ILLINOIS POLLUTION CONTROL BOARD
June
26,
1975
SKYWAY
REALTY,
Petitioner,
V.
)
PCB 75—249
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
ORDER
OF THE BOARD (by Mr. Dumelle):
Petition filed June 23, 1975 is inadequate in that the
strength
of the effluent from the Lansing sewage treatment plant
is
not given nor is a statement of the biological condition of the
:recei9ing
streams
r211e
Petition is not clear as to whether the
sewer
connection
ban
imposed by
the
Illinois Environmental Protec-
tion
Agency is as a result of inadequate sewage treatment or
inad~uate hydraulic transport capacity~. Furthermore, the date
the proposed connection of the Lansing sewer system to the
detropolitan
Sanitary District of Greater Chicago is not given.
Petitioner shall amend the Petition within 21 days of the
date of this Order to provide the needed information outlined above.
iaiiure to timely file an Amended Petition shall render the Petition
liable to dismissal for inadequacy~ The 90-day decision period set
by statute shall run from the date of filing the Amended Petition.
A~waiver of the decision date to conform to this schedule shall be
filed with the Amended Petition~
IT IS SO
ORDERED~
I,
Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the abov~Order was adopted on the
~
day
of June, 1975 by a vote of
Lj...~
Illinois Pollution
17 —451