ILLINOIS POLLUTION CONTROL BOARD
    April 3, 1997
    CITY OF KEWANEE,
    Petitioner,
    v.
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    )
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 97-171
    (Provisional Variance - Water)
    ORDER OF THE BOARD (by C.A. Manning):
    Pursuant to Section 35(b) of the Environmental Protection Act (Act) (415 ILCS
    5/35(b)), the City of Kewanee (petitioner) has requested that the Illinois Environmental
    Protection Agency (Agency) recommend that the Board grant a provisional variance from
    Section 35(b) of the Act (415 ILCS 5/35(b)), to the petitioner. Such request for a provisional
    variance and the notification of recommendation were filed with the Board by the Agency on
    Tuesday, April 1, 1997. Pursuant to Section 35(b) of the Act, the Board must issue the
    variance within two (2) days of this filing.
    Pursuant to Section 35(b) of Act (415 ILCS 5/35(b)), the Agency, by and through its
    Director, Mary A. Gade, seeks a provisional variance to allow petitioner to continue to operate
    its wastewater treatment facility while repairs are made to a ruptured berm in the excess
    holding lagoon.
    Specifically, the Agency recommends that we grant petitioner a 45-day provisional
    variance for its Henry County facility from the sampling requirements, as set forth in 35 Ill.
    Adm. Code 305.102(b) and 309.146(a)(4) and the NPDES effluent discharge requirements, as
    set forth in 304.141(b). This variance period shall commence during the first excess flow
    discharge event through Outfall 003 due to the rupture of the berm and continue until the
    construction of the 16 MG excess flow equalization lagoon is complete, but not longer than 45
    days.
    The Agency recommends that the Board grant the requested provisional variance with
    specified conditions. The Agency agrees that the repairs are necessary and anticipates that the
    requested provisional variance would have minimal environmental impact on the receiving
    stream. The Agency is unaware of any public water supplies that the requested provisional
    variance would adversely impact and maintains that granting a provisional variance would
    violate no federal laws. The Agency believes that a denial of the requested provisional
    variance would create an arbitrary or unreasonable hardship on the petitioner.

    2
    Provisional variances are by their very nature temporary. The responsibilities of the
    Agency and the Board in these short-term provisional variances are different from the
    responsibilities in standard variances. (See 415 ILCS 5/35(b) & 36(c).) In provisional
    variances it is the responsibility of the Agency to make the technical determinations and
    finding of arbitrary or unreasonable hardship. The Board’s responsibility is to adopt a formal
    order, to assure the formal maintenance of the record, to assure the enforceability of the
    variance, and to provide notification of the action by a press release.
    Having received the Agency recommendation that a denial of the requested relief would
    impose an arbitrary or unreasonable hardship, the Board hereby grants the petitioner a
    provisional variance from 35 Ill. Adm. Code 305.102(b), 309.146(a)(4) and 304.141(b), on
    the following conditions:
    1.
    The term of this provisional variance shall commence during the first excess
    flow discharge event through Outfall 003 due to the rupture of the berm and
    continue until the construction of the 16 MG excess flow equalization lagoon is
    complete, but not longer than 45 days, whichever occurs first.
    2.
    During the variance period, sampling at Outfall 003 shall consist of a 24-hour
    composite sample to be taken for each discharge event.
    3.
    During the term of this provisional variance, petitioner shall meet all other
    conditions and limits in its National Pollutant Discharge Elimination System
    Permit No. IL0029343.
    4.
    The petitioner shall notify Todd Huson at the Agency’s Peoria Regional Office
    by telephone, when the first excess flow discharge event through Outfall 003
    occurs. Petitioner shall confirm this notice in writing within five (5) days,
    addressed as follows:
    Illinois Environmental Protection Agency
    ATTN: Erin Rednour
    Bureau of Water, Compliance Assurance Section
    2200 Churchill Road
    P.O. Box 19276
    Springfield, Illinois 62794-9276
    5.
    The petitioner shall operate its plant during the term of this provisional variance
    in a manner that assures the best effluent practicable. Additionally, petitioner
    shall perform the necessary repair work on the berm as expeditiously as possible
    to minimize the time period that the excess flow must be diverted to, and
    discharged from, Outfall 003.
    The petitioner shall execute a copy of a certificate of acceptance of this provisional
    variance and forward that copy to the Agency addressed as is the written notice required in the

    3
    above condition; the petitioner shall forward that copy within ten (10) days of the date of this
    order of the Board, and the certificate of acceptance shall take the following form:
    CERTIFICATION
    I (We), _________________________________, hereby accept
    and agree to be bound by all terms and conditions of the order of the
    Pollution Control Board in PCB 97-171, April 3, 1997.
    _______________________________________
    Petitioner
    _______________________________________
    Authorized Agent
    _______________________________________
    Title
    _______________________________________
    Date
    IT IS SO ORDERED.
    Board Member Kathleen M. Hennessey abstained.
    Section 41 of the Environmental Protection Act (415 ILCS 5/41 (1994)) provides for
    the appeal of final Board orders to the Illinois Appellate Court within 35 days of the date of
    service of this order. The Rules of the Supreme Court of Illinois establish filing requirements.
    (See also 35 Ill. Adm. Code 101.246 “Motions for Reconsideration.”)
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, hereby certify that
    the above order was adopted on the _____ day of ___________, 1997, by a vote of
    ______________.
    ___________________________________
    Dorothy M. Gunn, Clerk
    Illinois Pollution Control Board