1. BEFORE, THE ILLINOIS POLLUTION CONTROL BOARD
      2. JOYCE FARMS RECYCLING, INC.
      3. (Land-Permit Appeal)
      4. ILLINOIS ENVIRONMENTAL PROTECTION AGENCY,
      5. Respondent.
      6. APPEARANCE
      7. JOYCE FARMS RECYCLING, INC.
      8. CLAIRE
      9. MANNING,
      10. BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
      11. JOYCE FARMS RECYCLING, INC.
      12. Petitioner,
      13. PETITION FOR REVIEW OF ILLINOIS ENVIRONMENTAL
      14. PROTECTION AGENCY DECISION
  1. Permitted Landscape Waste Compost Facility
  2. Operating Plan
  3. February 2006
      1. PERMITTED LANDSCAPE WASTE COMPOST FAClLlTY
    1. OPERATING PLAN
  4. *******I
      1. 60MPOST MATUWJTV

BEFORE, THE ILLINOIS POLLUTION CONTROL BOARD
JOYCE FARMS RECYCLING, INC.
Petitioner,
1
V.
PCB
-
(Land-Permit Appeal)
)
ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY,
)
Respondent.
APPEARANCE
The undersigned attorneys hereby enter their appearance in this matter on behalf of
JOYCE FARMS RECYCLING, INC.
'1
&&a*
Brown
CLAIRE
Hay
A.
&
MANNING,
Stephens,
01
/
id-/
LLP
BROWN, HAY
&
STEPHENS, LLP
Claire
A.
Manning
Registration
No. 3 124724
Charles
Y. Davis
Registration No. 62860 10
205 S. Fifth Street, Suite 700
P.O. Box 2459
Springfield,
IL 62705-2459
(2 17) 544-849
1
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

BEFORE THE ILLINOIS POLLUTION CONTROL BOARD
JOYCE FARMS RECYCLING, INC.
Petitioner,
1
v.
)
PCB No. 06-
)
ILLINOIS ENVIRONMENTAL
)
PROTECTION AGENCY,
Respondent.
)
PETITION FOR REVIEW OF ILLINOIS ENVIRONMENTAL
PROTECTION AGENCY DECISION
NOW COMES
Petitioner,
JOYCE FARMS RECYCLING, INC,
by and through its
attorneys, Brown, Hay
&
Stephens, LLP, pursuant to the Illinois Environmental Protection Act,
414 ILCS
411 et seq. (the "Act") and 35 Illinois Administrative Code Section 105.400, et seq.,
hereby appeals certain decisions by the Illinois Environmental Protection Agency (the
"Agency").
1.
Joyce Farms Recycling, Inc. ("Petitioner") is
an Illinois corporation located in and
principally conducting business in
Kankakee County, Illinois.
2.
Petitioner is the owner of a composting facility, located on approximately 13.62
acres at 3000 N. Road, Essex, Illinois.
3.
On June 2, 2005, Petitioner filed for renewal of a permit to modify its existing
landscape waste compost facility with the Agency, which was scheduled to expire on September
1,2005. The permit renewal was docketed by the Agency as Log No. 2005-219.
4.
The Agency requested additional information in regards to renewing the permit,
and Petitioner promptly presented requested information to the Agency on several different
occasions.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

5.
On July 27, 2006, the Agency issued a letter granting permit number 2005-219
(the "Letter") to Home Star Bank, Trust
#883 as owner and Petitioner as operator, but set forth
several conditions not required by the Act or its implementing regulations, which are not
necessary to meet the provisions of the Act, and should not be an enforceable requirement of the
permit. The Letter is attached hereto and incorporated herein as
Exhibit A.
4.
Among the conditions which Petitioner appeals are:
(A)
CONDITION NUMBER 111.6:
"Leaves may be temporarily stored in the designated leaf storage areas or in the
cornposting area for use as a carbon source in the cornposting process, in windrows not
exceeding 6 ft.
4 inches in height and 12
ft.
in width.
Aisle spacing in the designated
carbon source leaf storage areas shall not be less than
8 ft. wide. Carbon source leaves
stored in windrows in the composting area shall have aisles that are a minimum of
8
ft.
wide. Incoming leaves to be stored as carbon source material, shall be processed as
necessary and placed into the designated storage areas within
24 hours after receipt.
Paper bags containing leaves shall be broken open prior to storage of the leaves.
All
leaves stored for use a as carbon source, shall be incorporated into composting material
within 9 months of their receipt."
(Exhibit
A, Pg.
1
1,76).
This condition relating to the storage of leaves in specified windrows is not required by the Act
or its implementing regulations. The Agency's inclusion of this condition causes an undue
burden on the Petitioner, adversely affects its ability to operate the facility, and is unnecessary
because it was not contemplated under the controlling Act or regulations. The inclusion of this
condition will unnecessarily require the reduction or removal of the current leaf pile, which is
used as a carbon source in the cornposting process. The evidence in the record does not support
any conclusion that the current configuration of the leaf pile causes a violation of the Act or
Board's rules.
(B)
CONDITION
NUMBER 111.7
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

"All screen overs generated from the screening of landscape waste or end-product
compost, shall be stored in the 0.5 acre designated screen overs storage area as shown in
Figure 1, of Application Log No. 2005-219, received February
9, 2006, until used in the
composting process or removed
fkom the site. Storage of screen overs shall be in
windrows not exceeding 6
ft. 4 inches in height and 12 ft. in width. Aisle spacing
between windrows in the designated screen overs storage area shall not be less than
8 feet
wide. The operator shall contain screen overs and prevent wind blown litter from the
stored screen overs. The windrows of screen overs shall be covered with end-product
compost, a compost cover fabric or wood chips as necessary to control litter dispersal
from the stored material. To prevent blowing litter during these operations, moveable
fencing shall be provided and positioned down wind of operations each time screen overs
in the storage area are removed or processed." (Exhibit
A.,
Pg., 12,77)
This condition relating to the screen overs is not required by the Act or its implementing
regulations. The Agency's inclusion of this condition causes an undue burden on the Petitioner,
adversely affects its ability to operate the facility, and is unnecessary because it was not
contemplated under the controlling Act or composting regulations.
The inclusion of this
condition will unnecessarily require the reduction or removal of composting material.
(C)
CONDITION NUMBER: 1.2
"The operator shall reposition the comer stakes of the facility by September 30, 2006.
The permittee shall locate and install the comer stakes to comply with the site
development plan measurements dated June 1, 2000 of Application Log No. 2000-138.
Upon completion, the permittee shall maintain the comer stakes and records of the survey
or GPS readings of the repositioned comer posts and calculated footage measurements
between posts based on these
GPS readings. These records shall be included in the
operating record and made available for inspection." (Exhibit A, Pgs. 4-5,
77)."
Emphasis added.
The Agency has provided no basis for its determination that the site of the composting operation,
which sits in the middle of the operator's own farm and farm ground is misconfigured and
requires resurveying. Further, there is no rationale or regulatory requirement for Petitioner to be
required to utilize Global Positioning System (GPS) survey equipment to adequately compute
the boundaries of the facility. The Agency is placing a burden on the Petitioner that it does not
place on other permittees, and is not reflected in the controlling Act or regulations.
In other
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

permits issued by the Agency which require surveying, and in Attachment A, Condition Number
16 of the subject permit, the Agency does not specify what type of survey equipment must be
utilized. It is customary in these matters for the Agency to require the use of survey equipment
adequate to perform the required task
(i.e., total station or GPS equipment) in order to compute
and generate certain measurements required under the Agency permits.
