefe Reporting Company
    239

    1
    MR. MATOESIAN: It must have been recent.
    2 But this has nothing to do with the mercury rule and this
    3 is a completely different rulemaking. Even if there's,
    4 you know, the same sources dependent on different rules,
    5 that's common. So we would say questions 71 through 78
    6 are all out of scope.
    7
    HEARING OFFICER TIPSORD: Mr. Harrington?
    8
    MR. HARRINGTON: May I respond?
    9
    HEARING OFFICER TIPSORD: Uh-huh.
    10
    MR. HARRINGTON: I think it's quite clear
    11 that any rational company is going to have to look at all
    12 the requirements that are being imposed on it either by
    13 known rules or those being developed in planning for
    14 compliance and that we can state now but then our
    15 testimony will develop it further that the selection of
    16 one set of controls for mercury might preclude another
    17 set of controls for NOx or SOx. There has to be some
    18 consideration as we move forward through all these
    19 rulemakings of how they interrelate in terms of what are
    20 the appropriate controls that companies will need to
    21 install and on what schedule. It's well known that in --
    22 the federal CAMR rule was largely based on the fact that
    23 the CAIR rule would require significant mercury reduction
    24 considered as a co-benefit. To exclude the consideration
    Keefe Reporting Company
    240

    1 of multi-pollutant issues here I think would fly in the
    2 face of reality and the entire history of development of
    3 controls. Others may have their own viewpoint on this.
    4
    HEARING OFFICER TIPSORD: Mr. Forcade?
    5
    MR. FORCADE: I believe there's prior
    6 Illinois case law holding that a regulatory proceeding
    7 that fails to address impacts of contemporaneous other
    8 regulatory proceedings may be subject to challenge, and I
    9 believe it's the State Chamber of Commerce, but I'll
    10 look. I think it was particulate and SO2 regulations
    11 that the Board adopted.
    12
    HEARING OFFICER TIPSORD: Mr. Zabel?
    13
    MR. ZABEL: Just supplemental on what
    14 Mr. Forcade said, I believe the original appeal of the
    15 state implementation plan which went to the Illinois
    16 Supreme Court considered that very fact. It was the
    17 interplay of particulates and sulfur standards. But more
    18 significantly and maybe more on point, Table 8.10 of the
    19 Agency's TSD talks about co-benefits. Co-benefits is a
    20 subject of, as I think Mr. Harrington described it, the
    21 interplay of multiple regulations, in this case the
    22 regulations for CAIR and for mercury, and because we are
    23 comparing a great deal of this to CAMR, which relied
    24 heavily on CAIR benefits -- on co-benefits -- excuse
    Keefe Reporting Company
    241

    1 me -- I think it's most relevant. I mean, I have to
    2 agree with Mr. Harrington.
    3
    HEARING OFFICER TIPSORD: Mr. Matoesian?
    4
    MR. MATOESIAN: It's true there may be
    5 co-benefits. We are not against these co-benefits, and
    6 to whatever extent they can achieve co-benefits, that's
    7 fine. Particularly as to the CAIR rule, they just really
    8 aren't at issue here and shouldn't be delved into during
    9 this rulemaking. If they would like to create a
    10 pollution control strategy that makes a maximum use of
    11 co-benefits, that's fine. The mercury rule as we propose
    12 is not against that, and to my knowledge the CAIR rule is
    13 not against that, but the mere fact that they can achieve
    14 co-benefits does not mean that the CAIR rule should be
    15 open to debate at this point.
    16
    MR. HARRINGTON: I think in terms of the
    17 economic reasonableness, the technical feasibility of the
    18 rule, it has to be taken into account as to what other
    19 requirements must be met by these same facilities. For
    20 example -- and I'm -- this is positing one that I don't
    21 think will be in evidence, but it's simple. If the two
    22 were inconsistent technologically, one could not be
    23 achieved without the other, then certainly the Agency --
    24 Board would have to take that into account. In this case
    Keefe Reporting Company
    242

