ILLINOIS POLLUTION CONTROL BOARD
    May 10, 1990
    MINNESOTA MINING AND
    MANUFACTURING COMPANY,
    Petitioner,
    v.
    )
    P02 90-45
    (Variance)
    ILLINOIS ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD (by R. C. Flemal):
    This matter comes before the Board upon the April
    23,
    1990
    motion of Petitioner to su~p1emenr its Petition for Variance, as
    originally filed on April 2, 1990. This motion is granted.
    As a subsidiary matter, the Board notes Petitioner’s belief
    that the supplement to the Petition does not constitute an
    Amended Petition. However, as a general rule, any filing of new
    information by a petitioner constitutes an
    Amended
    Petition
    which, among other matters,
    resets
    the 120-day decision clock
    (e.g., City of Mt. Olive v. IEPA, PCB 83—9, 54 PCB 101; Mobil Oil
    Co.
    v. IEPA, PCB 84—37, 60 PCB 41; Marathon Petroleum Corp. v.
    IEPA, PCB 85—83, 66 P03 25; City of Geneva v. IEPA, PCB 86-225,
    78 PCB 11 and 78 PCB 378; City of Springfield v. IEPA, PCB 88—
    113, 92 PCB 483). The 120—day decision clock shall accordingly
    be calculated as tolling from April 23, 1990.
    IT IS SO ORDERED.
    I, Dorothy
    M. Gunn,
    Clerk of the Illinois Pollution Control
    Board, hereby certify that the above Order was adooted on
    the
    /~‘
    ~day
    of
    ___________________
    ,
    1990, by a vote
    of
    ~‘—c
    /~_
    (~7
    :-~
    ~/,
    )~). /2’~-~-~
    Dcrorhy M.
    G~tn, Clerk
    Lllinois ?oliution
    Control Board
    ii ~13~

    Back to top