ILLINOIS POLLUTION CONTROL BOARD
    November 26,
    1975
    WIRCO CASTINGS, INC.,
    Petitioner,
    v.
    )
    PCB 75—446
    ENVIRONMENTAL PROTECTION
    AGENCY,
    )
    Respondent.
    INTERIM ORDER OF THE
    BOARD
    (by Mr. Zeitlin):
    The Petition for Variance in this matter was filed on
    November 14, 1975. That section of the Petition seeking
    relief from the particulate emission standards is
    inadequate in light of Train v. N.R.D.C., 43 U.S.L.W. 4467
    (U.S., April 16, 1975). The Train case requires that,
    before a Variance may be granted, it must be shown that such
    grant will not interfere with the attainment or maintenance
    of the National Ambient Air Quality Standards. The Petition
    does not address these requirements. See, King—Seeley Co.
    v. EPA, PCB 75-159 (April 24, 1975) (Thteri~Order of the
    Board); Great Lakes Carbon Corp. v. EPA, PCB 75-85 (May 22, 1975).
    It is the Order of the Board that Petitioner shall
    amend its Petition within 45 days of the date of this Order
    to provide the further showing required under the Train
    case. Failure to timely file the Amended Petition shall
    cause the Petition to be dismissed without prejudice, for
    inadequacy. The 90-day decision period set by statute shall
    run from the date of filing of the Amended Petition.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution
    Control Board, hereby certify the above Interim Order was
    adopted on the
    ~J4~’
    day of
    ___________
    1975 by a vote of
    C ristan L. Moffe
    lerk
    Illinois Pollution ntrol Board
    19—
    346

    Back to top