    1 they may not be consistent but they may be intermeshed
    2 regardless of how the Board rules on the Agency's
    3 proposed CAIR rule, and that's not an issue we're trying
    4 to argue in this case. Obviously it's not, and the
    5 Agency has made certain statements there as to what they
    6 want to achieve. There is a federal requirement that's
    7 out there we know we have to meet. There's a federal
    8 requirement out there for the PM2.5 SIP we know we have to
    9 meet. In considering these, the Board to have this
    10 information in front of them in the course of this
    11 rulemaking, I think it is not only desirable, but
    12 necessary to avoid any potential legal problem.
    13
    HEARING OFFICER TIPSORD: Okay. Here's what
    14 I'm going to do. I must admit that when I read these
    15 questions, my note right here says, "why relevant here."
    16 However, I am persuaded to some extent by the arguments
    17 I've heard. What I'm going to ask is that you allow me
    18 to check and read the State Chamber case, the -- tonight,
    19 and since obviously we're not going to get through with
    20 Ameren's questions, let's table these questions until
    21 tomorrow, if that's all right with all of you, and let me
    22 check the case law, and then I'll make a ruling tomorrow
    23 on the relevancy. Mr. Zabel?
    24
    MR. ZABEL: I think the earlier case I
    Keefe Reporting Company
    243

    1 referred to may be referenced as Commonwealth Edison
    2 versus the Illinois EPA or the Pollution Control Board.
    3 I've forgotten exactly what --
    4
    HEARING OFFICER TIPSORD: I'm sure that
    5 Kathleen Crowley's institutional memory will help me --
    6
    MR. ZABEL: I'm sure she will, yes.
    7
    HEARING OFFICER TIPSORD: -- to a large
    8 extent.
    9
    MR. ZABEL: We can stipulate to that, Madam
    10 Hearing Officer.
    11
    HEARING OFFICER TIPSORD: But I will check,
    12 or if you can give me the specific cite, I would like to
    13 read those cases.
    14
    MR. ZABEL: I don't have it with me.
    15
    MR. BONEBRAKE: And what specific questions,
    16 then, will be --
    17
    HEARING OFFICER TIPSORD: Question 71
    18 through 78 I'm going to reserve ruling on.
    19
    MR. ROSS: And that takes us to 79? I was
    20 actually home free until 79.
    21
    HEARING OFFICER TIPSORD: Darn.
    22
    MR. ROSS: Exactly my sentiments. 79, "Is
    23 there not a significant overlap between technologies
    24 which might achieve compliance with new nitrogen oxide
    Keefe Reporting Company
    244

    1 and sulfur dioxide regulations and those which may be
    2 required for mercury control?" Yes, there is a
    3 significant overlap. It has been shown that FGD, SCR,
    4 fabric filters, ESP and other pollution control
    5 technologies are effective to provide some level of
    6 co-benefit for control of mercury emissions. However,
    7 mercury-specific controls such as ACI and halogenated ACI
    8 are, as the term implies, specific to mercury.
    9
    Question 80, "Is it not logical that these
    10 various requirements be harmonized both in terms of
    11 emission limitations and scheduling?" Yes, to some
    12 degree. However, it is not appropriate to postpone
    13 mercury control beyond July 1 of 2009 in the opinion of
    14 the Agency.
    15
    Question 81, "Has Illinois EPA taken any
    16 consideration of the total economic impact of these
    17 multi-pollutant controls on Illinois power plants?" And
    18 yes, EPA has modeled the impacts of both the proposed
    19 mercury rule and the proposed CAIR rule, and economic
    20 modeling was performed in order to determine conservative
    21 estimates for costs with respect to the proposed CAIR
    22 rule and the proposed Illinois mercury rule.
    23
    HEARING OFFICER TIPSORD: Mr. Rieser?
    24
    MR. RIESER: And I'm sorry for being slow.
    Keefe Reporting Company
    245

    1 I know Mr. Kim -- I'm sorry. I'm sorry for being slow.
    2 I know Mr. Kim has a wonderful technical term for this
    3 late afternoon forgetfulness, but -- which I forgot, of
    4 course. But I think you said a couple of questions ago
    5 that it was the Agency's opinion that the rule not be
    6 delayed beyond -- control, I should say, not be delayed
    7 beyond July 1, 2009, and I suspect the answer is that
    8 we've talked about this extensively between Dr. Keeler
    9 and Ms. Willhite, but has the Agency quantified what the
    10 difference would be between controls in 2009 and controls
    11 in 2010 or controls in 2012?
    12
    MR. ROSS: Well, in comparison to the
    13 federal mercury rule, we have quantified them to some
    14 degree. Not the deposition per se, but the required
    15 reductions have obviously been quantified in that
    16 Illinois' rule requires a 90 percent reduction in mercury
    17 by July 1, 2009. The federal CAMR cap is equivalent to
    18 around a 47 percent reduction in mercury emissions by
    19 2010.
    20
    MR. RIESER: How about with regard to the
    21 deposition?
    22
    MR. ROSS: No, we have not --
    23
    MR. RIESER: Thank you.
    24
    MR. ROSS: -- made any quantification of
    Keefe Reporting Company
    246

