ILLINOIS POT LUTION C ~OL 3O~RD
5eptcmbc~ ~ 1 82
ALTON 
WATER CO 
,
PCB 
82~13
ILLINOIS 
ENVIRONMENTAL ~R
ORDER 
OF 
THE BOARD (by J~ c~etsor
On 
August 23, 1982 Alto ~iled u “mction to 
reconsider or, in
the alternative, 
to correct eler cal error” in the 
Board~sOpinion
and Order 
of August 18, 1982. Thc Board had granted a 
variance to
“terminate 
September 1, 1985 or upon any earlier final 
decision in
R82—3”, 
based upon the Agen y A ~mrrendation Alton 
asserts that
the variance ten~is ins fficic~
t, r~the event of an 
unfavorable
decision 
in R82—3, to sI~ieldi: froit~ erforcement 
while it is in
the process of constructing facilit~ces to treat the wastes from
its water 
purification plant~. tLiles~ the term is extended, 
Alton
notes that it immediately 
‘~ 
uld ~gain be required to 
seek a
variance”. Two altczr t a v~r 
~  ‘~i~s re suggested 
for the
Board~s 
considerati 
r   
n 
ci  
~h  
jre~l ~o by the 
Agency.
The Board 
will modify its order to embody the 
agreed
replacement 
variance tern, as a~ 
tut  
~uree year maximum 
duration
remains 
unchanged, and b) in ti’c. even~of an unfavorable 
decision
in R82~3, 
construction tine for tI’~. 
t~eatrient 
facilities would be
about 20 
months,
Paragraph 
1(a) of the Board~sOrder of August 
18, 1982 is
stricken, to 
be replaced qith:
“a. 
This variance ~ha I terrinate ~eptember 
1,
1985 or upon 
the earlier date of eIther (1) a final
Board decision 
in R82—3 fa~orableto Petitioner or
(2) Agency 
issuance (follo~ingprompt application) 
of
an 
operating or NPDES ?ermit for treatment facilities
disposing 
of wastes from the Petitroner~ water
treatment 
plants”
IT IS 
SO 
ORDERED.
I, 
Christan 
L~Moffett Clerk of the Illinois 
Pollution
Control ~oard, 
hereby cc tify that the above Order 
was adop ed on
the ~1~’ 
day of            
~982 by 
a vote of 0
Christan L. Moff  
Clerk 
——
Illinois Pollution 
Control Board