ILLJNOIS POLLUTION CONTROL BOARD
July 19, 1973
)
ROBE RT L
.
H
EA)
)
)
V.
)
PCB 73-293
EN\T
I RONHENTAL PROTECTION AGENCY
)
)
I NTERT H ORDER OF THE BOARI) (by Mr
.
Dumel le)
The petition
filed July 1, 11973 with the Agency and July 16,
1973
with
the Board is inadequate because
it
does not discuss the
alternative of construction of a new septic system. Cost estimates
for
this alternative, the actual area and terrain of the lot, and
the suitabi1~tyof the land for a seepage field should be provided
to the Board within 30 days.
Petitioner should also file a waiver of the 90-day decision
periodf or
the time
which
elapses untilL
the
additional information
is
filed.
Failure
to file within
the
30 day period shall make the
petition liable
to dismissal for inadequacy.
IT IS SO ORDERED.
I, Christian L.
Moffett,
Clerk
of the
Illinois
Pollution Control
Board,
hereby
certify the above Interim Order was adopted on the
/~~
I
Ltay ol July, 1973 by
a vote of __________________________________
Christan L. Moffett, clerk
Illinois Pollution Control Board
3
*
573