ILLINOIS POLLUTION CONTROL BOARD
April 2, 2009
IN THE MATTER OF:
SECTION 27 PROPOSED RULES FOR
NITROGEN OXIDE (NO
x
) EMISSIONS
FROM STATIONARY RECIPROCATING
INTERNAL COMBUSTION ENGINES AND
TURBINES: AMENDMENTS TO 35 ILL.
ADM. CODE PARTS 211 AND 217
)
)
)
)
)
)
)
)
R07-19
(Rulemaking - Air)
ORDER OF THE BOARD (by A.S. Moore):
On January 10, 2008, the Board granted a motion by the Illinois Environmental
Protection Agency (Agency or Illinois EPA) to proceed with an amended proposal under the
general rulemaking provisions of Sections 27 and 28 of the Environmental Protection Act (Act)
(415 ILCS 5/27, 28 (2006)). The Agency proposes to amend Parts 211 and 217 of the Board’s
air pollution regulations (35 Ill. Adm. Code 211, 217) to control nitrogen oxides (NO
x
)
emissions. On March 19, 2009, the Agency filed a “Motion for Expedited Review” (Mot.).
Below, the Board summarizes that motion before deciding it.
SUMMARY OF MOTION TO EXPEDITE
On January 10, 2008, the Board granted a motion by the Illinois Environmental
Protection Agency (Agency) to proceed with an amended proposal in this rulemaking docket.
Generally, the Agency proposes to amend Parts 211 and 217 of the Board’s air pollution
regulations (35 Ill. Adm. Code 211, 217) to control nitrogen oxides (NO
x
) emissions from
internal combustion engines and turbines. The Board has held two hearings on this proposal:
the first on April 9, 2008, in Edwardsville; and the second on May 7, 2008, in Chicago. Mot. at
1 (¶1). First-notice publication occurred on October 31, 2008.
Id
., citing 32 Ill. Reg. 17035
(Oct. 31, 2008).
The Agency states that Section 110 of the Clean Air Act (CAA) requires states to submit
to the United States Environmental Protection Agency (USEPA) for its approval state
implementation plans (SIP) “that provide for the attainment and maintenance of standards
established by USEPA through control programs directed to sources of the pollutants involved.”
Mot. at 1-2 (¶2), citing 42 U.S.C. § 7410. The Agency further states that “[t]he CAA also
provides for the State to address emissions sources on an area-specific basis though such
requirements as reasonably available control measures (RACM) and reasonably available control
technology (RACT).” Mot. at 2(¶2), citing 42 U.S.C. §§ 7502, 7511a. The Agency also states
that,
[f]or each nonattainment area, the CAA requires the State to demonstrate that it
has adopted ‘all reasonably available control measures as expeditiously as
possible (including such reductions in emissions from existing sources in the area
2
as may be obtained through the adoption, at a minimum, of reasonably available
control technology) and shall provide for attainment of the nation primary
ambient air quality standards.’ Mot. at 2 (¶¶2, 5), citing 42 U.S.C. § 7502(c)(1).
The Agency indicates that its proposal is intended to meet Illinois’ obligation under the
CAA to submit a State Implementation Plan (SIP) addressing major sources of NO
x
in areas
designated as nonattainment with respect to National Ambient Air Quality Standards (NAAQS).
Mot. at 2 (¶3), citing 42 U.S.C. §§ 7502, 7511a. NO
x
is one of the two primary precursors to the
formation of ozone, and NO
x
is also a precursor to the formation of fine particulate matter
(PM
2.5
). Mot. at 2 (¶3). USEPA has designated two areas of Illinois as nonattainment for both
ozone
1
and PM
2.5
2
The Agency states that, by letter dated March 12, 2009, USEPA reiterated that Illinois
must still “address the findings of failure to submit the required ozone SIP element previously
identified by the USEPA. . . .” Mot. at 4 (¶12), citing 73 Fed. Reg. 15416;
see
Mot., Att. C
. Mot. at 2, 3 (¶¶4, 7, 8), citing 40 C.F.R. 81.314.