    1 that.
    2
    82, "Were not the federal CAMR regulations based
    3 on a desire to harmonize the controls of SO2 and NOx with
    4 those of mercury?" Yes, they were.
    5
    HEARING OFFICER TIPSORD: Ms. Bassi?
    6
    MS. BASSI: I'm sorry. You were too quick
    7 on the draw there. In question 81 you said that the
    8 Agency performed modeling or contracted to have modeling
    9 done to look at the total economic impact of the
    10 multi-pollutant controls on Illinois power plants. Was
    11 that the IPM modeling?
    12
    MR. ROSS: Yes. We did modeling for the
    13 proposed Illinois mercury rule and we did separate
    14 modeling for the proposed Illinois CAIR rule.
    15
    MS. BASSI: Oh, separate.
    16
    MR. ROSS: And that's addressed in the CAIR
    17 Technical Support Document.
    18
    MS. BASSI: But the only -- is it correct
    19 that the only modeling that was performed for the mercury
    20 rule was the modeling performed by ICF?
    21
    MR. ROSS: Yes, that is correct.
    22
    MS. BASSI: Okay. Thank you.
    23
    HEARING OFFICER TIPSORD: Number 83?
    24
    MR. ROSS: 83, "For example, are there not
    Keefe Reporting Company
    247

    1 significant mercury reduction benefits in the
    2 installation of wet flue gas desulfurization preceded by
    3 selective catalytic reduction on mercury for facilities
    4 burning bituminous coal, such as produced in Illinois?"
    5 And yes, we agree with this assessment that a combination
    6 of FGD, SCR and PM control is very effective in reducing
    7 mercury emissions.
    8
    Question 84, "If a facility installs halogenated
    9 powdered activated carbon injection with a baghouse for
    10 mercury control to comply with Illinois EPA's mercury
    11 proposal, would that not be inconsistent with burning
    12 Illinois bituminous coal in the future because the
    13 facilities would use dry scrubbing with the baghouse to
    14 achieve SO2 reductions?" And the answer is perhaps, but
    15 that is just one of many compliance options. We have not
    16 specifically evaluated the impact to Illinois coal from
    17 this scenario.
    18
    HEARING OFFICER TIPSORD: Mr. Zabel?
    19
    MR. ZABEL: To your knowledge, Mr. Ross, on
    20 what basis does the source size a baghouse? What are
    21 the -- and strike that. Let me make -- Do you know what
    22 the critical parameters are in sizing a baghouse?
    23
    MR. ROSS: That would probably be a question
    24 best answered by Dr. Staudt, and in fact, in discussions
    Keefe Reporting Company
    248

    1 with him, he has asked that further questions on this be
    2 referred to him.
    3
    MR. ZABEL: So we'll save that for
    4 Dr. Staudt?
    5
    MR. ROSS: Yes. Ideally, yes.
    6
    MR. ZABEL: Okay.
    7
    MR. ROSS: 85, "If, as the companies have
    8 suggested, the Illinois mercury proposal would require
    9 installation of baghouses on virtually all the facilities
    10 presently burning sub-bituminous coal, would that not
    11 effectively discourage any use of Illinois coal in the
    12 future by making the investments substantially obsolete
    13 if a facility was to switch to Illinois coal?" And not
    14 necessarily. I believe we need more information on the
    15 particular limitations on dry scrubbing for SO2 control.
    16 As I previously mentioned, we have not specifically
    17 researched this scenario. To some degree it may be that
    18 that is the case. This is a constructive line of
    19 questioning. I would like to add, I think the desire
    20 would have been that this would have been brought up in
    21 the stakeholder meetings, but we need to research that
    22 more and be provided additional information on that in
    23 order to provide an answer, but Dr. Staudt is aware of
    24 this question and he hopefully will be able to address it
    Keefe Reporting Company
    249

