1. PETITIONER’S BRIEF

BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
WEBB & SONS, INC.,
)
)
Petitioner,
)
)
PCB No. 07-24
vs.
)
(UST Appeal)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
)
NOTICE OF FILING
TO:
Ms. Dorothy Gunn
Clerk of the Board
Illinois Pollution Control Board
100 W. Randolph Street
Suite 11-500
Chicago, IL 60601
PLEASE TAKE NOTICE that I have today filed with the Office of the
Clerk of the Illinois Pollution Control Board an original and nine copies of an
Petitioner’s Brief, copies of which are herewith served upon you.
Respectfully Submitted
WEBB & SONS, INC.,
Petitioner
BY: /S/
Jeffrey W. Tock
Dated: December 29, 2006
Jeffrey W. Tock
Harrington & Tock
201 W. Springfield Ave., Suite 601
P.O. Box 1550
Champaign, Illinois 61824-1550
Telephone: (217) 352-4167
vlb/Pleadings.jef/HDC/Webb&Sons-NoticeFiling2
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

 
BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
WEBB & SONS, INC.,
)
)
Petitioner,
)
)
PCB No. 07-24
vs.
)
(UST Appeal)
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
)
)
Respondent.
)
PETITIONER’S BRIEF
NOW COMES the Petitioner, WEBB & SONS, INC., by its attorneys, Harrington
& Tock, and, for its Brief in support of its Petition for Review of Illinois Environmental
Protection Agency’s Decision To Deny Petitioner’s High Priority Corrective Action Plan
Budget, states as follows:
I. Issue on Appeal
Were all or any portion of the Personnel Costs contained in Section G of the
Petitioner’s proposed Corrective Action Plan Budget reasonable and, therefore, in
compliance with the Illinois Environmental Protection Act?
II. Standard of Review
The Agency’s denial letter of September 12, 2006 in which it denied all personnel
costs as unreasonable frames the issue on appeal.
Pulitzer Community Newspapers, Inc.
vs. EPA
, PCB 90-142 (December 20, 1990). The Board’s review of the decision of the
Agency to deny all personnel costs is based upon the administrative record, the transcript
of the December 11, 2006 hearing, the exhibits admitted at the hearing and public records
1
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

available to the Board. It is the obligation of the Board to review the entirety of the
record to determine whether or not the Petitioner’s proposed Corrective Action Plan
Budget was in compliance with the Act.
Illinois Ayers Oil Company vs. IEPA
, PCB 03-
214, slip op. at 15 (April 1, 2004). The Board does not review the Agency’s decision
using a deferential manifest weight of the evidence standard.
IEPA vs. PCB
, 115 Ill.2d
65, 70, 503 N.E.2d 343, 345 (1986).
III. Applicable Statutes and Regulations
415 ILCS 5/57.7 (as amended by P.A. 92-735, sec. 5)
(c) Corrective Action.
(1) High Priority Site.
(B) If the owner or operator intends to seek payment from
the Fund, prior to performance of any corrective action
beyond that required by Section 57.6 and subsection (a) of
Section 57.7, the owner or operator shall submit to the Agency
for the Agency’s approval or modification a corrective action
plan budget which includes, but is not limited to, an
accounting of all costs associated with the implementation and
completion of the corrective action plan.
(4) Agency review and approval.
(C) In approving any plan submitted pursuant to Part (E)
of this paragraph (4), the Agency shall determine, by a
procedure promulgated by the Board under item (7) of
2
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

subsection (b) of Section 57.14, that the costs associated with
the plan are reasonable, will be incurred in the performance of
corrective action, and will not be used for corrective action
activities in excess of those required to meet the minimum
requirements of this title.
(E) For purposes of this Title, the term “plan” shall
include:
(iv) Any corrective action plan budget submitted
pursuant to subsection (c)(1)(B) of this Section.
35 Ill.Adm.Code 732.503(b) The Agency shall have the authority to approve,
reject or require modification of any plan, budget plan, or report it reviews. …. If the
Agency rejects a plan, budget plan or report, or requires modifications, the written
notification shall contain the following information, as applicable:
(1) an explanation of the specific type of information, if any, that the Agency
needs to complete the review;
(2) an explanation of the sections of the Act or regulations that may be violated if
the plan, budget plan, or report is approved; and,
(3) a statement of specific reasons why the sited sections of the Act or regulations
may be violated if the plan, budget plan or report is approved.
35 Ill.Admin.Code 732.505(c) A full financial review shall consist of a detailed
review of the costs associated with each element necessary to accomplish the goals of the
3
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