(D)
CONDITION NUMBER:
11.1
"Landscape waste may be received at this site from 6:00 am to 6:30 pm, Monday through
Friday and from
6:00 am to noon on Saturday. Machinery, trucks and equipment may
only be operated at the facility during these specified operating hours. If it becomes
necessary to accept waste or operate outside of the above schedule in response to an
emergency situation, documentation of the nature of the emergency shall be made and
verbal notice of the activity shall be provided to the Kankakee Planning Department
(8151937-2940) or Illinois EPA, Des Plaines Regional Office
(84712944000) on the
same day or if not possible on the next business day. Written notification of the
emergency shall be provided to the Illinois EPA and Kankakee County Planning
Department within 7 days of the incident." (Exhibit
A, Pg. 6,71).
The Agency's limit on operating hours is much different from Petitioner's proposed operating
plan and places a great burden on Petitioner's operations. The operating plan is attached hereto
and incorporated herein as Exhibit
B.
In the Petitioner's proposed operating plan, it was
proposed that the grinding operations would take place
6:00 am to 5:00 pm, Monday through
Friday, and
6:00 am to 4:00 pm on Saturday.
Id.
The operating plan also proposed hours for
trornrnelling/screening from 6:00 am to 11 pm, Monday through Friday, and 6:00 am to 6:00 pm
on Saturday. The Agency's conditions are not required by the Act or Board regulations and are
not otherwise necessary and they put a great burden on the Petitioner's operations.
(E)
CONDITION NUMBER: V.4
"The operator shall record the date, the actual or estimated weight of each load of landscape
waste received and estimated volume of each load of landscape waste received. The operator
shall perform these weights and measures during load checking at the ticket office or receiving
area, prior to unloading. Load weight shall be derived from dated weight tickets from semi
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

trailers and large trucks or trailers.
All estimated measurements shall include the daily
conversion factor used for the estimate either from weight to volume or volume to weight.
The
operator shall assess each truck or trailer load to determine compliance with local roadway
load limits.
Those records shall be maintained at the ticket office and made available for
inspection."
(Exhibit
A, Pg. 17,74). Emphasis added.
The Act and its implementing regulations do not in any way require that operators assure that
truck
and/or trailer drivers are in "compliance with local roadway load limits." Cmpliance with
local weight limits is the hauler's responsibility, not that of the operator. While the Petitioner
has willingly agreed to remind haulers about weight limits, it is not the Petitioner's responsibility
to assure that the haulers are in compliance. Further, without actual weighing of the trucks, it is
impossible to ascertain whether any individual truck delivering the landscaping waste is in
compliance with local roadway limits. The composting regulations were not designed to require
an operator to load check incoming trucks in order to ascertain their actual weight.
(F)
CONDITION NUMBER: 11.1 1
The permittee shall control insects, rodents and other vectors so as not to cause or contribute to
disease and nuisance conditions, including: a. The operator shall take preventative measures to
disrupt the life cycle of flies to prevent fly breeding locations and to control nuisance conditions
including:
2.
Fly Trap counts shall be made and recorded weekly
..."
(Exhibit
A,
Pg.
8,
7
1 1 (a) (2)).
Emphasis added.
The requirements regarding fly trap counts are vague and necessitate clarification by the Agency
for proper compliance. Further, they are not required by the Act or regulations or otherwise
required to ensure compliance with the Act. Moreover, the record does not establish an adequate
basis for the requirement to conduct "fly trap counts." The operator currently measures the
depth of flies in a fly trap, and records such measurements. As this condition is worded,
however, it appears that a one-by-one count of each fly in a fly trap is necessary. The
requirement of a one-by-one count would be an unnecessary burden on the Petitioner.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

(G)
EXPIRATION DATE: January 3 1,2008.
(Exhibit
A,
Pg. 11).
The composting regulations presume five year permits for composting operations. The
Agency has given no rationale to Petitioner for its requirement that the permit will expire only
one and a half (1
%)
years after its issuance. Petitioner requests that the permit expire five years
from the date it was petitioned for, as is typical under the regulations and Agency practice.
WHEREFORE, Petitioner, Joyce Farms Recycling, Inc., respectfully requests that the
Board enter an Order consistent with the foregoing specifically by deleting
andfor clarifying the
conditions set forth above.
Respectfully submitted,
BROWN, HAY
&
STEPHENS, LLP
Claire A. Manning
Registration No.
3 124724
Charles
Y. Davis
Registration No. 62860 10
205 S. Fifth Street, Suite 700
P.O. Box 2459
Springfield,
IL 62705-2459
(2 17) 544-849 1
One of Its Attorneys
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

EXHIBIT
A
IEPA LETTER
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ILLINOIS ENVIRONMENTAL PROTECTION AGENCY
1021 NORTH GRAND AVENUE EAST, P.O. BOX 19276,
SPRINGFIELD,
ILLINOIS 62794-9276 - ( 21
7)
782-3397
JAMES R. THOMPSON
CENTER, 100 WEST
RANDOLPH,
SUITE 11 -300, CHICAGO, IL 60601 - (31
2) 81
4-6026
ROD R.
BLACOJEVICH, GOVERNOR
DOUGLAS
P. SCOTT, DIRECTOR
July 27, 2006
OWNER
Home Star Bank
Home Star Bank Land Trust
#883
Attn: Ms. Tamra J. Legacy
- -
222 North Industrial Drive
Bradley, Illinois 609 1 5
Re:
091
0355001-Kankakee
County
Joyce Farms Recycling, Inc.
Permit No. 2000- 13 8-DE/OP
Modification No. 6
Log No. 2004-308 and 2005-219
Expiration Date: January
3 1,2008
State Permit File
C
ertdied
Mail
7004 2510 0001 8593 3958
7004 2510 0001 8593 3965
OPERATOR
Joyce Farms Recycling, Inc.
Attn: Mr. Patrick J. Joyce
P.O. Box 129
Essex, Illinois 60935
Dear Ms. Legacy and Mr. Joyce:
Permit is hereby granted to Home Star Bank, Trust
#883 as owner and Joyce Farms Recycling,
Inc. as operator approving modification of an existing landscape waste compost facility
consisting of 13.62 acres in Section 24, Township
3 1 North, Range 9 East of the Third Principal
Meridian, Kankakee County, Illinois, all in accordance with the applications and plans signed
and sealed by Sean C. Chisek, P.E., dated August 18,2004 and June 2,2005. Final plans,
specifications, application and supporting documents as submitted and approved shall constitute
part of this
permit and are identified on the records of the Illinois Environmental Protection
Agency ("Illinois EPA"), Bureau of Land, Division of Land Pollution Control by the permit
number and log number designated in the heading above.
The applications approved
by this permit consists of the following documents:
DOCUMENT
DATED
DATE RECEIVED
Application Log No.
2004-308
August 19,2004
August 19,2004
Additional Information
August 19,2004
August 23,2004
November 16,2004
November 18,2004
February 4, 2005
February 4,2005
ROCKFORD -
4302
North Main Street, Rockford, lL
61 103
-
(81 5) 987-7760
DES PLAINES -
951
1
W.
Harrison St., Des Plaines, IL
6001 6
-
(847) 294-4000
ELGIN -
595
South State, Elgin, IL
60123
-
(847) 608-31 31
8
PEORIA -
5415
N. University St., Peoria, IL
61 614
-
(309) 693-5463
BUREAU OF LAND - PEORIA -
7620
N. University
St.,
Peoria, IL
61614
-
(309) 693-5462
CHAMPAIGN
-
21 25
South First Street, Champaign, IL
61820
-
(21 7) 278-5800
SPRINGFIELD -
4500
S. Sixth Street Rd., Springfield, lL
62706
-
(217) 786-6892
0
COLLINSVILLE
-
2009
Mall Street, Collinsville, 11
62234
-
(618) 346-51 20
MARION -
2309
W. Main St., Suite
11 6,
Marion, lL
62959
-
(61 8) 993-7200
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 2
DOCUMENT
Application
L,og No.
