    This matter comes before the Board on the January 29, 1981
    Complaint brought by the Illinois Environmental Protection Agency
    (“Agency”).
    Count I of the Complaint alleged that, on various specified
    dates between January 9, 1979 and April 5, 1980, the Village of
    Brighton (the “Village”) operated its wastewater treatment facility
    (“facility” or “plant”) in such a manner as to discharge effluents
    into an unnamed tributary of the West Fork of the Wood River, an
    Illinois water, which contained concentrations of suspended solids
    and BODç in excess of prescribed limits thereby violating Rules 401(c)
    and 404(f) or in the alternative 404(c)* of Chapter 3: Water
    Pollution Control Regulations (“Chapter 3”) and Section 12(a) of the
    Illinois Environmental Protection Act (“Act”).
    Count II alleged that, from January 25, 1978 until January 29,
    1981, the Respondent failed to operate its facility so as to
    minimize violations of applicable standards in violation of
    Rule 601(a) of Chapter 3 and Section 12(a) of the Act.
    *Rule 404(f) has been deleted. The Complaint (p.5) and the
    Stipulation (p.3) list maximum BODç and suspended solids effluent
    concentrations of 547 mg/l and 14Ot~ mg/i respectively, thereby
    indicating a violation of Rule 404(c).
    43—73

    —2—
    A hearing was held on June 24, 1981 at which members of the
    public were present. The parties filed a Stipulation and Proposal
    for Settlement on June 30, 1981.
    The Village of Brighton, which has a population of about 2,000
    individuals, is located in Macoupin County, Illinois. The Respondent’s
    wastewater treatment system includes “a comminutor, two aeration tanks,
    two final settling tanks and a sludge holding tank.” (Stip. 2).
    The Village discharges its wastewater into an unnamed tributary of
    the West Fork of the Wood River.
    It is stipulated that “the Agency received a complaint from a
    farmer one—third mile downstream of said treatment system on the
    North Fork of Wood River” on September 7, 1978. (Stip. 4). In its
    investigation of the farmer’s complaint regarding excessive discharg&3~
    of pollutants from the Village’s plant into a creek which runs
    through the farmer’s property, “the Agency learned Brighton’s treat-
    ment system had a power outage.” (Stip. 4—5).
    During the period from 1978 until 1981, Agency personnel
    discussed with the Village’s wastewater treatment plant operators
    “ways in which to improve operation of Brighton’s treatment system”
    (Stip. 5; See: Exhibits A and B). The Village currently employs a
    Certified Class III Operator and a Certified Class IV Operator who
    “is scheduled to take the next Class II and Class III Operator
    Certification exam offered by the Agency in August, 1981.” (Stip. 5).
    In an attempt to alleviate the various operational problems
    that were encountered, the Village retained a private engineering
    firm which inspected the Respondent’s treatment system on March 19,
    1981. (Stip. 5). According to this engineering firm, the “chief
    problem encountered was excessive suspended solids due to the fact
    that the sludge had been aerated too long, causing poor settling and
    a high sludge volume index”. (Stip. 6). The consulting engineer
    recommended specified steps to eliminate the sludge problem and
    the Village implemented all the engineer’s recommendations by
    May 13, 1981. (Stip. 6).
    The parties have stipulated that, at various times between
    January 25, 1978 and January 29, 1981, the Village failed to
    properly operate its plant so as to minimize violations of applicable
    standards by failing to: (1) keep its flow meter operative;
    (2) install an activated sludge blower; (3) maintain adequate
    operational records; (5) have an adequate sludge handling facility;
    (6) have sufficient process control; and (7) have a sufficient power
    outage alarm system. (Stip. 4),
    The parties have also noted that, while the Respondent does
    not currently have an NPDES Permit for its wastewater discharge,
    the Agency is presently processing the Village’s NPDES Permit
    application. (Stip. 6).
    43—74

    —3
    The proposed settlement agreement provides that the Village:
    (1) admits all the violations alleged in the Complaint; (2) agrees
    to cease and desist from further violations by following a specified
    compliance plan and schedule (which includes maintenance of an
    alarm system, proper sludge removal, process control tests,
    monitoring of effluent discharges, and the filing of all necessary
    reports with the Agency), and (3) payment of a stipulated penalty
    of $750.00
    In evaluating this enforcement action and proposed settlement
    agreement, the Board has taken into consideration all the facts and
    circumstances in light of the specific criteria delineated in
    Section 33(c) of the Act and finds the settlement agreement acceptable
    under Procedural Rule 331.
    The Board finds that the Respondent has violated Rules 401(c)
    and 404(f) or in the alternative 404(c) and 601(a) of Chapter 3:
    Water Pollution Control Regulations and Section 12(a) of the Illinois
    Environmental Protection Act. The Respondent will be ordered to
    cease and desist from further violations and the stipulated penalty
    of $750.00 will be assessed against the Village of Brighton.
    This Opinion constitutes the Board’s findings of fact and
    conclusions of law in this matter.
    ORDER
    It is the Order of the Illinois Pollution Control Board that:
    1. The Respondent, the Village of Brighton, has violated
    Rules 401(c) and 404(f) or in the alternative 404(c) and 601(a)
    of Chapter 3: Water Pollution Control Regulations and Section 12(a)
    of the Illinois Environmental Protection Act,
    2. The Respondent shall cease and desist from further violations~.
    3. The Respondent shall follow the specified compliance plan
    and schedule delineated in the settlement agreement.
    4. Within 30 days of the date of this Order, the Respondent
    shall, by certified check or money order payable to the State of
    Illinois, pay the stipulated penalty of $750.00 which is to be
    sent to:
    Illinois Environmental Protection Agency
    Fiscal Services Division
    2200 Churchill Road
    Springfield, Illinois 62706
    5. The Respondent shall comply with all the terms and conditions
    of the Stipulation and Proposal for Settlement filed on June 30, 1981,
    which is incorporated by reference as if fully set forth herein.
    43—75

    —4—
    I, ~hristan L. Moffett, Clerk of the Illinois Pollution Control
    Board, here~y certify tha~th~above Opinion and Order were adopted
    on the
    ~
    day of
    ____________,
    1981 by a vote of
    “~L~
    (I)
    Christan L. Mô~f~ett/perk
    Illinois Pollution ~&~trol Board
    43—76