ILLINOIS POLLUTION CONTROL BOARD
June 21, 2007
GATEWAY FS, INC.,
Petitioner,
v.
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
Respondent.
)
)
)
)
)
)
)
)
)
)
PCB 07-126
(UST Appeal)
(90-Day Extension)
ORDER OF THE BOARD (by G.T. Girard):
On June 6, 2007, the Board received a joint notice to extend the 35-day period within
which Gateway FS, Inc. (Gateway) may appeal a May 2, 2007 determination of the Illinois
Environmental Protection Agency (Agency). According to the joint notice, Gateway received
the Agency determination on May 5, 2007. The joint request was therefore timely filed.
See
415
ILCS 5/40(a)(1) (2006); 35 Ill. Adm. Code 101.300(b)(2), 105.406. The Agency’s determination
concerns Gateway’s leaking underground storage tank site located at “C” Avenue in Randolph
County. In the determination, the Agency accepted Gateway’s Corrective Action Plan but
modified the budget.
The Board extends the appeal period until September 7, 2007, as the parties request,
based on the May 5, 2007 decision receipt date.
See
415 ILCS 5/40(a)(1) (2006); 35 Ill. Adm.
Code 105.406. If Gateway fails to file an appeal on or before that date, the Board will dismiss
this case and close the docket.
IT IS SO ORDERED.
I, John T. Therriault, Assistant Clerk of the Illinois Pollution Control Board, certify that
the Board adopted the above order on June 21, 2007, by a vote of 4-0.
John T. Therriault, Assistant Clerk
Illinois Pollution Control Board