2005-2 19
Additional Information
March 3 1, 2005
April 22, 2005
May 24,2005
July 19, 2005
October 5,2005
January 3,2006
January 9,2006
February 9,2006
May 10,2006
July 20, 2006
July 20, 2006
April 1,2005
April 25,2005
May 24,2005
July 19,2005
October 6, 2005
January
3,2006
January 10,2006
February 9,2006
May 10,2006
July 20,2006
July 20,2006
DATED
DATE RECEIVED
June 2,2005
June 2,2005
August 17,2005
August 19,2005
October 13, 2005
October 14,2005
January 12,2006
January 12, 2006
February 9,2006
February 9,2006
April 28,2006
April 28,2006
Specifically, Modification No. 6 to Permit No. 2000-138-DEIOP, renews the permit term until
January
3 1,2008, and approves a groundwater assessment plan, implementation of low-flow
sampling, change of phosphorus units
(mgIL), revised interwell values for nitrate, phosphorus,
and potassium, and the continued operation of
a landscape waste compost facility under a
modified operating plan in accordance with applicable regulations under 35 Illinois
Administrative Code (IAC), Parts 830-832. This facility is located on a 360 acre farm parcel with
an entrance roadway approxiinately 2500 feet in length and consists of a 13.62 acre compost
facility containing a 0.5 acre all weather pad receiving area, a 0.5 acre screening area,
2 acres of
leaf storage area, a 0.8 acre storage area for end-product
compost, a 0.5 acre storage area for
screen overs and approximately
6 acres for windrow composting. On-site runoff controls consist
of a detention pond, vegetative filter, swales and
a tile under-drain system in the composting
area. Equipment consists of a loader, grinder, windrow turner, screen, spreader, trucks, water
tank, pumps and appurtenances.
Pursuant to Section
39(a) of the Illinois Environmental Protection Act (Act) this permit is issued
subject to the development, operating and reporting requirements for Compost Facilities in 35
IAC, Parts 830 through 832, the standard conditions attached hereto, and the following special
conditions. The special conditions of the permit letter for Modification No. 6 to Permit No. 2000-
138-DEIOP have been arranged under sections in this permit and conditions from Modification
No.5 have been incorporated as indicated in the table below. In addition 13 special conditions
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

have been added to the permit pursuant to the regulations at 35 IAC, Part 530. In case of conflict
between the permit application and these conditions (both standard and special), the conditions
of this permit shall govern.
Condition
In
Permit No.
Modification No.
5
Condition In
Modification No. 6
I. 1
1.2
111.1
111.2
v. 1
11.1
111.3
111.5 and 111.6
11.6
IV.3
and IV.8
11.7
11.2
V.6
VI.4
and VI.5
v1.2
111.8
11.3
IV.9
IV.6
1.3
IV. 1
IV.3
IV.4
IV.5
IV.7
IV.2
111.9
111.10
111.1 1
111.12
111.13
111.14
1.7
and IV. 1
11.4
11.5
11.9
Description
Modified
Deleted and replaced by an added condition
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered
Renumbered and modified
Renumbered and modified
Renumbered
Renumbered
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 4
3 7
3 8
3 9
4 0
4
1
42
43
44
4 5
4 6
4 7
48
4
9
50
5
1
52
5 3
54
5 5
5 6
NA
NA
NA
NA
NA
NA
6 (Attach A)
7 (Attach A)
8 (Attach A)
18 (Attach A)
NA
NA
NA
NA
11. 10, 11. I 1 and 11.14
11.8
11.12
11.13
11. 15
11.16
11.17
11.18
11.19
v.5
V.5
and VII.l
VI.3, VI.4 and VI.6
111.16
111.17
111. I5
111.18
11.22
VII. 1
VII.2
1.4
1.2, 1.5, 1.6
11.20, 11.21
111.4,
111.7
IV.2
v.2, v.3, v.4
VI. I
6
(Attach A)
7 (Attach A)
8 (Attach A)
18 (Attach A)
24 (Attach A)
25 (Attach A)
26 (Attach A)
27 (Attach A)
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Renumbered and modified
Added
Added
Added
Added
Added
Added
Modified
Modified
Modified
Modified
Added
Added
Added
Added
I.
DEVELOPMENT
1.
This permit shall expire January 3 1, 2008. For operation to continue, application for
permit renewal must be submitted at least ninety (90) days prior to the expiration date.
2.
The operator shall reposition the corner stakes of the facility by September 30,2006. The
permittee shall locate and install the corner stakes to comply with the site development
plan measurements dated June
1, 2000 of Application Log No. 2000- 13 8. Upon
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 5
completion, the permittee shall maintain the corner stakes and records of the survey or
GPS readings of the repositioned corner posts and calculated footage measurements
between posts based on these GPS readings. These records shall be included in the
operating record and made available for inspection.
The operator shall maintain a minimum elevation of at least 92.0 feet relative to the site
benchmark elevation of 100.00 feet, along the north side of the facility within the facility
boundaries from 3,327 Easting to 2,830 Easting. The operator shall maintain a
minimum
elevation of at least 92.5 feet relative to the site benchmark of 100.00 feet along the west
side of the facility, within the facility boundaries from 4,843 Northing to 5,300 Northing
with tie in to the west end of the detention pond
berm. Elevations shall be checked along
the north and west facility perimeters, yearly, each April, on 100 foot intervals. A record
of this conventional or
GPS survey and the corresponding elevations placed in the facility
operating records and made available for inspection. Within
7 days of discovery,
elevations found to be lower than the above minimum specified elevation, shall be
brought up to the minimum elevation using a compacted soil berm.
4.
As specified at 35 IAC 830.102, the permittee shall submit an application for permit
modification to the Illinois EPA and receive authorization before implementing any
modification to the facility.
5.
The permittee shall notify the Illinois EPA of any changes from the information
submitted to the Illinois EPA in its application for a development and operating permit
for this site. Permittee shall notify the Illinois EPA of any changes in the names or
addresses of both beneficial and legal titleholders to the
herein-pennitted site. Such
notification shall be made in writing within fifteen
(1 5) days of such change and shall
include the name or names of any parties in interest and the address of their place of
abode; or, if a corporation, the name and address of its registered agent.
6.
The permittee shall mark the limits of the facility for visual reference by placing and
maintaining stakes at the comers of the 13.62 acre permitted facility consistent with
condition 1.2 above and as described in the site plan sheet of the facility, dated June 1,
2000, provided in Application Log No. 2000-138. Except along the east side of the
facility where existing vegetation prevents a direct line of sight, the operator shall
maintain a clear, straight line of sight between facility boundary markers at all times.
7.
The operator shall install and maintain drain tiles located and placed under the
composting area as shown in Plan Sheet No.
1 of the addendum dated June 2,2000, to
Application Log No. 2000-138. Drain tiles shall be placed at not less than 5 feet (5
ft.)
below ground surface to the top of drain pipe at all locations within the composting area.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 6
11.
OPERATION
1.
Landscape waste may be received at this site from 6:00 am to 6:30 pm, Monday through
Friday and from
6:00am to noon on Saturday. Machinery, trucks and equipment may
only be operated at the facility during these specified operating hours. If it becomes
necessary to accept waste or operate outside of the above schedule in response to an
emergency situation, documentation of the nature of the emergency shall be made and
verbal notice of the activity shall be provided to the Kankakee Planning Department
(8
15/937-2940
)
or Illinois EPA, Des Plaines Regional Office (8471294-4000) on the
same day or if not possible on the next business day. Written notification of the
emergency shall be provided to the Illinois EPA and Kankakee County Planning
Department within
7 days of the incident.