plan as required pursuant to the Act and regulations. Items to be reviewed shall include,
but not be limited to, costs associated with any materials, activities or services that are
included in the Budget Plan. The overall goal of the financial review shall be to assure
that costs associated with materials, activities and services shall be reasonable, shall be
consistent with the associated technical plan, shall be incurred in the performance of
corrective action activities, and shall not be used for corrective action activities in excess
of those necessary to meet the minimum requirements of the Act and regulations.
35 Ill.Admin.Code 732.606 Ineligible Corrective Action Costs.
(hh) Costs proposed as part of a Budget Plan that are unreasonable.
IV. Statement of Facts
By letter dated August 18, 2006, HDC Engineering, as engineers for the
Petitioner, submitted to the Agency (hereinafter referred to as the “Agency”) the High
Priority Corrective Action Plan and Budget for the Petitioner’s property. (Admin. Record
at Page 025.) The Budget was prepared on forms provided by the Agency. Section G of
the Budget pertains to personnel costs and consists of pages G-1 through G-3. (Admin.
Record at Pages 054 through 056; Petitioner’s Exhibit 1.) Section G is further broken
down in subgroups as follows: High Priority Investigation and Preliminary Costs; CAP
Implementation (dig and haul); Additional Well Monitoring/Well Replacement/TACO
Sample Collection; and CACR Report/HAAs/Reimbursements. Each one of those sub-
categories is further broken down by tasks to be preformed by each described position,
the number of hours to perform those tasks, the hourly rate each position shall be paid to
4
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

perform those tasks, and the total of each position cost as determined by multiplying the
hourly rate by the total number of hours.
By letter dated September 12, 2006, Harry Chappel, by and on behalf of the
Agency, notified the Petitioner that the Corrective Action Plan had been conditionally
approved with the Agency’s modifications as designated in that letter and further notified
the Petitioner that the Corrective Action Plan Budget had also been modified.
(Petitioner’s Exhibit 3; Admin. Rec. at Pages 001-005.) The letter of September 12, 2006
stated: “Based on the modifications listed in Section 2 of Attachment A, the amounts
listed in Section 1 of the Attachment A have been approved.” The budget amounts
actually approved as stated in Attachment A were as follows:
$ 4,329.97 Investigation Costs
$ 1,779.47 Analysis Costs
$
0.00 Personnel Costs
$ 1,000.00 Equipment Costs
$132,827.87 Field purchases and other costs
The explanation for not approving any personnel costs is set forth in paragraph 3 of
Section 2 of Attachment A to the Agency’s letter of September 12, 2006. That
explanation is as follows:
“$103,360.00 for personnel costs deemed unreasonable. Such costs are
ineligible for payment from the Fund pursuant to 35 Ill.Adm.Code
732.606(hh). The Agency is requesting an hourly breakdown of each task
performed by each job title in order to make a more thorough review of
the proposed personnel costs.”
The Petitioner has accepted the Plan modifications and Budget modification as to
investigation costs and field purchases and other costs and is not appealing those
5
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

modifications. The Petitioner’s appeal involves only the Agency’s denial of all personnel
costs.
Mr. Kevin Saylor testified at the hearing on December 11, 2006. Mr. Saylor is a
professional engineer employed by HDC Engineering. (Hrg.Trans. at Pages PP7-8.) Mr.
Saylor has prepared for submission to the Illinois EPA over fifty proposals for plans and
budgets. (Hrg.Trans. at Page 8.) Of those fifty budgets, only three of them were rejected
by the Agency in total as to personnel costs. Those three were this present appeal, a
previous Webb appeal (PCB 2005-183) and the Richard Gooden site (PCB 06-139).
(Hrg.Trans. at Page 9.)
Mr. Saylor identified Petitioner’s Exhibit 1 as Section G of the Corrective Action
Plan Budget proposal that had been submitted to the Agency. That Budget had been
prepared by Mr. Saylor. (Hrg.Trans. at Page 10.) Mr. Saylor testified that the hourly
rates for each personnel classification listed in Petitioner’s Exhibit 1 (Section G of the
Budget) were within the range of rates authorized by the Agency for each such position.
(Hrg.Trans. at Page 11.) When asked if the tasks to be performed by each position in
Exhibit 1 were similar for all corrective action plan projects and differ only by the size of
the project, Mr. Saylor replied that they were. Variations from one corrective action plan
budget to another depend upon the extent of the contamination, how many agreements
you may need and how much soil you are digging out. (Hrg.Trans. at Page 12.) There
was nothing unique or unusual about the field work involved with this corrective action
plan compared to other corrective action plans that Mr. Saylor has been involved with.
(Hrg.Trans. at Page 15.)
6
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

