ILLINOIS POLLUTION CONTROL BOARD
August 3, 1995
COMMONWEALTH EDISON COMPANY
)
(LASALLE COUNTY GENERATING
)
STATION),
Petitioner,
v.
)
PCB
96-25
)
(Provisional Variance—Water)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
ORDER OF THE BOARD (by C.A. Manning):
Pursuant to Section 35(b) of the Environmental Protection
Act (Act) (415 ILCS 5/35(b)), Commonwealth Edison Company
(Commonwealth Edison), on behalf of its LaSalle County generating
station, has requested that the Illinois Environmental Protection
Agency (Agency) recommend that the Board grant a provisional
variance to allow Commonwealth Edison to operate while its
request for a permit modification is being reviewed by the
Agency. Such request for a provisional variance and the
Notification of Recommendation were filed with the Board by the
Agency on Wednesday, August 2, 1995. Pursuant to Section 35(b)
of the Act, the Board must issue the variance within two (2) days
of this filing.
Pursuant to Section 35(b) of the Environmental Protection
Act (Act) (415 ILCS 5/35(b)), the Agency, by and through its
Director, Mary A. Gade, seeks a provisional variance for
Commonwealth Edison in order to allow it to operate while its
request for permit modification is under Agency review.
Specifically, the Agency recommends that we grant
Commonwealth Edison a forty-five (45)-day provisional variance
for its facility located in LaSalle County from the NPDES
effluent standards as set forth in 35 Iii. Adm. Code 304.141(b)
for the period beginning August 14, 1995 and continuing until
September 27, 1995.
The Agency recommends that the Board grant the requested
provisional variance with specified conditions. The Agency
anticipates that the requested provisional variance would have
minimal environmental impact on the receiving stream. The Agency
is unaware of any public water supplies that the requested
provisional variance would adversely impact. The Agency
maintains that a grant of a provisional variance would violate no
federal laws. The Agency finds that a denial of the requested
provisional variance would create an arbitrary or unreasonable
hardship on the petitioner.
9
Provisional variances are by their very nature temporary.
The responsibilities of the Agency and the Board in these short-
term provisional variances are different from the
responsibilities in standard variances.
(~
415 ILCS 5/35 (b) &
36(c)). In provisional variances it is the responsibility of the
Agency to make the technical determinations and finding of
arbitrary or unreasonable hardship. The Board’s responsibility
is to adopt a formal order, to assure the formal maintenance of
the record, to assure the enforceability of the variance, and to
provide notification of the action by a press release.
Having received the Agency recommendation finding that a
denial of the requested relief would impose an arbitrary or
unreasonable hardship, the Board hereby grants Commonwealth
Edison a provisional variance from 35 Ill. Adm. Code 301.141(b),
on the following conditions:
1. The variance shall commence on August 14, 1995 and
continue until September 27, 1995;
2. The provisional variance is limited to the conditions
that will be set forth in the modified permit, as described
in paragraph 10 of the Agency Recommendation;
3. During the provisional variance period, Commonwealth
Edison shall immediately inform the Agency of any adverse
circumstances that may arise which could cause public health
or environmental concerns.
Within ten (10) days of the date of this order of the Board
Commonwealth Edison shall execute a copy of a Certificate of
Acceptance of this provisional variance and forward that copy to
the Agency addressed as follows:
Illinois Environmental Protection Agency
Bureau of Water, Compliance Assurance Section
2200 Churchill Road
P.O. Box 19276
Springfield, Illinois 62794—9276
Attention: Susan Davison
The Certificate of Acceptance shall take the following form:
3
CERTIFICATION
I (We),
hereby accept and agree to be bound by all terms
and conditions of the order of the Pollution
Control Board in PCB 96-25, August 3, 1995.
Petitioner
Authorized Agent
Title
Date
IT IS SO ORDERED.
I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
Board1 do hereby certify that the above order was adopted on the
j-te~C
day of ___________________________, 1995, by a vote of
5—IJ
.
Dorothy M.//Gunn, Clerk
Illinois i~ollutionControl Board