The Agency characterizes RACT as a “subset” of RACM. Mot. at 2 (¶6). The Agency
states that “RACT is defined as the lowest emission limitation that a particular source can meet
by applying a control technique that is reasonably available considering technological and
economic feasibility.”
Id
., citing 44 Fed. Reg. 53762 (Sept. 17, 1979). The Agency further
states that the CAA requires Illinois “to adopt RACT rules for all areas designated nonattainment
for ozone and classified as moderate or above.” Mot. at 2 (¶6), citing 42 U.S.C. § 7511a.
The Agency argues that, by September 15, 2006, Illinois was required to submit “a SIP
demonstrating that sources specified under the CAA were subject to RACT requirements.” Mot.
at 3 (¶9), citing 70 Fed. Reg. 71612, 71652 (Final Rule to Implement the 8-Hour Ozone National
Ambient Air Quality Standard; Final Rule). The Agency states that, on March 24, 2008, USEPA
found “that Illinois, among other states, failed to make a RACT submittal required under Part D
of Title I of the CAA for its two moderate nonattainment areas.” Mot. at 4 (¶11), citing 73 Fed.
Reg. 15416 (Mar. 24, 2008);
see also
Mot., Att. B (letter from USEPA Regional Administrator).
The Agency further states that “[s]uch a finding starts the 18-month emission offset sanctions
clock and 24-month highway funding sanctions clock . . . and the 24-month clock for the
promulgation by USEPA of the Federal Implementation Plan . . . .” Mot. at 4 (¶11), citing 42
U.S.C. §§ 7509(a), (b), 7410(c).
1
For the eight-hour ozone NAAQS, the following jurisdictions comprise the greater Chicago
nonattainment area: Cook, DuPage, Kane, Lake, McHenry, and Will Counties, Aux Sable and
Goose Lake Townships in Grundy County, and Oswego Township in Kendall County. Mot. at 3
(¶7). The following counties comprise the Metro-East/St. Louis nonattainment area: Jersey,
Madison, Monroe, and St. Clair.
Id
.
2
For the PM
2.5
NAAQS, the following jurisdictions comprise the greater Chicago nonattainment
area: Cook, DuPage, Kane, Lake, McHenry, and Will Counties, Aux Sable and Goose Lake
Townships in Grundy County, and Oswego Township in Kendall County. Mot. at 3 (¶8). The
following jurisdictions comprise the Metro-East/St. Louis nonattainment area: Madison,
Monroe, and St. Clair Counties and Baldwin Township of Randolph County.
Id
.
3
(letter from USEPA Acting Regional Administrator). The Agency states that USEPA’s letter
emphasized the risk of sanctions and requested that the Agency and the Board expedite their
processes to adopt the ozone SIP and avoid those sanctions. Mot. at 4 (¶13), citing Mot., Att. C.
Specifically, the Agency claims “that if, by September 24, 2009, Illinois has not
submitted all of the required SIP elements,” the new source offset sanction will apply in the two
nonattainment areas, making it more difficult for new sources to locate there. Mot. at 5 (¶15).
The Agency further claims that, if Illinois has not submitted the required SIP elements within six
months after imposition of the first sanction, then Illinois will suffer highway sanctions. Mot. at
5 (¶16), citing 40 C.F.R. 52.31. The Agency also claims that, if Illinois has not submitted the
required SIP elements and received USEPA approval by March 24, 2010, then USEPA may
promulgate a FIP to replace the SIP elements that Illinois lacks. Mot. at 5 (¶17).
The Agency concludes by arguing that, “due to the impending date of September 24,
2009, so as to avoid the imposition of sanctions, the regulations need to be adopted in an
expedited manner.” Mot. at 6 (¶21). Specifically, the Agency requests that the Board proceed to
Second Notice as expeditiously as possible. Mot. at 6 (¶23), citing 5 ILCS 100/1-1
et seq
.