Mr. Saylor has been involved with the preparation of five other corrective action
plans that were approved by the Agency. The units costs, the costs of doing the dig and
haul, the high priority investigation, preliminary costs, and the various categories
contained in Exhibit 1 were substantially similar for each of the approved corrective
action plans and budgets and substantially similar to the proposed corrective action plan
and budget for the Webb site. (Hrg.Trans. at Page 16.) The budgets for those other plans
were approved by the Agency with some modification but, in each case, the Agency did
not totally reject all personnel costs (Hrg.Trans. at Page 17.)
Mr. Saylor testified that there have been two previous appeals involving the Webb
site. The first appeal involved a submission to the Agency for reimbursement of tank
removal and soil excavation under Section 731. The Agency denied reimbursement of
$77,000.00 of the cost submitted for reimbursement. The denial by the Agency of
$77,000.00 was appealed and, as a result of the appeal, the entire $77,000.00 was
recovered from the Agency. (Hrg.Trans. at Page 19-20.)
A second Webb appeal involved site investigation. A plan and budget was
submitted to the Agency for approval of Stage II site investigation. The plan was
approved by the Agency as well as most of the budget, but no personnel costs were
approved. At the request of the Agency, Mr. Saylor provided an exhaustive hourly by
task and by person breakout of the personnel costs for the Agency’s review. Once those
hourly breakouts were submitted to the Agency, the Agency cut roughly half of the
proposed personnel costs. Consequently, a second appeal was filed to regain the
personnel costs that were cut from the Stage II site investigation budget. As a result of
7
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

that appeal, all but $1,000.00 was funded for the personnel costs as originally proposed in
the budget. (Hrg.Trans. at Pages 21-22.)
Mr. Saylor referred to the request by the Agency as set forth in its letter of
September 12, 2006 denying all personnel costs as unreasonable (Petitioner’s Exhibit 3)
and testified that he was concerned that, even if he provided the hourly breakdown as
requested, the personnel costs would still be rejected as they had been for the Stage II site
investigation budget. Consequently, Mr. Saylor recommended appeal of the Agency’s
decision since, in his opinion, providing the hourly breakdown would not result in
approval of all personnel costs and the matter would end up being appealed anyway.
(Hrg.Trans. at Pages 29-30.) Mr. Saylor was also concerned about receiving approval
from Mr. Chappel as the unit manager to which the Webb case has been assigned. Of the
54 plans and budgets that Mr. Saylor had submitted to the Agency, 40 of those plans were
submitted to units other than Mr. Chappel’s and none of those units had ever requested a
breakdown of personnel costs on an hourly basis. (Hrg.Trans. at Page 32.)
Mr. James Malcom also testified at the December 11, 2006 hearing. Mr. Malcom
is employed by the Agency and has been so employed for 8 years as a project manager in
the LUST section. Mr. Malcom had reviewed the plans and budget for the corrective
action plan for Webb and prepared the LUST Technical Review Notes for that submittal
identified as Petitioner’s Exhibit 4. (Hrg.Trans. at Page 40.) Mr. Malcom felt that the
overall hours for the personnel as proposed in the budget were excessively high and
requested input from his unit manager, Mr. Chappel. (Hrg.Trans. at Page 41.) Although
Mr. Malcom actually prepared the September 12, 2006 letter from the Agency to Doris
8
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

