BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    )
    IN THE MATTER OF:
    )
    )
    AS 08-10
    RCRA DELISTING ADJUSTED STANDARD
    ) (Adjusted Standard - Land)
    PETITION OF PEORIA DISPOSAL COMPANY
    )
    )
    COMMENTS OF PEORIA FAMILIES AGAINST TOXIC WASTE AND
    HEART
    OF ILLINOIS SIERRA CLUB
    Peoria
    Families Against Toxic Waste ("PFATW"), and Heart of Illinois Sierra Club
    ("Sierra Club")(collectively "Opposition Groups"), by and through their attorneys,
    Hasselberg, Williams, Grebe, Snodgrass & Birdsall, respectfully state and submit the
    following regarding the above-captioned Petition of the Peoria Disposal Company
    ("PDC") for a RCRA delisting adjusted standard ("Petition"):
    INTRODUCTION
    Despite
    its long history of operations at this location, the first time PDC ever had
    to seek local siting authority under Section 39.2 for the instant pollution control facility
    was on November 9, 2005, when it filed an application with the Peoria County Board for
    site location approval for a vertical and horizontal expansion of Petitioner’s hazardous
    waste facility located in Peoria, Illinois. The PDC facility is the only one of its kind in
    Illinois, and is located adjacent to the only regulated recharge area in Illinois. The
    existing PDC facility, towers over residences a mere 200 feet away, is adjacent to the
    City of Peoria, and has 53,190 people living within 3 miles of its site. The Peoria County
    Board found that PDC had not established that the facility was needed, was so located
    and planned to be operated as to be protective of the health, safety and welfare of the
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    2
    public, and was incompatible with the surround area and property. The Illinois Pollution
    Control Board ("Board") affirmed that denial of local siting authority in PCB 06-184.
    Thereafter, PDC filed a permit modification application with the IEPA in an
    attempt to expand its PDC No. 1 Landfill. The IEPA denied the permit modification and
    this Board affirmed that denial in PCB 08-25 and ruled that PDC needed local siting
    authority before any such permit modification (expansion) would be allowed.
    Now, PDC is attempting yet again to extend the life of its hazardous waste facility
    on the doorstep of Peoria, this time by seeking an adjusted standard to delist electric
    arc furnace dust it treats in its waste stabilization facility. As participants in PDC's siting
    attempt and permit modification attempt (as well as in several other PDC matters
    involving the PDC No. 1 Landfill), the Opposition Groups believe that their views in the
    form the comments contained herein would be beneficial to the Board.
    The Petition should be denied where: the proposed adjusted standard is
    inconsistent with the suitability of location factors contained in Section 27(a) of the Act;
    the complete information on the contemplated future permit modifications attendant to
    the purported delisting were not presented by the Petitioner to the Board; local siting
    authority is required for the changes proposed to the facility in the delisting Petition; and
    significant shortcomings in the technical justification in the Petition warrant its denial.
    I.
    PROPOSED ADJUSTED STANDARD INCONSISTENT WITH SECTION
    27(a) OF THE ACT AND UNJUSTIFIED
    Section 28.1(a) of the Act states that "[a]fter adopting a regulation of general
    applicability, the Board may grant, in a subsequent adjudicatory determination, an
    adjusted standard for persons who can justify such an adjustment consistent with
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    3
    subsection (a) of Section 27 of this Act." 415 ILCS 5/28.1(a). Section 27(a) of the Act
    in turn states, in pertinent part:
    In promulgating regulations under this Act, the Board shall take into
    account the existing physical conditions, the character of the area
    involved, including the character of surrounding land uses, zoning
    classifications, the nature of the existing air quality, or receiving body of
    water, as the case may be, and the technical feasibility and economic
    reasonableness of measuring or reducing the particular type of pollution.
    The generality of this grant of authority shall only be limited by the
    specifications of particular classes of regulations elsewhere in this Act.
    415 ILCS 5/27(a).
    The Illinois Supreme Court interpreted the Section 27(a) factors and the phrase
    that the Board shall "take into account" those factors to mean that the Board must
    "'allow for, make allowance for, weigh carefully, consider, take into consideration, bear
    in mind, remember, realize, appreciate, have in one's mind.' [Citation]". Granite City v.
    Illinois Pollution Control Board, 155 Ill. 2d 149, 613 N.E.2d 719,733-34, 184 Ill. Dec.
