ORDER OF THE BOARD (by N.J. Melas):
Gateway FS, Inc. (Gateway) has appealed two determinations of the Illinois
Environmental Protection Agency (Agency) concerning the same property located at 201 East
Pine Street, Red Bud, Randolph County. For the reasons below, the Board accepts the appeals
and, on its own motion, consolidates them for hearing.
On January 9, 2007, Gateway timely filed a petition asking the Board to review a
November 30, 2006 Agency determination.
See
415 ILCS 5/40(a)(1) (2004); 35 Ill. Adm. Code
105.206(a). The Agency rejected Gateway’s amended Site Classification Work Plan Budget
concerning Gateway’s property located at 221 East Pine Street, Red Bud, Randolph County
(Incident Nos. 980020 and 980391). Gateway appeals on the grounds that the amended budget
includes necessary and reimbursable personnel based on the Agency’s request that Gateway
conduct further soil and groundwater investigation and evaluation.
On January 11, 2007, Gateway timely filed a second petition asking the Board to review
a December 2, 2006 Agency determination regarding the same property.
See
415 ILCS
5/40(a)(1) (2004); 35 Ill. Adm. Code 105.206(a). The Agency rejected Gateway’s amended
High Priority Corrective Action budget (Incident Nos. 980020 and 980391). Gateway appeals
on the grounds that the amended budget includes additional legitimate, reasonable, reimbursable
investigation and personnel costs.
Both petitions meet the content requirements of 35 Ill. Adm. Code 105.210. The Board
accepts the petitions for hearing.
Gateway has the burden of proof. 415 ILCS 5/40(a)(1) (2004);
see also
35 Ill. Adm.
Code 105.112(a). Hearings “will be based exclusively on the record before the Agency at the
time the permit or decision was issued.” 35 Ill. Adm. Code 105.214(a). Hearings will be
scheduled and completed in a timely manner, consistent with the decision deadline (
see
415
ILCS 5/40(a)(2) (2004)), which only Gateway may extend by waiver (
see
35 Ill. Adm. Code
101.308). If the Board fails to take final action by the decision deadline, Gateway “may deem
the permit issued.” 415 ILCS 5/40(a)(2) (2004). Currently, the decision deadline for
Gateway
2
FS, Inc., v. IEPA, PCB 07-59 is May 9, 2007, and the decision deadline for Gateway FS, Inc., v.
IEPA, PCB 07-61 is May 11, 2007 (the 120th day after the date the petition was filed with the
Board).
See
35 Ill. Adm. Code 105.114. The Board meeting immediately before both decision
deadlines is scheduled for May 3, 2007.
Unless the Board or the hearing officer orders otherwise, the Agency must file the entire
record of both determinations by February 12, 1007, which is the first business day following 30
days after Gateway filed the petition in Gateway FS, Inc., v. IEPA, PCB 07-61. 35 Ill. Adm.
Code 105.212(a). If the Agency wishes to seek additional time to file the record, it must file a
request for extension before the date on which the record is due to be filed. 35 Ill. Adm. Code
105.116. The record must comply with the content requirements of 35 Ill. Adm. Code
105.212(b).
IT IS SO ORDERED.
I, Dorothy M. Gunn, Clerk of the Illinois Pollution Control Board, certify that the Board
adopted the above order on January 26, 2007, by a vote of 4-0.
Dorothy M. Gunn, Clerk
Illinois Pollution Control Board