ILLINOIS POLLUTION CONTROL BOARD
    July II, 1974
    MACEDONIA BAPTIST CHURCH
    )
    )
    PCB74-246
    ENVIRDNbCNTAR PROTECTION AGENCY
    ORDER OF THU BOARD (by Mn Dumelle):
    Petition filed July 1, 1974 is inadequate in that it
    does not gibe the rEasons for, the
    ban
    on sewer construction
    nor does it give the extent and frequency of downstream
    basement flooding, if anyr nor does it explore alternatives
    such as holding tanks for use during wet weathen
    Petitioner shall file an amended petition within 45 days
    fror tie date of thas Order pro .r3,ds-g
    rrfcrrancr as nsted
    above~ The 9elday period set by stat.ute ft.r decision shall.
    no from tie dete of fn~~mgof toe arenled per~nor Patire
    to timely file the amended petition shall.. make~td:elldtitl.on
    liable to dismissal for inadeciuacy~
    IT IS S•O OPdDEP~EDe
    I, Christen
    ha
    Moffett, Clerk of the Illinois Pollution
    COntrol Board, hereby certify that the above Order was adopted.
    thisj~fl
    day of July, 1974 by a vote of
    SIC
    13
    53

    Back to top