2.
The operator shall post a permanent sign at each entrance, the text of
which specifies in
letters not less than three inches high:
a.
The name and mailing address of the operation;
b.
The operating hours;
c.
Materials which can be accepted; and
d.
The statement, "COMPLAINTS CONCERNING THIS FACILITY CAN BE
MADE TO THE FOLLOWING PERSONS," followed by the name and
telephone number of the operator, and the name and telephone number of the
Bureau
of Land, Illinois Environmental Protection Agency, Springfield, Illinois
(2171524-3300).
3.
For every odor complaint received, the operator shall record and report to the Kankakee
County Planning Department (8 151937-2940) or Illinois
EPA's Des Plaines Regional
Office (8471294-4000) within 24 hours after receiving the complaint, the date and time
received, the name, address and phone number of the complainant, if known, and the
name of the person receiving the complaint. Within seven days after the complaint, the
operator shall file a written report to the Illinois EPA, Des Plaines Regional Office and
Kankakee County Planning Department on the date, time and nature of any action taken
in response to an odor complaint.
4.
The permittee shall insure that utilities necessary for safe operation are available during
operation of the facility, including communications equipment, electric service and lights
when necessary. The permittee shall also insure that water is available for compost
operations and dust control.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 7
5.
If a breakdown of equipment occurs, the permittee shall provide standby equipment or
insure additional equipment will be brought on-site to
con~ply with the requirements of
this permit, in accordance with Section
3 of the Operating Plan (February 2006) of
Application Log No. 2005-21
9.
6.
The permittee shall take measures to ensure that the waste does not become wind strewn
or ignited and that no other provisions of the Act are violated.
7.
The permittee shall maintain an accessible clear space between windrows of cornposting
material. These aisles shall be a
minimum of 8 feet wide and suitable for housekeeping
operations, visual inspection of windrow areas and fire fighting operations.
8.
The permittee shall provide fire extinguishers on all loaders and grinders used at the
facility.
9.
Open burning is prohibited at this facility, except as permitted in accordance with 35 Ill.
Adm. Code, Parts 200-245.
10.
The operator shall implement as necessary methods for controlling dust so as not to cause
or contribute to a violation of the Act. Dust control procedures shall be conducted in
accordance with the Operating Plan, Sections
7 and 8 and the Contingency Plan in
Section 13, of Application Log No. 2005-2 19, including:
a.
The operator shall apply calcium chloride, tar and chip, recycled asphalt
pavement or equivalent additives to the incoming driveway of the facility as
necessary to control dust.
b.
Each week during May through October, the operator shall assess the condition of
the driveway to determine if the surface coating is adequate to control dust and
record the inspection and resulting action in the operating records of the facility.
The operator shall also apply water to the road surface each day if needed to
control dust.
c.
During dry periods, the operator shall apply water to aisles between windrows
sufficient to prevent off-site migration of dust.
d.
The operator shall apply water to windrows during windrow turning as necessary
to control dust generated during turning.
e.
The operator shall take measures to prevent dust or migration of dust off-site from
incoming traffic or equipment operating at the facility.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 8
11.
The permittee shall control insects; rodents and other vectors so as not to cause or
contribute to disease and nuisance conditions, including:
a.
The operator shall take preventative measures to disrupt the life cycle of flies to
prevent fly breeding locations and to control nuisance conditions including:
1.
At least three Fly Traps shall be placed across the facility and monitored
weekly during April through October;
2.
Fly Trap counts shall be made and recorded weekly; and
3.
Based on weekly Fly Trap counts and noted conditions at this facility
during April through October, actions shall be taken to reduce noted
increasing fly populations, by turning all windrows at least once every
5
days, covering windrows with sufficient wood chips to prevent fly
breeding or use of a fly insecticide in addition to the use of Fly Traps.
b.
The operator shall record Fly Trap weekly counts and the specific control
measures taken each week based on these counts.
c.
These records shall be maintained as part of the operating records at the facility
ticket office.
The operator shall control litter at the facility by patrolling the facility daily and
collecting litter. Aisles between windrows shall be scraped, vacuumed or picked clean of
debris and litter after windrow formation or turning. Visible litter shall be removed from
windrowed material each operating day. The operator shall install movable fencing, down
wind, on at least two sides of the grinder and it's output piles and the trommel screen and
it's output piles during operation and the operator shall move and clean this fencing as
necessary to contain litter and aid in collection. Any litter from facility operations strewn
beyond the confines of the facility shall be collected and properly disposed. The operator
shall not operate the grinder or trommel screen during windy conditions if litter from the
operation cannot be contained within the processing area. The operator shall maintain the
tipping area clean of landscape waste and litter during operations by scraping up all
landscape waste from around the grinder, tromrnel screen and the tipping area each day
of operation.
13.
Non-compostable wastes shall be removed from incoming landscape waste on the
receiving pad and from composting material in accordance with Sections
3.1 and 3.2 of
the Operating Plan of Application Log No. 2005-219. The permittee shall store
non-
compostable waste and collected litter in covered trash containers for periodic disposal at
an off-site permitted facility. The operator shall provide sufficient trash container
capacity on-site to contain waste volumes. Each load of landscape waste shall be
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 9
inspected and visible non-landscape waste materials shall be removed during unloading.
After unloading, the landscape waste shall be turned with a loader or similar equipment
to assist in exposing and removing any non-landscape waste material. Mechanical
equipment shall be available and used as necessary to spread out each load to facilitate
litter removal prior to processing. The permittee shall reject any load of landscape waste
that contains extensive contamination or take the actions described in Section 6 of the
Operating Plan, to prevent further delivery of contaminated loads from
the customer and
remove the contamination from the load, prior to grinding.
14.
The permittee shall maintain mufflers in good condition on all operating equipment at the
facility and shall implement appropriate noise control measures such as constructing
sound barriers and limiting times of operation of equipment as necessary to prevent
off-
site nuisance conditions.
15.
The operator shall prevent delivery and
hacling vehicles from tracking mud o~to
public
roadways.
16.
No salvaging shall be conducted at this facility. Landscape waste received at this facility
may not be transferred. All landscape waste received at this facility shall be
composted to
end-product compost prior to distribution or use out-side the facility.
17.
Tlle operator shall implement controls at the facility to limit unauthorized access, prevent
random dumping and ensure safety.
18.
The operator shall have available at the ticket office a written Operating Plan that
addresses the activities specified in 35
IAC 830.206 (a) through (n). The Operating Plan
shall be made available and explained to facility employees.
19.
The operator shall provide annual training to employees on facility operating procedures
for both normal and emergency situations. New employees shall be trained prior to
participating in operations at the facility relevant to their employment. Employees shall
sign an acknowledgment stating that they have received training in facility operating
procedures and such acknowledgment shall be made a part of the records for the facility.
20.
Any special waste, as defined in Section 3.457 of the Act received at the facility shall be
immediately contained, collected and hauled to a properly permitted facility.
21.
The permittee shall implement the Contingency Plan in Section 13 of Application Log
No. 2005-2 19, as necessary to address any contingency described in 3
5 IAC 830.202(c)
and 830.212(a) which occurs at the facility. The permittee shall maintain a copy of the
facility contingency plan at the facility ticket office.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 10
22.
This facility is subject to the groundwater monitoring program approved by Permit No.
2000-1
38-DEIOP and the conditions contained in Attachment A of this permit
modification.
111.
COlMPOSTING AND COMPOST MONITORING
1.
The type(s) of waste that may be received and cornposted at this facility shall be limited
to landscape waste as defined in
35 IAC 830.102. The permittee shall not accept more
than 170,000 cubic yards of landscape waste per year at this facility.
2.