(Illinois Administrative Procedure Act). The Agency expresses the belief that “the Board
possesses the information necessary for the Board to proceed to Second Notice. . . .” Mot. at 6
(¶24). In the event that the Board requires additional information, the Agency states that it “will
fully cooperate to expeditiously provide the same to the Board and its hearing officer.
DISCUSSION AND CONCLUSION
Section 101.500(d) of the Board’s procedural rules provide in pertinent part that
[w]ithin 14 days after service of a motion, a party may file a response to the
motion. If no response is filed, the party will be deemed to have waived objection
to the granting of the motion, but the waiver of objection does not bind the Board
or the hearing officer in its disposition of the motion. Unless undue delay or
material prejudice would result, neither the Board nor the hearing officer will
grant any motion before expiration of the 14 day response period. . . . 35 Ill.
Adm. Code 101.500(d).
Based on the circumstances described in the Agency’s motion, the Board finds that undue delay
would result from awaiting the expiration of the 14-day response period and will proceed below
to decide the motion. In this regard, the Board notes that, on March 24, 2009, in order to avoid
undue delay, the hearing officer issued an order directing any participant wishing to respond to
the Agency’s motion to do so on or before March 30, 2009.
Before deciding the motion, however, the Board notes that it received from ANR Pipeline
Company, Natural Gas Pipeline Company, Trunkline Gas Company, and Panhandle Eastern
Company (collectively, Pipeline Consortium) on March 24, 2009, a response to the Agency’s
motion (PC Resp.). The Pipeline Consortium states that it has participated actively with both the
Agency and the Board in this rulemaking and that it “is part of the community regulated by the
proposed rule.” PC Resp. at 1. The Pipeline Consortium further states that it “supports the
4
Agency’s Motion to Expedite Review and urges the Board to adopt the proposal as it has been
amended over the course of the rulemaking as soon as possible.”
Id
.
The Board also notes that it received from the Illinois Environmental Regulatory Group
(IERG) on March 30, 2009, a response to the Agency’s motion (IERG Resp.). IERG notes that
the Agency filed post-hearing comments including proposed regulatory language “agreed to by
all parties, with one exception, . . . the replacement unit language at proposed Section
217.390(a)(2)(A).” IERG Resp. at 1. IERG further notes that, based on its position on this issue,
it has proposed alternative language.
Id
. IERG states that, because there is “only one sentence at
issue in this proceeding, IERG has no objection to Illinois EPA’s request to move expeditiously
to Second Notice.”
Id
. at 2.
Section 101.512 of the Board's rules addresses requests for expedited review.
See
35 Ill.
Adm. Code 101.512. Such requests must include, among other elements, “a complete statement
of the facts and reasons for the request.” 35 Ill. Adm. Code 101.512(a). In acting on a motion for
expedited review, the Board considers, at a minimum, “all statutory requirements and whether or
not material prejudice will result from the motion being granted or denied.” 35 Ill. Adm. Code
101.512(b). In addition, the Board will only grant a motion for expedited review consistent with
available resources.
See
35 Ill. Adm. Code 101.512(c).
In denying a recent motion for expedited review filed by the City of Galva, the Board
stated that its “limited resources in light of its current and future decision deadlines render the
granting of a motion for expedited review unlikely in all but the most dire circumstances.” In the
Matter of: City of Galva Site-Specific Water Quality Standard for Boron Discharges to Edwards
River and Mud Creek: 35 Ill. Adm. Code 303.447 and 303.448, R9-11, slip op. at 3 (Feb. 5,
2009). The Board can only conclude that USEPA’s implementation deadline and the risk of
federal sanctions constitute “dire circumstances.” The Agency’s motion for expedited review is
granted. The Board will proceed to adopt a second-notice opinion and order in this rulemaking
as expeditiously as it able to do so with its current resources.
IT IS SO ORDERED.
I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that
the Board adopted the above order on April 2, 2009, by a vote of 5-0.
___________________________________
John T. Therriault, Assistant Clerk
Illinois Pollution Control Board