ILLINOIS POLLUTION CONTROL BOARD
    March 28, 1974
    )
    CITY OF NASHVILLE
    )
    )
    )
    v.
    )
    PCB 74-114
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER OF THE BOARD (by Mr. Dumelle):
    Petition filed March 27, 1974 is inadequate in that it gives
    only a conclusory statement attributed to the consulting engineers
    as to the $3,000 to $4,000 cost of obtaining a permit.
    Petitioner is ordered to submit a verified statement from
    the engineer detailing the unit costs utilized to arrive at this
    estimate. A general description of the site as to soil
    and
    sub-
    surface characteristics and the location of aquifers or water-
    courses is also needed by the Board in order to weigh possible
    environmental effects.
    The information listed above shall be submitted within 35
    days from the date of this order. Failure to timely file the
    information shall make the petition 1iab1e~to dismissal for in-
    adequacy.
    The 90-day decision period set by statute shall run from
    the date of filing of the additional information requested.
    IT IS SO ORDERED.
    I, Christan L. Moffett, Clerk of the Illinois Pollution Cpntrol
    Board, hereby certify the above Ordei was adopted on the
    ~
    day ~ March, 1974 by a vote of __________________________
    Illinois Pollution
    1 Board
    11 —72~