The types of additives used in the composting process at this facility shall be limited to
innoculant bacteria, fruit and vegetable waste and water. Fruit and vegetable waste is
limited to fresh cut fruits and vegetables from
Del Monte Fresh Produce, 12 Stuart Drive,
Kankakee, Illinois. The operator shall conduct operations as follows:
a.
The permittee may only receive fruit and vegetable waste during the operating
hours specified in Special Condition
11.1 of this Permit.
b.
The operator shall assure that fruit and vegetable waste additive is transported to
the compost facility in a water tight container or vehicle that assures no leakage of
the waste during transport. The operator shall inspect each container or vehicle
delivering fruit and vegetable waste additive to the compost facility at the ticket
office for any leakage. Any leakage from the vehicle shall be recorded in the
records of the facility and the truck or container shall be refused, not allowed to
unload and
banned from further delivery to the facility until all leaks are repaired
and verified
by the ticket office in the records of the compost facility.
c.
The
permittee shall prevent excess liquids from fruit and vegetable waste delivery
containers from contacting or contaminating the asphalt receiving pad area or
surrounding soils by providing sufficient absorbent material on the pad prior to
unloading fruit and vegetable waste, unloading fruit and vegetable waste additive
onto the absorbent material and removal of all wetted materials from the pad as
soon as possible after unloading.
d.
Fruit and vegetable waste additive shall not exceed 10% total additives by volume
of the landscape
u7aste composting material.
e.
The permittee shall not receive
fruit and vegetable waste if sufficient volume of
landscape waste is not available the same day for blending so as not to exceed
10% total additives by volume of the landscape waste.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page I1
f.
The pennittee shall incorporate fruit and vegetable waste additive into windrows
of landscape waste under proper conditions for aerobic composting as soon as
possible upon receipt, but no later than the end of the day received.
g.
Windrows containing fruit and vegetable waste additive shall be covered with a
compost cover
tarp or layer of carbon source material or bulking agent material
by the end of the operating day. Cover material shall be applied and maintained
thick enough to discourage foraging. Except during windrow maintenance, cover
shall be maintained until the raw material is no longer attractive to foragers.
3.
Within 24 hours of the time of receipt, the operator shall process landscape waste
received at the facility into windrows providing proper conditions for aerobic
composting.
4.
The permittee shall not construct windrows of composting material that exceed 6ft. 4
inches in height and 12 ft., in width. Within 24 hours after constructing windrows of
composting material the permittee shall process the windrow with a windrow turner or
other equipment to comply with the above maximum dimensions.
5.
The permittee may temporarily store brush, tree limbs and woodchips for use as bulking
agent in the composting process at the facility
in the designated woodchip/leaves storage
area identified on the facility plan sheet in Attachment
1 of the Operating Plan (February
2006) to Application Log
No. 2005-219. Incoming brush and woody landscape waste to
be stored as bulking agent shall be processed as necessary and placed into the designated
storage area within
24 hours after receipt. Paper bags containing brush shall be broken
open prior to storage of the brush. The designated woody landscape
waste storage area
shall be operated so as not to cause a nuisance, harbor vectors, cause litter, leachate,
malodors or create an unsightly appearance. Brush and branch storage piles shall be
limited to the
3/4
acre designated woodchip/leaves storage area. Brush and limbs shall not
be stored for longer than
6 months before being processed into woodchips. Woodchip
storage piles shall be constructed and managed to reduce pile heating and the potential for
fires.
6.
Leaves may be temporarily stored in the designated leaf storage areas or in the
composting area for use as a carbon source in the composting process, in windrows not
exceeding
6 ft. 4 inches in height and 12
ft.
in width. Aisle spacing in the designated
carbon source leaf storage areas shall not be less than
8 ft. wide. Carbon source leaves
stored in windrows
in the composting area shall have aisles that are a minimum of 8 ft
wide. Incoming leaves to be stored as carbon source material, shall be processed as
necessary and placed into the designated storage areas within
24 hours after receipt.
Paper bags containing leaves shall be broken open prior to storage of the leaves. All
leaves stored for use as a carbon source, shall be incorporated into composting material
within
9 months of their receipt.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 12
7.
All screen overs generated from the screening of landscape waste or end-product
compost, shall be stored in the 0.5 acre designated screen overs storage area as shown in
Figure
1, of Application Log No. 2005-2 19, received February 9,2006, until used in the
composting process or removed from the site. Storage of screen overs shall be in
windrows not exceeding
6 ft. 4 inches in height and 12
ft.
in width. Aisle spacing
between windrows in the designated screen overs storage area shall not be less than
8 feet
wide.
The operator shall contain screen overs and prevent wind blown litter from the
stored screen overs. The windrows of screen overs shall be covered with end-product
compost, a compost cover fabric or wood chips as necessary to control litter dispersal
from the stored material. To prevent blowing litter during these operations, moveable
fencing shall be provided and positioned down wind of operations each
time screen overs
in the storage area are removed or processed.
8.
The operator shall conduct operations to minimize odors by:
a.
Rejecting odorous loads likely to cause a nuisance to surrounding properties;
b.
Load checking all incoming landscape waste and rejecting bad loads;
c.
Avoiding anaerobic conditions in the composting material, bulking agent and
carbon source materials and quickly taking corrective actions to turn or aerate any
windrow or pile if monitoring indicates an out of normal range temperature or low
oxygen levels;
d.
Processing all landscape waste received in
a timely manner into windrows
providing proper conditions for aerobic composting;
e.
Mixing or covering incoming odorous loads with bulking agents or end-product
compost, if processing will be delayed;
f.
Covering windrows as necessary to control odors;
g.
Considering the time of day, wind direction and wind speed prior to turning or
moving material;
h.
Forming of windrows into a size
and shape favorable to minimizing odors, and
1.
Implementing the odor control measures specified in Section 8 of the Operating
Plan and in the Contingency Plan in Section 13 of the Operating Plan provided in
Application Log No. 2005-219.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 13
9.
The operator shall take measures to adjust the oxygen level within the windrow as
necessary to promote aerobic composting. The oxygen level of each windrow of
composting material shall be monitored at least weekly.
10.
The operator shall take measures to maintain the moisture level of the
cornposting
material within a range of 40% to 60% on an as is basis. Except for January through
February the permittee shall monitor the moisture level in each windrow of composting
material at least once per week. During January and February moisture measurements
may be suspended if windrows are frozen but must be conducted once every
two weeks if
windrows are not frozen. If a "Hand Test" method is used, for every
2oth hand test, a
sample shall also be dried and weighed to confirm moisture measurements talten by the
hand test method.
1
1.
The operator shall monitor the temperature of each windrow of composting material at
the 18
inch and 48 inch depth levels once each operating day, during March through
December. During January and February the permittee shall monitor the temperature of
each windrow of composting material once per week or document that the windrows are
frozen and temperature monitoring could not be conducted.
12.
The permittee shall not mix landscape waste or composting material with end-product
co~npost once the end-product compost has been designated as ready to be sold or offered
for use off-site. Only end-product compost which has been processed to maturity and
meets all the applicable performance standards of 35
IAC 830.503 for General Use
Compost, may be sold or offered for use off-site.
13.
Any additive, or combination of additives, other than water, must not exceed 10 percent,
by volume, of the composting material. Prior to use of any additive other than inoculant
bacteria, fruit or vegetable waste from Del Monte Fresh Produce and water, the operator
shall obtain written authorization from the Illinois
EPA.
14.
The operator shall turn each windrow at least four times per year and not less than once
every six months.
15.
The permittee shall test End-product Compost derived from landscape waste for the
parameters set forth in 35
IAC 830.503 (a-f). The permittee shall conduct this testing at a
frequency of:
a.
Once every 5000 cubic yards of end-product compost transported off-site, or
b.
