ILLINOIS POLLUTION CONTROL BOARD
    June 20, 1991
    VILLAGE OF AVISTON,
    Petitioner,
    v.
    PCB 91—103
    (Provisional Variance)
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    )
    Respondent.
    ORDER OF THE BOARD (by J.C Marlin):
    This matter conies before the Board on receipt of an Agency
    Recommendation dated June 19, 1991. The recommendation refers to
    a request from Petitioner, Village of Aviston, for a provisional
    variance from the biochemical oxygen demand (CBOD~) and suspended
    solids (TSS) effluent requirements, as set forth in 35 Ill. Adin.
    Code 304.102(c) and 304.141(a), for the period from when the
    Petitioner begins repairs to its wastewater treatment plant, by
    bypassing its contact stabilization unit, and continuing until
    the Petitioner returns that unit to service, but not for longer
    than 45 days.
    The Agency recommends that the Board grant the requested
    provisional variance with specified conditions. The Agency
    agrees that the repairs are necessary. The Agency anticipates
    that the requested provisional variance would have minimal
    environmental impact on the receiving stream. The Agency is
    unaware of any public water supplies that the requested
    provisional variance would adversely impact. The Agency
    maintains that a grant of a provisional variance would violate no
    federal laws. The Agency finds that a denial of the requested
    provisional variance would create an arbitrary and unreasonable
    hardship on the Petitioner.
    The responsibilities of the Agency and the Board in these
    short—term provisional variances are different from the
    responsibilities in standard variances. See Ill. Rev. Stat.
    1989, ch. 11l~,pars. 1035(b) &
    (C).
    In provisional variances it
    is the responsibility of the Agency to make the technical
    determinations and finding of arbitrary or unreasonable hardship.
    The Board’s responsibility is to adopt a formal Order, to assure
    the formal maintenance of the record, to assure the
    enforceability of the variance, and to provide notification of
    the action by a press release.
    Having received the Agency recommendation finding that a
    denial of the requested relief would impose an arbitrary and
    unreasonable hardship, the Board hereby grants Petitioner a

    2
    provisional variance from 35 Ill. Adm. Code 304.120(c) and
    304.141(a) on the following conditions:
    1. The term of this provisional variance shall commence on
    when the Petitioner, Village of Aviston, initiates bypassing
    its contact stabilization unit, and it shall expire on the
    date the Petitioner returns its contact stabilization unit
    to service or after 45 days have elapsed, whichever comes
    first;
    2. During the term of this provisional variance, the
    effluent from the Petitioner’s treatment plant shall not
    exceed concentrations of 30 mg/i CBOD5 or 30 mg/i TSS
    (concentration limits);
    3. During the term of this provisional variance, t~ie
    Petitioner shal~1sample for CBOD5 and TSS one day per week
    (composite sample) and for all other permit limits at the
    frequency noted in NPDES permit number 1L002 0001;
    4. The Petitioner shall notify Chris Port of the Agency’s
    Coliinsville Regional office by telephone, at 618—346—5120,
    when it removes its contact stabilization unit from service
    and when it returns the unit to service, and the Petitioner
    shall confirm this notice in writing within five days,
    addressed as follows:
    Illinois Environmental Protection Agency
    Division of Water Pollution Control
    Compliance Assurance Section
    2200 Churchill Road
    P.O. Box 19276
    Springfield, Illinois 62794—9276
    Attention: Barb Conner
    5. The Petitioner shall return its contact stabilization
    unit to service as soon as possible and operate its plant
    during the term of this provisional variance in a manner
    that assures the best treatment practicable; and
    6. The Petitioner shall operate its plant during the term
    of this provisional variance in a manner that assures the
    best treatment practicable; and
    7. The Petitioner shall execute a copy of a Certificate of
    Acceptance of this provisional variance and forward that
    copy to the Agency addressed as is the written notice
    required in the above condition; the Petitioner shall
    forward that copy within 10 days of the date of this Order
    of the Board, and the Certificate of Acceptance shall take

    3
    the following form:
    CERTIFICATION
    I (We), ________________________________
    hereby accept and agree to be bound by all terms
    and conditions of the Order of the Pollution
    Control Board in PCB 91-103, June 20, 1991.
    Petitioner
    Authorized Agent
    Title
    Date
    IT IS SO ORDERED.
    J.D..Dumelle and B. Forcade concurred.
    I, Dorothy N. Gunn, Clerk of the Illinois Pollution Control
    Board, do hereby certif that the above Order was adopted on the
    c~91~Zday of _________________________, 1991, by a vote of
    //~
    Dorothy N. G)d,~’in, Clerk
    Illinois Po~Jution Control Board

    Back to top