ILLINOIS POLLUTION CONTROL BOARD
January 11, 1990
ILLINOIS POWER COMPANY
(Clinton Power Station),
Petitioner,
v.
)
PCB 89—213
(Variance)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
ORDER OF THE BOARD (by B. Forcade):
On December 21, 1989, Illinois Power Company, Clinton Power
Station (“IPC”), filed a petition for extension of variance for
its discharges to Clinton Lake at IPC’s Clinton Power Station.
That petition is deficient in that it fails to provide:
a statement on whether or not a hearing on the
petition is desired by petitioner, or, in the
alternative, a statement waiving a hearing
accompanied by such affidavits or other proof
in support
of.
the material facts alleged in
the petition as the petitioner may submit,
sufficient to enable the Board, if it so
decides, to rule upon the petition without a
hearing, as required by 35 Ill. Adm. Code
104.124.
In addition, IPC seeks to incorporate by reference the
“record, opinion and orders’ of PCB 88—97. The Board will
incorporate the Opinion and Order of the Board in PCB 88—97;
however, any part of the record which IPC wants included must be
reproduced and filed in this case by IPC, pursuant to 35 Ill.
Adm. Code 101.106, “Incorporation of Prior Proceedings.”
Unless an amended petition is filed within 45 days of the
date of this Order, curing the above—noted defects, this matter
will be subject to dismissal.
IT IS SO ORDERED.
107—105
—2—
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
Board, hereby certif
the
____
//~Zday of
____________________
~~~~above
Order1990, wasby adopteda
vote
on
of
7-o
.
Do r
e’r
k
Illinois Po~ution Control Board
107— 106