December 14, 1994
BARBARA
L. HEISER
)
(HEISER’S GARAGE),
Petitioner,
)
v.
)
PCB 94—377
)
(UST Fund)
OFFICE OF THE STATE FIRE
)
MARSHAL,
)
)
Respondent.
ORDER OF
THE BOARD
(by M. McFawn):
On December 9, 1994, Barbara L. Heiser (Heiser’s Garage),
filed a petition for review of an Office of the State Fire
Marshal (“OSFI”) final reimbursement determination from the
Underground Storage Tank Fund. The OSFN issued a final
reimbursement decision on November 10, 1994, which contains the
stated reasons for ineligibility. The final determination
concerns the Petitioner’s site located at 1728 North Sheridan
Road, Peoria, Peoria County, Illinois. This matter is accepted
for hearing.
The hearing must be scheduled and completed in a timely
manner. The Board will assign a hearing officer to conduct
hearings consistent with this order. The Clerk of the Board
shall promptly issue appropriate directions to that hearing
officer.
The assigned hearing officer shall inform the Clerk of the
Board of the time and location of the hearing at least 40 days in
advance of hearing so that public notice of hearing may be
published. After hearing, the hearing officer shall submit an
exhibit list, a statement regarding credibility of witnesses and
all actual exhibits to the Board within five days of the hearing.
Any briefing schedule shall provide for final filings as
expeditiously as possible.
If after appropriate consultation with the parties, the
parties fail to provide an acceptable hearing date or if after an
attempt the hearing officer is unable to consult with the
parties, the hearing officer shall unilaterally set a hearing
date. The hearing officer and the parties are encouraged to
expedite this proceeding as much as possible.
This order will not appear in the Board’s opinion volumes.
2
IT IS SO ORDERED.
I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
Bo~r4~herebycerj~fythat the above order was adopted o~the
/‘-~-~dayof
/
~
,
1994, by a vote of
~‘ ~‘
~Dorothy M.4~unn, Clerk
Illinois ~Øllution Control Board