ILLINOIS POLLUTION CONTROL BOARD
August 7, 1980
THE TEXAS PIPE LINE COMPANY,
)
)
Petitioner,
)
)
v.
)
PCB 80—137
)
ILLINOIS ENVIRONMENTAL PROTECTION
)
AGENCY,
)
)
Respondent.
)
ORDER OF THE BOARD (by T.D. Dumelle):
Petitioner filed a Petition for Variance from a permit
completion schedule on July 28, 1980. That petition is hereby
dismissed since there is no showing that the Petitioner
has attempted to obtain a permit modification from the Illinois
Environmental Protection Agency. Therefore, this petition
appears to be premature.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control B~ard, hereby certify that the above Order as adopted
on the
j
day of
___________
,
1980 by a vote of
_________
Christan L. Mof~ t Clerk
Illinois Polluti ontrol Board