ILLINOIS POLLUTION CONTROL BOARD
August 30, 1973
)
BENJAMIN HARRIS ?~ COMPANY
)
)
)
v.
)
PCB 73-215
)
)
ENVIRONMENTAL PROTECTION AGENCY
)
)
ORDER OF
THE
BOARD (by Mr. Durnelle)
It is the Order of the Board that:
1. Variance is granted from Rules 2-2.54 and 3-3.111 to operate
the cupola, rotary furnace and two crucible furnaces until
February 1, 1974 provided however that the cupola and rotary
furnaces shall never be operated simultaneously during the
term of the variance.
2. Petitioner shall report monthly beginning October 1, 1973 to
the Agency the time and duration of usage of the equipment
listed in No. 1 above and the weight and type of materials.
processed by each cupola or furnace listed above.
3. Petitioner shall accomplish “Phase One” and “Phase Two” of
its program as listed in the variance petition. All gas
flow and analysis data shall be submitted to the Agency within
three (3) days of receipt of it by the petitioner.
4. The Agency shall issue permits necessary to accomplish “Phase
One” and “Phase Two”.
5. Petitioner shall
exert all efforts to obtain engineering data
(especially gas flow) in the time of this variance in order to
be prepared to
install proper control equipment should the
variance be extended.
IT IS SO ORDERED.
I, Christan L. Noffett, Clerk of the Illinois Pollution Control
Board, hereby certify the above Order was adopted on the
Jo~’
day of August, 1973 by a vote of
3—o
Christan L. Moffett,Q~4lerk
Illinois Pollution L~’ntrol Board
9
*