    1 further when he is here.
    2
    86, "If multi-pollutant averaging is allowed, why
    3 not allow averaging between companies?" This was
    4 discussed and considered to be problematic in that it
    5 would be a significant administrative burden. Compliance
    6 liability issues would also arise if averaging provisions
    7 were violated, and the Agency recognizes that there is a
    8 limited incentive for different companies to average.
    9 Also, this possibility was not raised as a desirable
    10 option in any of the stakeholder meetings or comments, so
    11 we did not address it in detail at that time.
    12
    HEARING OFFICER TIPSORD: I would note that
    13 it's multi-plant, not multi-pollutant.
    14
    MR. ROSS: Excuse me.
    15
    HEARING OFFICER TIPSORD: Question 87?
    16
    MR. ROMAINE: "With respect to the averaging
    17 demonstration as discussed at pages 7 and 8 of
    18 Mr. Romaine's testimony, has the Illinois EPA made any
    19 internal estimates of which facilities would comply for
    20 the 75 percent minimum reduction by plant or which units,
    21 if any, would not have to install controls?" We have not
    22 conducted that evaluation. This is an option that is
    23 provided in the rule of flexibility, but we don't know
    24 which facilities would elect to rely upon this.
    Keefe Reporting Company
    250

    1
    HEARING OFFICER TIPSORD: Mr. Zabel?
    2
    MR. ZABEL: Just to my understanding, that
    3 question at the end says "would not have to install
    4 controls." My understanding of the rule -- and correct
    5 me if this is in error, Mr. Romaine -- all units would
    6 have to install some controls; is that correct?
    7
    MR. ROMAINE: That is our expectation, yes.
    8
    MR. ZABEL: Even in Phase I.
    9
    MR. ROMAINE: Yes.
    10
    MR. ROSS: Except for those units who
    11 already have adequate control configurations where they
    12 can meet the --
    13
    MR. ZABEL: Some may already meet 75 percent
    14 or even 90 and be averaged?
    15
    MR. ROSS: Yes, that is our belief.
    16
    MR. ZABEL: Okay.
    17
    MR. ROMAINE: And then the other exception
    18 would be units that avail themselves of provisions for
    19 shutdown units.
    20
    HEARING OFFICER TIPSORD: Question 88.
    21
    MR. ROSS: 88, "Since at best technology
    22 proposed by Illinois EPA witnesses will barely exceed" --
    23
    MR. HARRINGTON: Excuse me. May I go back?
    24
    HEARING OFFICER TIPSORD: Sure. Of course,
    Keefe Reporting Company
    251

    1 Mr. Harrington.
    2
    MR. HARRINGTON: I call your attention to
    3 the sentence at the bottom of page 7 of your testimony,
    4 and --
    5
    MR. ROSS: Whose testimony?
    6
    HEARING OFFICER TIPSORD: Mr. Romaine's.
    7
    MR. HARRINGTON: Mr. -- The amended
    8 testimony of Christopher Romaine that you just passed
    9 out. The statement is, quote, "This requirement assures
    10 that technology for control of mercury emissions is
    11 utilized on each source, comma, and most likely each
    12 unit, comma, that is covered by a multi-source compliance
    13 demonstration," end of quote. Could you explain what
    14 that sentence means, particularly with -- particularly
    15 the language "and most likely each unit"?
    16
    MR. ROMAINE: I believe my testimony was
    17 simply being cautious that there could be some very
    18 atypical set of circumstances where there might be some
    19 particular plant where it's conceivable that one unit
    20 might escape an obligation to have control given the
    21 controls that are being installed on the other units at
    22 that plant. The other way to express it is that what we
    23 were most concerned about in terms of crafting the rule
    24 was to make sure that controls were applied at each
    Keefe Reporting Company
    252

