ILLINOIS POLLUTION CONTROL BOARD
May 23, 1974
)
INTERCRAFT INDUSTRIES CORPORATION
)
)
)
v.
)
PCB 74-185
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
ORDER OF THE BOARD (by Mr. Dumelle):
Petition filed May 20, 1974 is inadequate in that it
does not give the Rule or Regulation (by number) from which
variance is requested nor does it quantify the environmental
impact in terms of suspended particulate matter that a grant
of the variance would cause.
Petitioner shall file additional information as detailed
above within 35 days from the date of this order. Failure to
timely file the needed information shall make the petition
liable to dismissal for inadequacy. The 90-day decision period
set by statute shall run from the date of filing the additional
information.
IT IS SO ORDERED.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the ~
day
of May, 1974 by a vote of _____________________________
ristan L.
Moffe
Clerk
Illinois Pollution control Board