OPINION AND ORDER OF THE BOARD (by Mr. Dumelle):
This case comes before the Board on a Petition for Variance
filed on September14, 1976 by the Mendon Community School District
No. 4 for the Greenfield Elementary School located approximately
two miles north of Ursa, Adams County, Illinois. The District
requests variance from the BOD5 and suspended solids standards in
Water Pollution Regulation 404(f) until such time as it is able to
connect the School’s sewage effluent onto a sewage treatment plant
to be constructed by the Village of Ursa. Ursa presently is in
the Step I phase of grant application for such facilities and
it is anticipated that only Step II funds will be available with
the present appropriated funds. It thus appears uncertain as to
whether the plant would be completed by December 31, 1977, which
is the District’s proposed compliance date. On November 12, 1976,
the Agency submitted its Recommendation to the Board.
No hearing was held in this matter.
The Petition states that the two principal alternatives for
the correct:ion of the prob ems assoc~
~i
1
(‘(1
Wi
th t h’ ~choo1
‘s present
package activaLed sludge plant are to either hook onto the prospective
Ursa plant or to construct a ~aqoon type wastewater treatment
facility to serve the school. The School generates approximately
4,000 gallons per day of domestic sewage. The Petitioner states
that it is highly desirable that the package plant be removed both
because of its age (15 years) and repeated subjection to mechanical
breakdown. The best solution it feels to this situation would be
the construction of a force main and lift station to allow a hook—on
to a larger sewage treatment plant. The District, in Exhibit “E”
to its Petition estimates the cost to be $66,000 compared to $101,000
24
—
437
for the construction of a lagoon system. However, the Board has no
assurance that the proposed Ursa plant will be completed anywhere near
the projected December 31, 1977 date. Design work is yet to be funded
and completed and additional funding is necessary for the construction.
It is thus necessary to insure that the District make every reasonable
improvement in its present system. Exhibit “G” is a letter from the
Agency, dated July 1, 1976, suggesting a short-term program for improving
the School’s effluent. In paragraph 11 of its Petition, the District
states that it has “substantially” complied with that program.
Even so, the Agency has seen fit to ask in its Recommendation that
further interim requirements be considered and/or imposed by July 31,
1977.
According to the Agency’s Recommendation, the discharge is only
1—3 gpm. Bear Creek, which eventually receives this flow, has an
average annual flow of 90,000 qpm. Thus the discharge appears to
be de minimus but no information is given as to any odors, etc.
emanating from the unnamed tributary.
On November 30, 1976 the District filed a Response to the
Agency Recommendation. It stated that the cost of adding reliable
aeration equipment, an intermittent sand filter and disinfection
equipment would be $25,600. The District also pointed out that it
is now operating on a deficit basis and has been required to curtail
needed educational programs and other servic
It has a tax
referendum scheduled in December 1976 to pro”iide needed funds.
On December 9, 1976 the Petitioner f)J~dan Additional Response
with the Board and stated that the Deç~rc~er4, 1976 tax increase proposa~
had been defeated.
The Board is required to ~‘étermine whether an arbitrary and
unreasonable hardship will ex/st if the variance is not granted.
On balance we feel that a v~Ørianceis justified. The District has
shown good faith in complyi/ng with earlier Acency requests to up-
grade its treatment faci1i,~y. The discharge is extremely small in
volume and the Agency its,élf terms its effect upon Bear Creek to
be “quite minimal”.
Lastly, the financial plight of the District
has been shown. If funds/are available in early 1977 then there is
a bare possihii ty
that/the
Ursa proji~rtmay be completrcl by
E)r~rrnh’r I,
1’)77.
I~sir~dI av~r5 I ~
1 lutinal
!~ri
of
sini
I I wasle
I teat
rflt’flt
~I anl s
WItt?~’t~
t’V.’r c~iidi LiOns
make this pu~~ibit.’
This Opinion constitutes the Board’s findings of fact and
conclusions of law.
4~
—438
—3—
ORDER
The Petitioner, Mendon Community Unit
School District No. 4
is granted variance from Rule 404 (f) of the Water Pollution Regula-
tions until December 31, 1977 as regards the (Theenfield Elementary
School sewage treatment plant.
The School District shall adequately maintain and operate
the subject treatment plant to minimize breakdowns and poor effluent
quality.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Opinion and Qrder were adopted on the
L94”
day of December, 1976 by a vote of $~Q
Christan L. Moffe
lerk
Illinois Pollution ntrol Board
24—439