Webb (Petitioner’s Exhibit 3), the content of that letter came from Harry Chappel and
other unit managers. (Hrg.Trans. at Pages 42-43.)
When Mr. Malcom was initially asked if he had an opinion as to what number of
hours should have been allowed under the corrective action plan budget for the position
of Senior Project Manager, his response was “not off-hand, but compared to other sites, it
… it was excessive.” The following exchange then took place:
“Q: You said compared to other sites, how do you do your review of a
budget to determine whether or not it’s an appropriate budgeted amount
and not too much?
A: The … the rates are set and the hours, you get a feel for what’s normal
or what you see on, you know, I’ve done lots and you can get a feel for
what’s the norm. (Hrg.Trans. at Page 44.)
Mr. Malcom also testified that he felt that the 84 hours proposed for the Professional
Engineer and the Engineer III were excessive based upon his experience. Mr. Malcom
also found excessive the number of hours proposed for Scientist III on page G3 and felt
that the hours should be reduced from 16 hours to 2 hours. (Hrg.Trans. at Page 47.)
Mr. Malcom testified that there were acceptable ranges for the different personnel
positions identified in the Petitioner’s proposed budget. For the project review and
oversight and supervision to be performed by the Senior Project Manager, Mr. Malcom
would have approved the budget for those tasks in a range from 60 to 100 hours. The
acceptable range of hours for the Professional Engineer for this project would have been
20 to 40 hours. The acceptable range for an Engineer III would have been under 50
hours. (Hrg.Trans. at Page 51.) The following exchange then took place with Mr.
Malcom:
“Q: You’ve identified four categories of personnel that were excessive …
A: Uh huh.
9
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

Q: … why not approve all of the other categories and either reduce the
hours for these four individuals and ask for an hourly breakdown on just
the four?
A: Because I wasn’t sure the hours associated with the appeals.
……
Q: There were about sixteen other line item personnel costs that you
found to be acceptable?
A: Sure, uh huh.
Q: Why not approve those sixteen and ask for additional breakdown in
terms of hours for the four personnel that you found objectionable?
A: It was Harry Chappel’s and the other supervisor’s decision.
Q: If it had been your decision, which way would you have done it?
A: I would have denied the … the four and approved the … the others.”
(Hrg.Trans. at Pages 53-54.)
This PCB Case No. 07-24 is actually the third appeal by the Petitioner pertaining
to actions taken by the Agency relative to LPC #0290255079 relative to the Petitioner’s
property at 1201 Dewitt Avenue, Mattoon, Illinois. Petitioner’s first appeal of a decision
of the Agency was filed as Case No. 04-105. As stated in the Petition for Review of
LUST Fund Reimbursement Decision in that matter on file with the Illinois Pollution
Control Board, the Petitioner requested review of the decision by the Agency regarding
reimbursement of the cost of removing soil during early action site remediation. The
Petitioner appealed the Agency’s decision to deduct $70,167.22 in expenses that the
Agency felt the Petitioner had failed to demonstrate were reasonable. That appeal was
settled between the parties and the case dismissed by Order of the Board entered
September 16, 2004.
The Petitioner’s second appeal was filed April 6, 2005 as Case No. 05-183.
(Petitioner’s Exhibit 2.) That appeal involved the Agency’s failure to approve as
submitted the Petitioner’s Budget for Stage II Site Investigation Activities. The
Petitioner’s engineers, HDC Engineering, had submitted to the Agency by letter dated
January 20, 2005 a proposed Site Investigation Stage II Budget. That Budget included
10
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

personnel costs of $17,610.00 under Section G and $1,500.00 for a survey under Section
I. By letter dated February 8, 2005, the Agency, by and through its unit manager, Harry
A. Chappel, informed the Petitioner that the proposed Stage II plan had been approved,
but that the budget had been modified. As shown on Attachment A to the February 8,
2005 letter, the Agency modified the Budget by not approving any personnel costs and by
deleting the cost of a survey.
By letter dated February 15, 2005, HDC Engineering, on behalf of the
Petitioner, responded to Mr. Chappel’s letter of February 8, 2005 by providing the
requested justification as to both the need for a survey and the breakdown of
hours of work to be performed by each designated person by title. By letter dated
March 2, 2005, the Agency, by and through Mr. Chappel, responded to HDC’s
Amended Site Investigation Plan Budget by approving a portion of the hours
proposed for three personnel by title and deleting three identified personnel all
together. The Agency, by and through Mr. Chappel, approved $9,704.00 of the
original $17,610.00 in personnel costs requested by the Petitioner’s engineers.
Consequently, the Petitioner filed its Petition as Case No. 05-183 seeking
approval on appeal of all of the personnel costs that had been proposed in the Site
Investigation Stage II Budget. As testified by Mr. Kevin Saylor, that appeal was
settled with the Petitioner’s Budget being approved in nearly the total amount of
the personnel costs as originally requested. Case 05-183 was dismissed by Order
of the Board on August 4, 2005 in response to the Petitioner’s Motion to
Voluntarily Dismiss. (Hrg.Trans. at Page 22.)
11
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