Once per year, if less than 5000 cubic yards of end-product compost are
transported off-site per year.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 14
16.
To meet the definition of "general use compost" the end product of the composting
process:
a.
Must be free of any materials that pose a definite hazard to human health due to
physical characteristics, such as glass or metal shards;
b.
Must not contain
manmade materials larger than four millimeters in size
exceeding one percent of the end-product compost, on a dry weight basis;
c.
Must have a pH between 6.5 and 8.5;
d.
Must have reached stability, as demonstrated by one of the methods prescribed in
35
Ill. Adm. Code 830, Appendix B or stability of the compost is measured using
respiration rate and has an oxygen utilization respiration rate under conditions
appropriate for microbial growth of
<-
20mg02/Kg compost dry solids
/
EL.;
e.
Must not contain fecal coliform populations that exceed 1000 MPN per gram of
total solids (dry weight basis), or Salmonella species populations that exceed three
(3) MPN per four grams of total solids (dry weight basis); and
f.
Must not exceed, on
a dry weight basis, the inorganic chemical concentrations set
forth below:
Parameter
Arsenic
Cadmium
Chromium
Copper
Lead
Mercury
Nickel
Selenium
Zinc
mg/kg (dry weight basis)
4 1
2 1
1200
1500
300
17
420
36
2800
17.
The permittee shall manage end-product compost that does not qualify as "General Use
End-product Compost" as "Designated Use Compost". The use of Designated Use
Compost off-site is limited to daily cover or vegetative amendment in the final layer of a
landfill if authorization from Illinois
EPA has been granted to the landfill to use
Designated Use Compost. End-product compost used as daily cover or vegetative
amendment in the final layer of the landfill is exempt from the performance standards of
35 IAC 830, Subpart
E.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 15
18.
The permittee shall conduct sample collection, preservation and analysis in accordance
with methods set forth in
35 IAC 830.507 and the approved test methods in Special
Condition 111.16.
JV.
SURFACE WATER MANAGEMENT
The permittee shall maintain the grade of the composting surface to allow diversion of
run-on waters away from the composting area, control runoff from the facility and facility
operation during all weather conditions. After each precipitation event or snow melt, the
operator shall inspect the facility for ponded water within operational areas and remove
ponded water by blading, pumping, adsorption or filling and compacting any depressed
area within 48 hours after each precipitation event. Within 48 hours after the end of a
precipitation event or snow melt, the permittee shall re-grade to prevent further water
accumulation. Site design grades as shown in Figure
1,
of Application Log No. 2005-2 19,
received November 23, 2005, shall be maintained and 2ny rclts filled to prevent water
accumulation. The operator shall maintain aggregate or a dry stockpile of soil for filling
low areas discovered within the facility.
2.
The permittee shall allow soil surfaces used for windrow composting to dry periodically
to promote aerobic conditions in the soil subsurface. The permittee shall maintain a
compacted surface in the compost area sufficient to support the loads imposed
by
material and equipment without rutting or depression so as to maintain the design grade.
3.
The operator shall operate the detention pond in
a manner which provides for settling, use
and timely discharge of water from the detention pond to maintain capacity in the pond.
The detention pond gate valve shall remain normally closed to contain runoff for use on-
site and to provide an appropriate settling time for runoff. The permittee shall provide
sufficient settling time to prevent excess turbidity or solids discharge to receiving waters
generated by precipitation events less than or equal to the 10
yr.-24-hr. precipitation
event. The permittee shall provide capacity in the detention pond for forecasted
precipitation by drawing down or discharging from
the detention pond prior to the
forecasted precipitation event. The operator shall prevent over topping the pond perimeter
elevation of 92.0 feet in relation to the site bench mark elevation of
100.00 feet. Runoff
collected in the detention pond shall be removed, prior to the development of anaerobic
conditions in the detention pond water.
4.
The operator shall remove any sediment buildup in the retention pond, as necessary to
maintain design capacity in the pond for the volume of site runoff resulting from the 10
yr.
24-hr. precipitation event.
5.
Issuance of this permit does not relieve the permittee from obtaining any necessary
permits from the Illinois
EPA's Bureau of Water.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 16
6.
The permittee shall implement best management practices to control runoff from
composting areas to insure the permitted facilities do not cause or contribute to a
violation of the water quality standards contained in
35 IAC, Part 302.
The operator shall prevent trucks, tractors and other operating equipment from driving on
or through the vegetative filter strip runoff control areas, berms and swales designated on
plan sheet, Figure
1, of Application Log No. 2005-219 received November 23,2005. The
operator shall maintain the vegetation in the designated vegetative filter areas. The
vegetative filter strip shall be a minimum of 30 feet wide. The operator shall protect the
vegetative filter from vehicle traffic and prevent encroachment from material stockpiles.
Drainage swales shall be cleared of debris. The operator shall maintain grades within the
swales to insure proper drainage to the on-site detention pond. The operator shall not
cultivate areas within the detention pond corner stakes where the elevation is below the
92.0 foot elevation contour. To limit weed height and prevent interference with proper
pond operation, the operator shall periodically mow any volunteer vegetation that appears
within the detention pond corner stakes below the 92.0 elevation contour.
8.
The permittee shall control runoff from the facility resulting from precipitation less than
or equal to the 10-year, 24-hour precipitation event, to ensure the runoff does not to cause
or contribute to a violation of the Act.
9.
Storm water or other water which comes into contact with landscape waste received,
stored, processed or composted, or which mixes with landscape waste leachate, is
landscape waste leachate. The permittee shall collect
leachate for use in the composting
process, treat the
leachate as necessary prior to discharge off-site to meet applicable
standards of
35 IAC, Subtitle C, or transport the leachate to a properly permitted facility
for treatment or disposal.
V.
RECORDKEEPING
1.
The permittee shall keep records of the volume of fruit and vegetable waste received each
day, the volume of landscape waste which was mixed with the
fruit and vegetable waste,
the identification number of the windrow receiving the fruit and vegetable waste additive
and the total volume of landscape waste and total volume of
additive(s) in the windrow
receiving the additive, recorded after each additive addition.
2.
The operator shall maintain weekly records of dust control additive performance checks
May through October and any corrective actions taken based on those checks.
3.
The operator shall maintain records of weekly fly counts from Fly Traps conducted
during the months of April through October and any corrective actions taken in response
to those counts.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 17
4.
The operator shall record the date, the actual or estimated weight of each load of
landscape waste received and estimated volume of
each load of landscape waste received.
The operator shall perform these weights and measures during load checking at the ticket
office or receiving area, prior to unloading. Load weight shall be derived from dated
weight tickets from semi trailers and large trucks or trailers. All estimated measurements
shall include the daily conversion factor used for the estimate either from weight to
volume or volume to weight. The operator shall assess each truck or trailer load to
determine compliance with local roadway load limits. Those records shall be maintained
at the ticket office and made available for inspection.
5.
The operator shall keep copies of the facility permit, design plans, operating plan,
contingency plan, closure plan, records required by special condition and records
required by
35 Ill. Adm. Code 830.21 1(a-c) at the ticket office, and they shall be
available during normal business hours for inspection or photocopying by Illinois EPA
personnel or designees. Records must be kept for three years. Records required to be
maintained pursuant to
3 5 IAC 830.2 1 1 (a-c) include:
a.
The quantity by volume and weight
of each load of landscape waste received;
b.
The origin, type and quantity of each additive received and a record of any
rejected load;
c.
The type and quantity of additive used in the
composting process;
d.
The dates when turning of each windrow occurred, the weather conditions, the
time of turning and the potential for odor based on recent windrow monitoring
data and daily observations
of windrows;
e.
All compost material monitoring data, compost analysis data and groundwater
monitoring data required by permit condition;
f.
