ILLINOIS POLLUTION CONTROL BOARD
    November 10, 1976
    .~2~1Y;OPT~5
    OF
    ENGINEERS
    Petitioner,
    v.
    )
    PCB 76—264
    ENVIRONMENTAL
    PROTECTION AGENCY,
    Respondent.
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed October 21, 1976 is inadequate in that the
    amounts
    by
    which the limits of Rule 408
    of
    the Water Pollution Control
    Rules will he exceeded are not clearly given nor is the effect
    delineated upon water quality in the streams affected.
    Furthermore, the “short—term increases in turbidity and
    both
    suspended and dissolved solids in the immediate vicinity
    of the
    dredging operation” are not quantified as to duration or
    strength. The cost of the treatment plant alternative is not
    qiven nor is the cost of a failure to dredge.
    Petitioner shall amend the Petition within 45 days from the
    date of this Order to provide the necessary information discussed
    above. A waiver of the 90—day decision period set
    by State statute
    shall also be
    filed
    with the Board and Aqencv to
    run
    from the date
    off
    lung the Amended Petition.
    F~II1tir~ t(
    irn~ly
    ui’
    le’ n(’(d(’d i III(fl~fl1~1l
    i~II
    ~h~i11
    P~1k~ I
    (~
    I
    i
    I
    I
    I
    iii
    I o &I
    ~PI 1
    ~
    1
    (SI
    I 1~(!(‘(
    1
    -
    IT I S S( ) ORI)1RHL)
    I, Christan L.
    Moffett, Clerk of the Illinois Pollution Control
    Board,
    hereby certify the above Order was adouted
    on the /~2day
    of November, 1976 by a vote of
    ___
    Illinois Pollution
    ol Board
    24
    279

    Back to top