V. Argument
B. The Agency denied all the requested personnel costs pursuant to 35
Ill.Admin.Code 732.606(hh) as being “unreasonable”. Neither the Act nor the
regulations define what is meant by “reasonable”. The Agency took the position as stated
in the denial letter of September 12, 2006 that the Petitioner would have to expend
additional time and expense to provide an hourly breakdown of all of the work to be
performed by each one of the twenty personnel listed in section G of the Corrective
Action Plan Budget submitted by the Petitioner. (Petitioner’s Exhibit 1.) The Agency
stated that it could not make a determination as to whether or not the personnel costs
were reasonable with just the description of the tasks to be performed by each person
with the hourly rate and number of hours stated.
Except for those personnel identified as having been involved in the prior Webb
appeals (the Senior Project Manager, the Professional Engineer and the Engineer III as
listed under the sub-heading High Priority Investigation and Preliminary Costs), the
Agency had sufficient information within the Budget and the Plan to determine that all
other personnel costs
were reasonable and should have been approved. (Except for the
Scientist III under the CACR Report who Mr. Malcom would have reduced from 16
hours to 2 hours.) In order to approve a CAP budget, the Agency must determine that the
costs set forth in the budget are reasonable. (415 ILCS 5/57.7(c)(4)(C).) Except for the
limited personnel stated above, the personnel costs submitted by Petitioner were
reasonable and the personnel costs as so modified should have been approved without
further review by the Agency.
12
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

The “request” by Mr. Chappel for an hourly breakdown of each task performed by
each job title in order to make a more thorough review of the proposed personnel costs
was warranted only as to the Senior Project Manager, the Professional Engineer and the
Engineer III because the description of tasks for each such position included
compensation for the two previous Webb appeals. Although nothing in the applicable
statutes or regulations prohibited compensation for such activity from the LUST Fund,
Petitioner acknowledges that a breakdown of the hours allocated to the appeals would be
appropriate. Once the appeal hours are broken out, the total hours allocated strictly to the
CAP can be identified and approved by the Agency.
As to a determination of whether the personnel costs are reasonable for all other
positions and tasks identified in the Petitioner’s Exhibit 1, the Agency has admitted that
they are. Mr. Malcom, the manager assigned to the Petitioner’s project by the Agency,
has testified that he would have approved all personnel costs except the Senior Project
Manager, the Professional Engineer, the Engineer III under High Priority Investigation
and the Scientist III under CACR. (Hrg.Trans. at Page 54.) Mr. Malcom also testified
that he would approve the following range of hours for the rejected personnel:
Senior Project Manager
60-100 hours
Professional Engineer
20-40 hours
Engineer III
under 50 hours
Scientist III
2 hours
If Mr. Malcom can determine what is reasonable without an hourly breakdown of each
and every position, why can’t his supervisor, Mr. Chappel?
13
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

A definition of “reasonable” is “not excessive or extreme”. According to the
testimony of Mr. Chappel and Mr. Clay on behalf of the Agency that was filed in
Pollution Control Board cases R04-22 and R04-23, these men and the Agency have a
tremendous amount of experience in reviewing and analyzing budgets to determine what
is “reasonable” and what is “excessive or extreme”. The following statements of Mr.
Harry Chappel were contained in the testimony that he filed in the above rulemaking case
on March 8, 2004:
- He is a unit manager in the Leaking Underground Storage Tank Section with
the Bureau of Land of the Illinois Environmental Protection Agency and has
held that position since March of 2002.
- He was employed by the Agency from 1976 to 1995 and was the manager of
the LUST Section from 1991 to 1994.
- He received a B.S. degree in civil engineering from the University of Missouri
at Raleigh in 1975, and M.S. in thermal and environmental engineering from
Southern Illinois University at Carbondale in 1979 and became a registered
professional engineer in Illinois in 1979.
- From 1995 to 2001 he was in private practice as a co-owner in two
environmental consulting firms located in Springfield, Illinois. (Petitioner’s
Exhibit 8, Page 1.)
Mr. Chappel further testified pertaining to proposed modifications to Section
732.845 – Professional Consulting Services, as follows:
“This section provides limits for the fees that consultants may be
reimbursed for various tasks conducted as part of Leaking UST
remediation. The Illinois EPA has coordinated with the Consulting
Engineers Council of Illinois (CECI) to develop the activities that
14
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

