ILLJNOIS POLLUTION CONTROL BOARD
    July 19, 1973
    )
    ROBE RT L
    .
    H
    EA)
    )
    )
    V.
    )
    PCB 73-293
    EN\T
    I RONHENTAL PROTECTION AGENCY
    )
    )
    I NTERT H ORDER OF THE BOARI) (by Mr
    .
    Dumel le)
    The petition
    filed July 1, 11973 with the Agency and July 16,
    1973
    with
    the Board is inadequate because
    it
    does not discuss the
    alternative of construction of a new septic system. Cost estimates
    for
    this alternative, the actual area and terrain of the lot, and
    the suitabi1~tyof the land for a seepage field should be provided
    to the Board within 30 days.
    Petitioner should also file a waiver of the 90-day decision
    periodf or
    the time
    which
    elapses untilL
    the
    additional information
    is
    filed.
    Failure
    to file within
    the
    30 day period shall make the
    petition liable
    to dismissal for inadequacy.
    IT IS SO ORDERED.
    I, Christian L.
    Moffett,
    Clerk
    of the
    Illinois
    Pollution Control
    Board,
    hereby
    certify the above Interim Order was adopted on the
    /~~
    I
    Ltay ol July, 1973 by
    a vote of __________________________________
    Christan L. Moffett, clerk
    Illinois Pollution Control Board