    ORDER OF THE BOARD (by LID. Dumelle):
    This matter comes before the Board upon an October 3, 1985,
    motion for reconsideration filed on behalf of the Illinois Power
    Company (IPC) to which the Illinois Environmental Protection
    Agency (Agency) responded on October
    9,
    1985. IPC filed a motion
    for leave to reply and a reply on October 10, 1985. The motion
    for leave is hereby granted. IPC requests that the Board
    reconsider its September 20, 1985 Order denying IPC’s September
    6, 1985, motion for summary judgment. In that Order the Board
    based its decision on the hearing requirement for permit appeal;
    pursuant to Section 40(a)(1) of the Environmental Protection Ac;~.
    (Act). IPC characterizes that basis as a “non sequitur”.
    However, though the motion was not particularly clear regardintj
    the relief requested, the Board construed that motion as
    requesting the Board to order the Agency to issue the permit
    without the contested conditions. If so, holding a hearing woH
    become a useless act, contrary to the legislative intent
    expressed in mandating
    such
    a hearing.
    The motion for reconsideration does not clarify the re1i~f
    requested. The Board could construe the motion as requesting th~
    Board to simply remand the proceeding to the Agency to issue th~
    permit in whatever form it deems appropriate using proper
    procedures. However, that course of action appears to be
    precluded because the Agency then would have been given “the
    identical options to consider as permit conditions which
    petitioner originally contested as objectionable,” and,
    therefore, the Board would have failed to adjudicate the
    controversy. Illinois Power Co. v. IPCB, 426 N.E.2d 1258, 1261
    (1981).
    At the heart of IPC’s request for summary judgment is its
    concern that the Agency, through its alleged disregard of state
    and federal law, has deprived IPC of the ability to adequately
    66-27

    —2—
    prepare for hearing by reason of the Agency’s failure to respond
    to IPC’s written comments during the permit review proceeding
    before the Agency or otherwise to explain its rationale for the
    contested conditions when the permit was issued. IPC further
    argues that unless the Board decides those issues now, the Board
    will be contributing to the due process violations. However, IPC
    should be able to determine the Agency’s position on the
    substance of the contested conditions through the discovery and
    prehearing process, thereby avoiding any prejudice at hearing.
    In its reply IPC indicates that this procedure may somehow shift
    the burden of proof to it. The Board does not understand this
    argument. The burden of proof cannot be altered by the discovery
    process. Thus, the Board does not believe that the issues raised
    by IPC need be decided at this time and since those issues
    present questions of both law and fact, they are best decided
    after hearing.
    The Board notes that a decision is due in this matter on
    October 16, 1985, and that hearing has not been scheduled due to
    an administrative oversight. Obviously, hearing cannot be
    properly held in a timely manner, and as of that date IPC will be
    entitled to an appellate court order pursuant to Sections
    40(a)(3) and 41(d) of the Act. The Board regrets that this has
    occurred. However, the Board will make every effort to reach a
    final determination in this matter as expeditiously as possible.
    The Board hereby affirms its September 20, 1985 Order.
    IT
    IS SO ORDERED.
    I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control
    Board, hereby certifi th the above Order was adopted on
    the /,~Z~dayof ~
    ,
    1985 by a vote of 7°
    orothy M. Gunn, Clerk
    Illinois Pollution Control Board
    88-28