ILLINOIS POLLUTION CONTROL BOARD
    May 23, 1974
    )
    INTERCRAFT INDUSTRIES CORPORATION
    )
    )
    )
    v.
    )
    PCB 74-185
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed May 20, 1974 is inadequate in that it
    does not give the Rule or Regulation (by number) from which
    variance is requested nor does it quantify the environmental
    impact in terms of suspended particulate matter that a grant
    of the variance would cause.
    Petitioner shall file additional information as detailed
    above within 35 days from the date of this order. Failure to
    timely file the needed information shall make the petition
    liable to dismissal for inadequacy. The 90-day decision period
    set by statute shall run from the date of filing the additional
    information.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the ~
    day
    of May, 1974 by a vote of _____________________________
    ristan L.
    Moffe
    Clerk
    Illinois Pollution control Board

    Back to top