    402, 416-17 (1993).
    As the Board noted in footnote 4 of its Order entered September 4, 2008 in this
    cause, the instant delisting Petition is the third recent proceeding before the Board
    regarding PDC and PDC's Peoria hazardous waste facility. RCRA Delisting Adjusted
    Standard Petition of Peoria Disposal Company, AS 08-10, slip op. at 12, note 4
    (September 4, 2008). On June 21, 2007, the Board affirmed the Peoria County Board's
    decision to deny siting approval of PDC's application to site an expansion of PDC's
    hazardous waste landfill. PCB 06-184; PDC v. The Illinois Pollution Control Board and
    County of Peoria, No. 3-07-0435 (3d Dist.), appeal pending. On January 10, 2008, the
    Board affirmed the IEPA's denial of PDC's application for a Class 3 modification of its
    RCRA Part B permit to allow the expansion necessary to construct a proposed residual
    waste landfill at PDC's hazardous waste landfill. PCB 08-25; PDC v. Illinois Pollution
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    4
    Control Board and Illinois Environmental Protection Agency, No. 3-08-0030 (3d Dist.),
    appeal pending. The Opposition Groups participated as objectors at the local siting
    hearing before the Peoria County Board and in proceedings before the Board in PCB
    06-184, and participated as objectors at the permit modification hearing before the IEPA
    and in proceedings before the Board in PCB 08-25.
    In addition to the two (2) other cases identified by the Board in its September 4,
    2008 order, PDC's hazardous waste facility was most recently before the Board in a
    third-party appeal of the IEPA's renewal on November 27, 2007 of PDC's RCRA Part B
    permit (based on PDC's 1997 renewal application). Tom Edwards v. Peoria Disposal
    Company and Illinois Environmental Protection Agency, PCB 08-42. In addition to the
    foregoing, PDC unsuccessfully applied to the IEPA in the summer of 2006 for a Class 2
    permit modification to allow expansion of its hazardous waste landfill. See Illinois EPA
    Response to Public Comments on the Draft RCRA Permit Renewal for Peoria Disposal
    Company of Peoria, Illinois November 2007, Response to Comment 9, pp. 43-44, in
    record in PCB 08-42.
    The Board should, and must, "take into account" the Section 27(a) factors, and in
    so doing, "remember, realize" and "appreciate" the factual record and prior findings by
    this Board in the three (3) recent cases involving the same Petitioner, the same
    hazardous waste facility and site, the same waste stream, and the same intent of the
    Petitioner to evade the application of local siting review. See PCB 06-184 (siting
    appeal); PCB 08-25 (permit appeal); and PCB 08-42 (permit appeal); 415 ILCS 5/27(a);
    Granite City v. Illinois Pollution Control Board, 155 Ill. 2d 149, 613 N.E.2d 719,733-34,
    184 Ill. Dec. 402, 416-17 (1993).
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    5
    The instant delisting Petition is brought in the midst of a perfect storm of recent
    evidence and findings related to the identical site. Bear in mind that several of the
    Section 27(a) factors are equivalent to several corresponding local siting review factors
    found in Section 39.2(a). Section 27(a) requires the Petitioner to justify its proposed
    adjusted
    standard consistent with "the existing physical conditions, the character of the
    area involved, including the character of the surrounding land uses, zoning
    classifications . . ." 415 ILCS 5/27(a)(emphasis added). Section 39.2(a) requires the
    petitioner to demonstrate
    that the proposed facility "is so designed, located
    and
    proposed to be operated that the public health, safety and welfare will be protected,"
    and "is located so as to minimize incompatibility with the character of the surrounding
    area and to minimize the effect of the value of surrounding property." 415 ILCS
    5/39.2(a)(ii) and (iii)(emphasis added). Both Sections 27(a) and 39.2(a) require the
    appropriate governing body, the Peoria County Board and this Board, respectively, to
    determine whether the petitioner produced sufficient evidence to satisfy these nearly
    identical criterions. We acknowledge that the previous three (3) PDC cases before the
    Board are "separate and distinct" from the instant delisting Petition. RCRA Delisting
    Adjusted Standard Petition of Peoria Disposal Company, AS 08-10, slip op. at 12, note
    4 (September 4, 2008). However, application of Section 27(a) to this instant delisting
    Petition makes taking the other cases into account, especially the siting appeal in PCB
    06-184, mandatory, highly relevant, material, and in fact, dispositive to the outcome of
    this instant case.