are conducted by the consultant in each step of the process and the
estimated personnel time (hours) required for each activity within a
task. Once the hours required to perform a task and/or activity
were determined, the Illinois EPA developed an average hourly
rate to establish the limits specified in this section.” (Petitioner’s
Exhibit 8 at Page 5 and 6.)
Mr. Douglas W. Clay also submitted an affidavit of his testimony in the Pollution
Control Board cases R04-22 and R04-23. In the written testimony of Mr. Clay filed with
the Board on March 8, 2004, Mr. Clay testified to the following facts:
- Mr. Clay was the manager of the Leaking Underground Storage Tank section
within the Bureau of Land of the Illinois Environmental Protection Agency
and had held that position since September of 1994.
- There is a tremendous amount of time spent reviewing budgets and
reimbursement packages. The majority of plan and report denials,
amendments to plans and reports submitted by consultants, and appeals before
the Illinois Pollution Control Board are related to budget and reimbursement
issues, as opposed to technical issues.
- The proposed cost in subpart (H) were developed with input from the
consulting industry and other trade organizations plus nearly fifteen years of
agency experience administering the Leaking Underground Storage Tank
Reimbursement Program and are generally consistent with the rates the
Agency currently approves for reimbursement.
- Over the past fifteen years, the Agency has approved over one-half billion
dollars for reimbursement which involved reviewing over 12,800 budgets and
over 18,300 applications for payments. (See Petitioner’s Exhibit 7, Pages 1-
3.)
15
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

Mr. Clay again testified by affidavit before the Pollution Control Board in cases R04-
22(B) and R04-23(B). That testimony was filed March 1, 2006. Mr. Clay’s testimony
contains the following statement:
“Attached as part of my testimony (Attachments 1 and 2) are two
spreadsheets that include the scopes of work, the title of the personnel that
may perform the work, a reasonable number of hours for the identified
personnel to perform the work, and a comment field.
To develop this Attachment, the Agency convened a workshop made up of
the five LUST section unit managers, five senior LUST section project
managers, two senior LUST claims unit reviewers, and myself. This work
group has a combined 140 years of experience reviewing and evaluating
LUST sites. The information in Attachments 1 and 2 represent the
consensus of the work group.” (Petitioner’s Exhibit 8, Page 3.)
Although the Board found in the above rulemaking cases that the record did not
support proceeding with maximum lump sum payment amounts for professional
consulting fees associated with the clean-up of sites with leaking underground storage
tanks, dismissed the proceeding and closed the rulemaking docket by Order entered June
21, 2006, the testimony of Mr. Clay and Mr. Chappel is offered for the purpose of
showing the expertise and experience within the Agency. Specifically, within the last
fifteen years the Agency has reviewed over 12,800 budgets and over 18,300 applications
for payment and the senior management of the LUST section has a combined 140 years
of experience in reviewing and evaluating LUST sites. Considering all of that
experience, it was arbitrary, capricious and unconscionable for Mr. Chappel to have
failed to determine that each of the individual personnel costs identified in Section G of
the Petitioner’s Corrective Action Plan Budget (Petitioner’s Exhibit 1)
were reasonable
based upon the CAP Budget as submitted, except as to the Senior Project Manager, the
Professional Engineer and the Engineer III as to the previous appeals. It was reasonable
16
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

for Mr. Chappel to have requested an hourly breakdown only of the appeal work
performed by the Senior Project Manager, the Professional Engineer and the Engineer III
in order to make a more thorough review of the proposed personnel costs as to those
individuals.
VI. Conclusion
The Corrective Action Plan Budget submitted by Petitioner did not violate the
Illinois Environmental Protection Act. A determination could have been made and
should have been made by the Agency based upon the CAP and the budget that all
personnel costs in Section G of the Budget were reasonable as required by statute (415
ILCS 5/57.7(c)(4)(C)) except for the Senior Project Manager, the Professional Engineer
and the Engineer III under sub-heading High Priority Investigation and the Scientist III
under sub-heading CACR. There is absolutely no justification to “request” (demand) an
hourly breakdown of each task by each job title, except for those personnel seeking
payment for previous appeals.
WEBB & SONS, INC.,
Petitioner,
By: /S/
Jeffrey W. Tock
Dated: December 29, 2006
Jeffrey W. Tock
Harrington & Tock
201 W. Springfield Ave., Suite 601
P.O. Box 1550
Champaign, Illinois 61824-1550
Telephone: (217) 352-4167
17
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, DECEMBER 29, 2006

Back to top