ILLINOIS POLLUTION CONTROL BOARD
July 31, 1973
ILLINOIS POWER COMPANY,
HENNEPIN GENERATING STATION,
)
UNIT NO. 1,
Petitioner,
v.
)
PCB 73—231
ENVIRONMENTAL PROTECTION AGENCY,
Respondent.
OPINION AND ORDER OF THE BOARD (by Mr. Seaman):
On July 5, 1973, Petitioner, Illinois Power Company, filed with
this Board its Petition to Extend Variance. Petitioner operates an
electric power generating station known as the Hennepin Station
located in Putnam County, Illinois. Petitioner, on July 14, 1972,
filed a Petition for Variance for Unit 1 of its Hennepin Electric
Generating Station. That Petition sought a variance to permit the
operation of Unit 1 in excess of current particulate standards
during those very limited periods when Unit 2 or its precipitator
were inoperative, gas was unavailable and the output of Unit 1 was
necessary for the reliability of electric service.
On October 10, 1972, based on the Petition and other submissions,
this Board entered its Order granting the variance, subject to
certain specified conditions,, for Unit 1 until October 10, 1973, sub-
ject to extension until June 30, 1974 (PCB71—l93).
Petitioner alleges that it has complied with all the conditions
of the original Order. Operation of Unit 1 in reliance upon the
variance has been very rare and work is continuing on schedule for
the precipitator on Unit 1. Petitioner believes, barring unforeseen
occurrences beyond Petitioner’s control, that the precipitator for
Unit 1 can be completed by June 30, 1974.
The Agency is of the opinion that Petitioner has complied with
all applicable conditions set forth in the Board’s Order in PCB72-297.
Further, the Agency is of the opinion that Petitioner is on schedule
for the installation of an electrostatic precipitator on Unit 1.
Petitioner’s control program should put Unit 1 into compliance
with the standards set forth in Rule 203(g) of Chapter 2, Part II
of the Pollution Control Board’s regulations. Petitioner’s sulfur
dioxide emissions are presently under the 6.0 lb/b6 BTU standard
set f0rth in Rule 204. The Agency has received no comment from the
public concerning this variance.
This Opinion constitutes the findings of fact and conclusions
of law of the Board.
8—687
—2—
IT IS THE ORDER of the Pollution Control Board that variance
be granted for the continued operation of Petitioner’s Unit 1
until June 30, 1974, subject to the following conditions:
1) All applicable conditions contained in the Board’s
Order in PCB72-297 shall remain in full force and effect.
2) Within thirty (30) days of the completion and startup
of Unit 1, Petitioner shall have performed a stack test on Unit 1.
Within five days of the date of said test, Petitioner shall notify
the Agency of the date and time of said test and allow Agency
observation if desired. Petitioner shall submit the results of
said test to the Agency as soon as they are available.
I, Christan L. Moffett, Clerk of the Illinois Pollution Control
Board, certify that
the
above Op~nionand Order
was
adopted by the
Boa,rd
on
the ~~day of ~
l973~by
a ~7ote
_~L_to
0
“I