    This Board is authorized by Section 27(a) to remember its prior factual and legal
    findings regarding the location and operation of the facility. The Board affirmed the
    Peoria County Board's findings that the site was not so located as to be protective of the
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    6
    public health, and was incompatible with the surrounding area. The Board should apply
    those findings and rule that the Petition is inconsistent with Section 27(a) and
    unjustified. Even if the Board determines, after taking into account its prior findings and
    rulings in the related PDC cases, that failure to satisfy Section 39.2(a) criterion is not
    dispositive in the context of Section 27(a) consistency factors, PDC's delisting Petition
    still is unjustified where PDC has failed to present any evidence about how its
    operations after purportedly obtaining an adjusted standard will affect the existing
    physical conditions and surrounding area of the facility.
    Despite the clear mandate of Section 27(a) to address location and surrounding
    land uses and character, PDC's delisting Petition is silent about the location, the
    character of the area, and whether operations at the facility, upon the purported granting
    of the adjusted standard, will affect the surrounding area. In local siting review,
    compatibility cannot be established based upon a pre-existing facility. CDT Landfill
    Corp. v. City of Joliet, PCB 98-60, slip op. at 17, citing Waste Management of Illinois v.
    PCB, 123 Ill. App. 3d 1075, 463 N.E.2d 969, 979, 79 Ill. Dec. 415, 425 (2d Dist. 1984).
    So too in the instant delisting Petition, consistency should not be allowed to be
    established based on a pre-existing facility. Regardless, PDC's Petition and related
    submissions are insufficient to establish consistency with the areas surrounding its
    facility. PDC included no information on how its operations after the purported granting
    of the adjusted standard would impact the surrounding area.
    A cursory review of the Petition and supporting technical documents reveal
    several contemplated operations which will directly and negatively impact the location
    and the surrounding areas. For example, the "Treated Residue Storage" section of the
    Technical Support Document indicates that treated residue will be placed in rolloff
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    7
    boxes or 168-cubic yard
    1
    gondola-type rail boxes and containers and stored "within the
    footprint of the PDC No. 1 Landfill." Tech. Supp. Doc., p. 3-12. In the "Miscellaneous
    Other Waste Management Units" section, it identifies a "Rolloff Staging/Container Area"
    unit and references it as being illustrated on Figure 5, the Site Layout. However, Figure
    5 does not contain any reference to where the containers of treated residue will be
    stored, other than identifying the entire PDC No. 1 Landfill. Given that one (1) gondola
    container can hold approximately at least one (1) batch (a day's output of EAFDSR),
    and each can be stored for up to sixty (60) days, there could be well over sixty (60)
    containers in storage at any one time, somewhere within the footprint of PDC No. 1
    Landfill.
    2
    The "EAFDSR Load-Out for Disposal" section of the Technical Support
    Document indicates that EAFDSR "will be removed from the gondola-type boxes using
    a track-type excavator and loaded into tractor-dump trailer combinations." Tech. Supp.
    Doc., p. 3-12. The "Process Materials" section then acknowledges "the potential for
    fugitive dust emissions when offloaded at the active landfill face," but is silent for
    whether that same potential exists during the "load-out for disposal." Tech. Supp. Doc.,
    p. 3-16. With the existing character of the area containing residences within 200 feet of
    the landfill, PDC has not supplied any information that its proposed operations will not
    impact the surrounding areas involved. That PDC requested storage time limits to be
    increased from 15 to 60 days as part of its recent permit renewal indicates that, for
    whatever reasons, PDC desired significant leeway to store containers within PDC No. 1
    Landfill. See PDC's IEPA Hazardous Waste Management RCRA Part B Permit issued
    November 27, 2007, Special Conditions E.11.a and E.12.A. The IEPA implied that PDC
    1
    See PDC's IEPA Hazardous Waste Management RCRA Part B Permit issued November 27, 2007, page
    I-1, indicating maximum containment volume of containers for storage is 138.7-cubic yards.
    2
    See PDC's IEPA Hazardous Waste Management RCRA Part B Permit issued November 27, 2007, page
    I-1, indicating maximum number of containers for storage is presently ten (10).
