ILLINOIS POLLUTION CONTROL BOARD
    October
    30,
    1975
    DEL MONTE CORPO~TION,
    )
    Petitioner,
    V.
    )
    PCB
    75—415
    ENVIRONMENTAL
    PROTECTION
    )
    /
    I
    Respondent.
    INTERIM
    ORDER
    OF THE BOARD (by Mr. Zeitlin):
    The Petition
    for Variance
    in this matter was filed on
    october 24. 1975.
    That
    section of the Petition seeking
    relief
    from the
    organic material emission standards is
    snadequate sri light of Train
    v.
    N.R.D.C., 43 U.S.L.W. 4467
    (U~S.
    • April
    16, 1975)
    ~ThT~erequires
    that,
    before
    a Variance may be gran~ed7it must be shown that such
    qrant wIll not
    interfere with the attainment or maintenance
    of tao National Ambient
    Air Quality Standards. The Petition
    does
    not
    address
    these requirements. See, King—Seeley Co.
    a ~EPA,
    PCB 75—159
    (April 24, 1975) (~erim Order of th~
    ~i~j~ Great
    Lakes Carbon Corp. v, EPA, PCB
    75-85
    (May
    22,
    1975).
    ii:
    is
    the Order of the
    Board
    that
    Petitioner shall
    amend ii:s Petition
    within
    45
    days
    of the date of
    this Order
    to provide the further showing required under the Train
    case.
    Failure to timely file the Amended Petition shall
    cause the Petition to be dismissed without~ prejudice, for
    :Lnadequacy~~ The 90-day decision period set by statute shall
    run from the date of filing of the Amended Petition.
    IT IS SO ORDERED.
    I. Christan L, Moffett, Clerk of
    the Illinois Pollution
    Concrol Board~
    hereby certify th~ajove
    Order was
    adc~ptedon the ~
    day of ~
    ,
    1975 by a vote of
    Christan L. of f
    C
    er
    Illinois Pollutio
    ontrol Board
    19—
    173

    Back to top