Any odor complaint records;
g.
The time, date and a brief description of any incident that required
implementation of the contingency plan; and
h.
The volume of General Use Compost and Designated Use Cornpost renloved
from the facility each day.
6.
The operator shall submit a written annual report to the Illinois EPA, on a form provided
by the Illinois
EPA on or before April 1 each year that includes:
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 18
a.
An estimate of the amount of landscape waste material received for composting in
the previous calendar year by weight (tons) and volume (cubic yards);
b.
An estimate of the amount of additives received for composting in the previous
calendar year by volume (cubic yards);
c.
An estimate of the amount and disposition of compost material in the previous
calendar year; and
d.
A compost facility financial assurance plan compliance certification containing
the following information:
(1)
Operator name;
(2)
Illinois inventory identification number and permit number assigned by
the Illinois EPA;
(3)
Facility name;
(4)
Address and county in which the facility is located; and
(5)
A statement certifying compliance with the financial assurance provisions
of 35 IAC, Part 830, Subpart F.
VI.
CLOSURE PLAN
1.
The operator shall implement the Closure Plan submitted in Application Log No.2005-
219, dated June 2, 2005, upon commencement of closure of this facility.
2.
The operator shall close the facility in a manner which:
a.
Minimizes the need for further maintenance; and
b.
Controls, minimizes or eliminates the release of landscape waste and landscape
waste constituents to the groundwater or surface waters or to the atmosphere to
the extent necessary to prevent threats to human health or the environment.
3.
The operator shall initiate implementation of the closure plan within 30 days following
the beginning of closure. Not later than 30 days following the beginning of closure the
operator shall post a sign at each entrance, the text
of which specifies in letters not less
than three inches high: This facility is closed for all composting activities and all receipt
of landscape waste. No dumping allowed. Violators will be prosecuted. The sign shall be
maintained until certification of completion of closure is approved for the facility by the
Illinois EPA.
4.
Within thirty days after termination of operation, the operator shall notify the Illinois
EPA in writing of site closure.
A Final Composting Report shall be submitted to the
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 19
Illinois EPA, and shall include the information in the Annual Report for the time since
the end of the last report period.
5.
Within 180 days following the beginning of closure, the permittee shall remove all
landscape waste, composting material, end-product compost, any additives and any waste
from the facility. Any material not
hlly composted, which must be transported off-site
shall be managed at a compost facility operating in accordance with Section 21
(q) of the
Act.
6.
Upon completion of closure, the operator shall prepare and submit to the Illinois EPA an
affidavit pursuant to 35 IAC
830.213(g). The affidavit shall be submitted on form LPC-
546 titled, "Affidavit For Certification of Closure of Permitted Non-Hazardous Transfer,
Storage and Treatment Waste Facilities" and state that the facility has been closed in
accordance with the closure plan.
VII.
FINANCIAL ASSURANCE
1.
The operator shall maintain at the ticket office a copy of the financial assurance plan. The
plan shall contain a written cost estimate based on the itemized steps necessary to
complete closure, an estimate covering the cost of premature final closure and the
financial assurance mechanism chosen covering the maximum cost estimate.
2.
The operator shall maintain financial assurance equal to or greater than the amount
provided as
a written cost estimate in Appendix B of Application Log No. 2005-21 9,
received April 28, 2006. The permittee shall revise the current cost estimate whenever a
change in the facility closure plan increases the cost estimate. The current cost estimate
approved by Modification No.
6 to Permit No. 2000-138-DEIOP is $147,378.
The original and two (2) copies of all certifications or reports which are required to be submitted
to the Illinois EPA by the
permittee should be mailed to the following address:
Illinois Environmental Protection Agency
Permit Section, Bureau of Land
--
#33
102 1 North Grand Avenue East
Post Office Box 19276
Springfield, Illinois 62794-9276
Within 35 days after the date of mailing of the Illinois
EPA's final decision, the applicant may
petition for a hearing before the Illinois Pollution Control Board to contest the decision of the
Illinois EPA, however, the 35-day period for petitioning for a hearing may be extended for a
period of time not to exceed 90 days by written notice provided to the Board from the applicant
and the Illinois EPA within the 35-day initial appeal period.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 20
Work required by this permit, your application or the regulations may also be subject to other
laws governing professional services, such as the Illinois Professional Land Surveyor Act of
1989, the Professional Engineering Practice Act of 1989, the Professional Geologist Licensing
Act, and the Structural Engineering Licensing Act of 1989. This permit does not relieve anyone
from compliance with these laws and the regulations adopted pursuant to these laws. All work
that falls within the scope and definitions of these laws must be performed in compliance with
them. The Illinois EPA may refer any discovered violation
of these laws to the appropriate
regulating authority.
Sincerely,
Manager, Permit Section
Bureau of Land
~ttkhments: Standard Conditions
Attachment
A Monitoring Program
cc:
Kankakee County Planning Department
Sean C. Chisek, P.E., Andrews Environmental Engineering, Inc.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

STANDARD CONDITIONS
FOR
CONSTRUCTIONIDEVELOPh4ENT PERMITS
ISSUED BY THE ILLmTOIS ENVIRONMENTAL PROTECTION .AGENCY
BUREAU
OF LAND
August 22,2001
Tlle Illinois Enviromnental Protection Act ~Illinois Revised Statutes, Chapter 1 I 1-112, Section
103?) grants the Ellvirollrllental Protection Agency authority to impose conditioils on permits
which it issues.
These standard
conditiolls shall apply to all permits which the Agency issues for construction or
developnlent projects which require permits under the Bureau of Land. Special conditions may
also be
imnbosed in addition to these standard conditions.
1
Ullless this permit has been extended or it has been voided by a newly issued pe~mit, this
permit will expire two years after date of issuance unless construction or development on
this project has started
on or prior to that date.
2
The
construct~on or developlnellt of facilities covered by this permit shall be done in
compliance with applicable provisions of Federal
laws and regulations, the Illlnois
Envirollmental Protection Act, and Rules and Regulations adopted by the Illinois Pollution
Contl-01 Board
3.
There shall be no deviations from the approved plans and specifications unless a written
request for modification of the project, along with plans and specifications
as required, shall
have been submitted to
the Agency and a supplemelltal written permit issued.
4.
The permittee shall allow any agent duly authorized by the Agency upon the presentation of
credentials:
a
to enter
at reasonable times the permittee's premises where actual or potential effluent,
einissions or noise sources are located or where any activity is to be conducted pursuant
to
this permit.
b.
to have access to and copy at reasonable times any records required
to be kept under the
terms and conditions of this permit.
c.
to inspect at reasonable times, including during any hours of operation of
equipment
constructed or operated under this permit, such equipment or monitoring metl~odology
or equipment required to be kept, used, operated, calibrated and rnaintaimd under this
pennit..
d,
to obtain and reinove at reasonable times samples of ally discharge or emission of
pollutants.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

e
to enter at 1-easomble tunes and utllize any photographic, recording, testing, monitoring
01- other equip~llent for the purpose of preser~iing, testing, rncl~itoring, or recoj-d:ng any
activity, disc,harge, or elnissioil authorized by this perm~t.
5.
The issuance of this permit
a.
shall
not be considered as in any manner affectillg the title of the preillises upall wl~jch
the perlllitted facilities ai-e to be located;
b
does
not release the permittee fro111 ally liability fo1- damage to person or property
caused
by or resulting from the construction, maintenance, 01- oper-ation of the proposed
facilities;
c,
does not release the perillittee fi-om coillplia~lce with other applicable statutes and
regulations of the United States, of the State of Illinois, 01- with al~plicable local laws,
ordinances
and regulatioas;
d
does
not take illto coilsideratioll or attest to the structural stability of any units or parts
of the
pl-oj ect;
e
ill no ma~xler implies or suggests that the Agency (or its officers, agents or employees)
assumes
ally liability, directly or indirectly, for any loss due to damage, installation,
maintenanc.e, or operation of the proposed equipmeilt or facility.