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    8
    could even increase the accumulation period further to the 90 days allowed the initial
    waste generators. See Illinois EPA Response to Public Comments on the Draft RCRA
    Permit Renewal for Peoria Disposal Company of Peoria, Illinois November 2007,
    Response to Comment 3, p. 78, in record in PCB 08-42. Certainly storage of containers
    should not be allowed over capped cells in PDC No. 1 Landfill; nor should they be
    allowed in any part of any active cell.
    Please reference the multiple and detailed public comments submitted by
    numerous members of the Opposition Groups for additional, specific examples of PDC's
    contemplated operations which will directly and negatively impact the location and the
    surrounding areas.
    Furthermore, PDC proposes to be allowed to accept EAF from at least ten (10)
    steel mills in Illinois, Wisconsin, Iowa, Kentucky, Indiana and Nebraska. See Hearing
    Exhibit 4. At least sixty percent (60%) of the EAF proposed to be accepted by PDC
    comes from out-of-state steel mills. PDC could accept more EAF from additional mills,
    potentially from a wide universe of potential sources in the Midwest and beyond. The
    recently renewed RCRA Part B Permit does not limit the amount of EAF residue that
    can be produced by PDC, nor does it limit PDC's hours of operation of its waste
    stabilization facility, and in fact allows the waste stabilization facility to operate 24 hours
    a day ("At the end of each eight hour shift, the Permittee shall clean the areas heavily
    trafficked during transport of waste to and from the mixing unit . . ." See PDC's IEPA
    Hazardous Waste Management RCRA Part B Permit issued November 27, 2007, Page
    X-5). PDC is not a typical generator. Unlike a steel mill which necessarily has
    generation limits as part of its operating permits, conceptually, PDC has none (other
    than the practical limitation of how much can be treated in the currently permitted waste
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    9
    stabilization facility in a 24 hour period). The Petition does propose capping the
    amount of EAFDSR created at PDC to 142,500 tons per year, based on maximum
    annual gate receipts of 95,000 tons of EAF. See Technical Support Document, pp. 2-2
    and 2-3. However, nothing prevents PDC from seeking to have that cap lifted in the
    future to link the EAFDSR quantity to the actual amount of waste purportedly generated
    by PDC. See Petition of Keystone Steel and Wire Co. for Hazardous Waste Delisting,
    AS 91-1, Supplemental Order, April 23, 1991, slip. Op. at 3. It is this analysis that turns
    the intent of a delisting on its head as being unrelated to a hazardous waste generated
    by a steel mill. In any event, capacity issues, and thereby container storage issues and
    truck traffic increases, among other things, directly impact the surrounding area.
    Finally, it is the stated legislative declaration that one of the purposes of the Act it
    to "restore, protect and enhance the quality of the environment, and to assure that
    adverse effects upon the environment are fully considered and borne by those who
    cause them." 415 ILCS 5/2(b). In this context, the Board is authorized to "determine,
    define and implement the environmental control standards in the State of Illinois . . .."
    415 ILCS 5/5(b). The people of the Peoria locality in general, and the people living in
    the area surrounding the PDC facility in particular, would be negatively impacted by
    allowing this delisting so that hazardous waste from at least five (5) states other than
    Illinois could be processed by PDC. Any Board finding that accepting PDC's claim that
    its EAFDSR will be generated or managed in Illinois elevates form over substance and
    would run contrary to the intent of the waste delisting regulations where it is the stated
    purpose of the Act as a whole that hazardous waste disposal and treatment obligations
    should be borne by those who initially generate it. 35 Ill. Adm. Code 720.122(p).
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    10
    II.
    CONTEMPLATED FUTURE PERMIT MODIFICATIONS SHOULD BE
    PRESENTED TO BOARD AS PART OF DELISTING REVIEW
    PDC states several times in its petition that a permit modification will be needed
    to accommodate their new way of doing business should the adjusted standard be
    granted. PDC wants delisting first, without addressing exactly what permit modifications
    will be needed. The Board should see what permit modifications will be proposed in
    order to fulfill its duties under Section 27(a) regarding location, location, location. PDC's
    petition is therefore incomplete and its delisting unjustified.
    Pursuant to Section 703.271(c) of the RCRA Permit Program regulations, a new
    statutory requirement or regulation is cause to seek modification of an existing permit.
