ILLINOIS POLLUTION CONTROL BOARD
January 18, 1979
BODINE ELECTRIC COMPANY
Petitioner,
v.
)
PCB 78—248
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
OPINION AND ORDER OF THE BOARD (by Mr. Dumelle):
Petitioner is seeking a variance from the requirements of
Rule 205(f) of the Board’s Air Pollution Control Regulations.
On June 21, 1978 the Agency denied Petitioner an operating permit
because an enamel spray paint booth would emit organic material
at a rate of 14.78 pounds per hour. Rule 205(f) allows only
eight pounds per hour. Petitioner is attempting to convert to
a finish spray enamel whose volatile constituents are photochemically
non-reactive in order to qualify for the exception to Rule 205(f)
when no odor nuisance exists. Petitioner plans on gradually
phasing in the new enamel until May 16, 1979 and then using it
exclusively.
The Agency has recommended that the variance be granted.
After reviewing the requirements of Section 113(d) of the Clean
Air Act the Agency has concluded that Petitioner may be eligible
for a delayed compliance order. As a condition to the variance
the Agency has asked that Petitioner be required to pay a bond
to assure timely compliance. No hearing was held.
The Board concludes that Petitioner’s compliance program
is reasonable. No performance bond will be required since no
constuction work is required. Since the variance will run during
a time of the year when minimal ozone formation is expected,
little, if any, adverse environmental impact is expected from
this relief. When this negligible harm is coupled with the
alternative of an interruption in Petitioner’s operations, it
becomes apparent that Petitioner would suffer an arbitrary or
unreasonable hardship if this variance were denied.
This Opinion constitutes the Board’s findings of fact and
conclusions of law in this matter.
32—441
—2—
ORDER
It is the Order of the Pollution Control Board that Petitioner
be granted a variance from Rule 205(f) of the Board’s Air Pollution
Control Regulations until May 16, 1979 subject to the following
conditions:
1) Within 35 days of the date of this Order Petitioner
shall apply to the Agency for all necessary operating
permits.
2) Within 35 days of the date of this Order, and on a
quarterly basis thereafter, Petitioner shall submit
written reports to the Agency detailing all progress
made toward compliance with Rule 205(f) of the Board’s
Air Pollution Control Regulations. These reports shall
be submitted to:
Illinois Environmental Protection Agency
Division of Air Pollution Control
Control Program Coordinator
2200 Churchill Road
Springfield, Illinois 62706
3) Within 45 days of the date of this Order, Petitioner
shall execute and forward to the Illinois Environmental
Protection Agency, Division of Air Pollution Control,
Control Program Coordinator, 2200 Churchill Road,
Springfield, Illinois 62706, a Certificate of
Acceptance and Agreement to be bound to all terms and
conditions of this variance. This 45 day period shall
be held in abeyance while this matter is appealed.
The form of the Certificate shall be as follows:
CERTIFICATION
I(we), ________________________having read and fully
understanding the Order in PCB7B-248 hereby accept that Order and
agree to be bound by all of its terms and conditions.
SIGNED
TITLE
DATE
32—4 42
—3—
I, Christan L. Moffett, Clerk of the Illinois Pollution
Control Board, herey certify the above Opinion and Order were
adopted on the ~
day of
1979 by a vote of
_______
C ristan L. Moffe Cler
Illinois Pollutio
trol Board
32—443