    1 plant. We were not as concerned about assuring that
    2 controls were installed at each unit of a plant, even
    3 though that was expected to be done.
    4
    MR. HARRINGTON: Perhaps for the record it
    5 would be useful if you would explain what you mean by the
    6 difference between units and plants. I think most of us
    7 understand that, but the record may not be entirely
    8 clear.
    9
    MR. ROMAINE: When I use the term unit and
    10 as the rule uses the term unit, it refers to an
    11 individual generating unit that is made up of a boiler or
    12 a pair of boilers and the associated electrical
    13 generator. Most of the coal-fired power plants in
    14 Illinois have more than one generating unit, and it would
    15 be simplest to look at the exceptions where there is only
    16 one generating unit at a plant, and I don't want to do
    17 this, but an example of a facility that only has one
    18 generating unit would be Ameren's Duck Creek plant, which
    19 has a single boiler and a single electrical generator.
    20 An example of a facility that has two units would be
    21 Midwest Generation's Crawford station, which has two
    22 boilers and two generating units.
    23
    MR. HARRINGTON: Thank you, just for the
    24 record, so it's more clear. Otherwise it took me a while
    Keefe Reporting Company
    253

    1 to figure out all these terms.
    2
    HEARING OFFICER TIPSORD: Thank you,
    3 Mr. Harrington. Are we ready, then, for question 88?
    4
    MR. ROSS: 88, "Since at best technology
    5 proposed by Illinois EPA witnesses will barely exceed a
    6 90 percent removal rate as described in the various
    7 studies for sub-bituminous coals, which units would be
    8 available, if any, to avoid installing controls during
    9 Phase I of the rule since there would not be excess
    10 reductions from other units?" And it is reasonable to
    11 expect that all units will require some degree of mercury
    12 control, and the Agency estimated costs based on this
    13 premise. However, all units are not required to install
    14 mercury controls and it may be possible for some smaller
    15 units to avoid mercury controls. One such scenario where
    16 this is potentially possible would be in the case where
    17 one or more larger units obtain mercury controls well in
    18 excess of 90 percent and a smaller unit within the
    19 averaging scheme emits less mercury through a reduction
    20 in operating hours. Again, how compliance is achieved
    21 will be up to the facilities, and the short answer to the
    22 question is that it is reasonable to expect that all
    23 units firing sub-bituminous coal will require some degree
    24 of mercury control.
    Keefe Reporting Company
    254

    1
    HEARING OFFICER TIPSORD: Having reached the
    2 hour of five o'clock, we'll go ahead and wrap up today,
    3 but -- here's the big but -- given the concern that if we
    4 have -- if we're not done with the Agency by Friday and
    5 it's been expressed that next week is not necessarily
    6 feasible for a lot of people, we will start going later
    7 than five o'clock tomorrow night, and we'll see how it
    8 goes. We'll try -- We'll see six tomorrow and see where
    9 we're at and --
    10
    BOARD MEMBER MOORE: Seven.
    11
    HEARING OFFICER TIPSORD: -- seven possibly,
    12 but it's going to also depend upon how we're all holding
    13 up as well. I mean, obviously if we're all at each
    14 other's throats at six o'clock tomorrow night, then we'll
    15 go home, but we're going to try and -- we'll extend the
    16 days to try and wrap up by Friday. Mr. Zabel?
    17
    MR. ZABEL: I would just note, Madam Hearing
    18 Officer, that several -- I think most of us have a
    19 commitment tomorrow night at 6:30.
    20
    HEARING OFFICER TIPSORD: Okay. Then we
    21 will wrap up tomorrow at six.
    22
    MR. ZABEL: Thank you.
    23
    HEARING OFFICER TIPSORD: Okay. Then let's
    24 go home and get a good night's rest.
    Keefe Reporting Company
    255

    1
    (Hearing recessed at 5:01 p.m.)
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company
    256

    1 STATE OF ILLINOIS )
    ) SS
    2 COUNTY OF BOND
    )
    3
    4
    I, KAREN WAUGH, a Notary Public and Certified
    5 Shorthand Reporter in and for the County of Bond, State
    6 of Illinois, DO HEREBY CERTIFY that I was present at
    7 Illinois Pollution Control Board, Springfield, Illinois,
    8 on June 19, 2006, and did record the aforesaid Hearing;
    9 that same was taken down in shorthand by me and
    10 afterwards transcribed, and that the above and foregoing
    11 is a true and correct transcript of said Hearing.
    12
    IN WITNESS WHEREOF I have hereunto set my hand
    13 and affixed my Notarial Seal this 23rd day of June, 2006.
    14
    15
    16
    __________________________
    17
    Notary Public--CSR
    18
    #084-003688
    19
    20
    21
    22
    23
    24
    Keefe Reporting Company
    257

    Back to top