    35 Ill. Adm. Code 703.271(c). Each contemplated modification identified in the petition
    and Technical Support Documents (and those not identified) affects and directly impacts
    the existing physical conditions at the facility as a whole, and the character of the
    surrounding residential areas. As part of any permit modification request, however, the
    IEPA cannot consider the suitability of the facility location. 35 Ill. Adm. Code 703.273.
    Pursuant to Section 27(a) of the Act, these "suitability of the facility location" issues are
    within the mandatory charge of the Board to take into account, just like the suitability
    issues are forefront in the analysis of whether local siting authority should be granted
    pursuant to Section 39.2 of the Act. Where the facts in the underlying siting appeal and
    permit denial appeal, including those concerning location, proximity to population
    masses and presence of toxic substances, all relate to the suitability of the facility
    location, the Board should take them into account. PDC included no information on how
    its operations after the purported granting of the adjusted standard, or after obtaining a
    permit modification, would impact the surrounding area.
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    11
    The Board is the only decision maker which can determine whether the adjusted
    standard - which triggers permit modification - is justified by being consistent with the
    Section 27(a) factors. The delisting Petition has significant shortcomings and lacks a
    justification for not only the proposed adjusted standard being consistent with the
    Sections 27(a) factors, but also for the contemplated permit modifications arising out of
    said delisting. For the Board to refuse to hold the Petitioner accountable for
    contemplated permit modifications arising out of a purported delisting essentially places
    the IEPA in a vacuum, with no review or allowance for suitability of the facility location.
    III.
    LOCAL SITING AUTHORITY IS REQUIRED FOR THE CHANGES
    PROPOSED TO THE FACILITY IN THE DELISTING PETITION
    The proposed delisting Petition would create a new pollution control facility
    pursuant to Section 3.330 of the Act. PDC needs to go through the local siting approval
    process before the Petition can be granted.
    A.
    Section 3.330(b)(2).
    PDC is attempting to turn its PDC No. 1 Landfill
    waste disposal unit into a transfer station. 415 ILCS 5/3.500. PDC admits that its waste
    disposal capacity is quickly being used, and that PDC has engaged in the multiple
    matters before this Board because of the capacity reality. Even if PDC engages in a
    plan of action to delay achieving maximum disposal capacity to delay closure
    obligations, the facility will be transformed from a waste disposal site to a transfer
    station. If the delisting is granted, in the very near future, none of the EAF dust treated
    in the waste stabilization facility will be deposited in the PDC No. 1 Landfill. Container
    storage and truck traffic in and out of the facility will expand the facility from one of
    waste disposal to one of a waste transfer station.
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    12
    Although Section 3.330 (b)(2) speaks in terms of the area of expansion beyond
    the boundary of a currently permitted pollution control facility, the Illinois Supreme Court
    has held that these terms should not "be considered in a vacuum", but in the broader
    context of the landfill in question. In M.I.G. Investments, Inc. v. IEPA, 122 Ill. 2d 392,
    523 N.E. 2d 1, 119 Ill. Dec. 533 (1988), the court recognized the authority of local
    governmental units under Section 39.2 to "assess not merely the location of proposed
    landfills, but also the impact of alterations in the scope and nature of previously
    permitted landfill facilities." M.I.G. Investments, 523 N.E.2d 4. In the context of this
    instant delisting Petition, coming after numerous previous attempts by the Petition to
    expand its facility, the proposed alteration of the scope and nature of the facility is
    sufficiently expansive to warrant application of Section 3.300(b)(2) to the instant case
    and require local siting review pursuant to Section 39.2 of the Act.
    B.
    Section 3.330(b)(3).
    On numerous occasions in its Petition and Technical
    Support Document, PDC acknowledges that the EAFDSR is a new waste stream. See
    Technical Support Document, pp. 2-2, 2-3 ("PDC is not currently managing nor has it
    ever managed the petitioned waste in a land-based management unit."). The EAFDSR
    should still be considered, at a minimum even if the purported delisting is granted, a
    special waste. 415 ILCS 5/3.345. Since PDC is requesting approval to store and
    transfer, for the first time, the EAFDSR special waste, the proposed delisting creates a
    new pollution control facility. 415 ILCS 5/3.330(b)(3).
    A delisted waste is capable of being declassified from manifest and record
    keeping requirements if certain conditions are met, including that it not be a "special
    waste." However, if the delisted and proposed declassified waste still needs special
    precautions for its shipment and transportation, it is automatically deemed a special
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    13
    waste ("special handling waste" equals "special waste.") 415 ILCS 5/3.475(c); 35 Ill.
    Adm. Code 808.110 definition of "special handling waste."
    PDC's own Technical Support Document establishes that the EAFDSR is
    "special handling waste." The "Process Materials" section acknowledges "the potential
    for fugitive dust emissions when offloaded at the active landfill face," and would seem to
    indicate that that same potential exists during the "load-out for disposal." Tech. Supp.
    Doc., p. 3-16. Any handler of EAFDSR needs special instructions and information on
    how to handle it due to safety concerns different from normal household waste.
    PDC, the Board in its written questions to PDC and PDC in its answers, have
    addressed this potential in their filings. PDC relies on correspondence form Steve
    Nightingale of the IEPA in support of PDC's assertion of waste classification. However,
    the IEPA letter to PDC is incomplete, and even though IEPA knew the EAFDSR would
    be transferred to Indian Creek, it nonetheless fails to consider that PDC will be
    transporting something that needs added safety precautions during transit (special
    handling waste). Even thought the EAFDSR is declassifiable in concept, it flunks the
    test because of another definition that restores its "special waste" moniker. This is true
    even if the EAF dust is given a hazard ranking of zero, as long as it needs special
    handling.
    Therefore, EAFDSR constitutes a special waste not subject to declassification.
    Since PDC is requesting approval to store and transfer, for the first time, the EAFDSR
    special waste, the proposed delisting creates a new pollution control facility. 415 ILCS
    5/3.330(b)(3). In the alternative, should the Board find that the delisting Petition does
    not constitute a new pollution control facility, the Board should nonetheless find that
    EAFDSR is a special waste by virtue of the special handling waste moniker, subject to
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    14
    manifesting requirements, and transporter fee regulations adopted by the IEPA. See
    Petition of Stericycle, Inc. For An Adjusted Standard, AS 08-2, slip op. at 18 (August 21,
    2008)(Board lacks authority to grant adjusted standard from PIMW transporter fee
    regulations adopted by IEPA, citing Section 28.1 of the Act).
    IV.
    SHORTCOMINGS IN TECHNICAL JUSTIFICATION IN PETITION
    WARRANT DENIAL OF DELISTING REQUEST
    Please reference the multiple and detailed public comments submitted by
    numerous members of and retained consultants to the Opposition Groups for
    additional, specific examples of PDC's shortcomings in technical justification for
    its Petition.
    CONCLUSION
    Based
    on the foregoing, the delisting Petition of PDC should be denied in the
    entirety as unjustified on technical and substantive grounds.
    Peoria Families Against Toxic Waste
    and
    Heart of Illinois Sierra Club
    By: /s/ David L. Wentworth II
    One of Their Attorneys
    David L. Wentworth II
    Hasselberg, Williams, Grebe,
    Snodgrass & Birdsall
    124 SW Adams Street, Suite 360
    Peoria, Illinois 61602-1320
    Telephone: (309) 637-1400
    Facsimile: (309) 637-1500
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    15
    BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
    )
    IN THE MATTER OF:
    )
    )
    AS 08-10
    RCRA DELISTING ADJUSTED STANDARD
    ) (Adjusted Standard - Land)
    PETITION OF PEORIA DISPOSAL COMPANY
    )
    )
    NOTICE OF FILING
    The
    undersigned hereby certifies that the foregoing, Comments of Peoria
    Families Against Toxic Waste and Heart of Illinois Sierra Club, was filed on the 25th day
    of September, 2008, with the Illinois Pollution Control Board via electronic filing as
    authorized by the Clerk of the Illinois Pollution Control Board, and as further authorized
    by the Board in its Order entered in this cause on September 4, 2008.
    Peoria Families Against Toxic Waste
    and
    Heart of Illinois Sierra Club
    By: /s/ David L. Wentworth II
    David L. Wentworth II
    One of their attorneys
    David L. Wentworth II
    Hasselberg, Williams, Grebe,
    Snodgrass & Birdsall
    124 SW Adams, Suite 360
    Peoria, IL 61602
    Telephone: (309) 637-1400
    Facsimile: (309) 637-1500
    Electronic Filing - Received, Clerk's Office, September 25, 2008
    * * * * * PC # 301 * * * * *

    Back to top