6.
Unless a joint coilstructioil;operatioil perillit has been issued, a permit for operatillg sllall be
obtained from the Agency before the facility or equipment covered by this perlnit is placed
into operation.
7.
These standard conditions shall prevail unless nlodified by special conditio~ls
8.
Tlle Agency may file a comnpliant with the Board for modification, suspellsion or revocatioll
of a pemlit:
a,
upoil discovel-y that the permit application co~ltaiiled misrep~~esentations,
misinformatioi or false statemellts or that all relevant facts were not disclosed; or
b
up011 finding that any standard or special conditions have been violated; or
c.
upoil ally violation of the E11viroizmental Protection Act or ally Rule or Regulation
effective thereunder
as a result of the collstructioll or developlneilt authorized by this
permit.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Re: Site No.09 10355001
--
Kankakee County
Permit No.
2000-138-DEIOP
Log Nos. 2004-308 and 2005-219
ATTACHMENT A
Monitoring Program
To identify any releases from the facility and demonstrate compliance
with the applicable
groundwater quality standards, the groundwater monitoring program is approved as follows:
1.
The monitoring program must be capable of determining background groundwater
quality hydraulically upgradient of and unaffected by the units and to detect any
discharge of contaminants from any part of a potential source of discharge from the units.
The Illinois
EPA reserves the right to require installation of additional monitoring wells
as may be necessary to satisfy the requirements of this permit.
2.
The groundwater monitoring program shall include consistent sampling and analysis
procedures to assure that monitoring results will provide a reliable indication of
groundwater quality in the zone being monitored.
3.
The permittee shall sample all groundwater monitoring points for all potential sources of
contamination on a quarterly basis in accordance with Condition No.
2 1.
4.
The permittee shall use the methods in Attachment B or propose for Illinois EPA
approval, a more appropriate method to statistically evaluate the groundwater monitoring
data. The selected method must provide for statistical comparisons between
upgradient
and downgradient groundwater quality data and a reasonable balance between the
probability of obtaining Type I (false positive) and Type
I1 (false negative) errors. The
Type
I error rate must be no less than 5 percent. The proposal must consider the
gathering of a background data set (from upgradient wells), sufficient to provide an
accurate representation of the variability in the quality of groundwater that is unaffected
by operations at the facility, and to assure that the selected test has a reasonable chance of
detecting releases should they occur.
5.
For each sampling event, using the methods in Condition No.
4 above, the permittee must
determine if a significant change in groundwater quality has occurred by:
a.
Comparing sample results from each downgradient well to the pooled background
data The background for each hydrogeologic zone shall be established by pooling
all upgradient well data taken from that zone during the first year. This
comparison must be performed for each parameter for each well.
6.
The permittee shall conclude that a significant change in groundwater quality has
occurred if the results of the evaluation in Condition No. 5 above indicate that the value
for any parameter exceeds:
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 2
a.
The background value established for that parameter at the confidence level; or
b.
The Class
I1 groundwater quality standards listed in Subpart D of 35 Ill. Adm
Code 620 Standards. Iron, sulfate and
TDS are exempt from this comparison.
Chromium and copper will not be subject to the requirements of this condition pending
results of the groundwater assessment due to the Illinois EPA no later than January
15,
2007.
7.
Within thirty (30) days after the date which the first sample analysis are received, the
permittee must
resample and test the determination made in Condition No. 6 above. The
operator shall provide notification to the Agency of the results of the resampling analysis
within 30 days after the date on which sample analysis are received, but no later than 90
days after the first samples were taken. If the evaluation of the
resample result confirms
the
determination made in Condition No. 6 above, the permittee must conclude that a
significant change in groundwater quality has occurred.
8.
In the event a significant change in groundwater quality has occurred or has been
confirmed, the permittee shall:
a.
Submit an assessment monitoring plan within sixty (60) days of the significant
change as determined in Condition No. 6 or Condition No.
7, but no later than 120
days of the original sampling event in the
form of a permit application. The
assessment monitoring plan shall include appropriate methods for determining the
source of the increase, the potential threat to human health and the environment,
and the concentration and extent of the contaminants,
if any. The assessment
monitoring plan, at a minimum, include expanded sampling requirements for the
effected
well(s) and shall be implemented within (30) days of approval from the
Illinois EPA.
b.
Submit the assessment report, based on and including the data and information
generated from the completion of Condition No. 8a above to the Illinois
EPA
within ninety (90) days of approval of the assessment monitoring plan.
c.
Propose a corrective action plan if assessment monitoring indicates that the
facility has impacted groundwater. The corrective action plan shall be submitted
within thirty (30) days of approval of the assessment report required by Condition
No. 8b above in the form of a permit application and include appropriate response
actions to address any impact of the facility. The plan shall be implemented
within thirty (30) days of Illinois
EPA approval.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

sand unit, and located as depicted in the February 8, 2001 addendum to Log No. 2000-
457.
Applicant Designation
Illinois EPA Designation
#
represents upgradient monitoring point(s)
*represents wells added to the program
18.
The concentration or values for the parameters contained in Lists 1 and 2 shall be
determined for samples collected from the groundwater monitoring points and reported
according to the schedule in Condition No. 21 and evaluated in
accordaiice with
Condition
No.
5.
LIST 1
FIELD PARAMETERS
STORET
CLASS I1
NUMBER BACKGROUND
STANDARD
*Bottom of
Well Elevation (ft. ref MSL)
72020
Depth to Water (ft. below land surface)
72019
Depth to Water (ft. from measuring point)
721 09
Elevation of Groundwater Surface
(ft. ref MSL)
7 1993
pH (units, unfiltered)
00400
6.46-8.27
6.5-9.0
Specific Conductance
(umhos/cm, unfiltered)
00094
3567.89
Temperature of Water sample (deg F)
0001 1
(* =
Reported Annually)
LIST
2
Constituent
(Unfiltered,
ug/L
unless othenvise noted)
Aluminum
Barium
Boron
Calcium
(mglL)
Chromium
Copper
CLASS
I1
STORET
BACKGROUND STANDARD
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

LIST 2 (cont.)
Constituent
(Unfiltered,
ug/L
CLASS I1
unless otherwise noted)
STORET
BACKGROUND STANDARD
Iron
Lead
Magnesium
(mg/L)
Manganese
Mercury
Phosphorus
(mg/L)
Potassium (mg/L)
Nickel
Nitrate as
N (mg/L)
Sulfate (mg/L)
Total Dissolved Solids (mg/L)
Vanadium
Zinc
19.
All monitoring points shall be maintained in accordance with the approved permit
application such that the required samples and measurements may be obtained.
20.
Sampling should commence concurrently with issuance of the permit. The established
background should be taken over one year and include at least
4 sampling events. The
first quarterly samples shall be performed on samples taken during the months of'
October/November, 2000 and the results submitted to the Illinois EPA by January 15,
2001. The first statistical evaluation in accordance with Condition No. 5 above shall be
performed on samples taken
OctoberDJovember, 2001 and the results submitted to the
Illinois
EPA by January 15,2002.
21.
The schedule for sample collection and submission of quarterly monitoring results is as
follows:
Sampling Quarter
Sampling; Due
Report Due Date
Jan-Feb
(1 st)
List 1 and
2
April-May (2nd)
List 1 and 2
July-Aug (3rd)
List 1 and 2
Oct-Nov (4th)
List 1 and
2
April 15
July 15
October 15
January
15
1
-
Field Parameters
2
-
Indicator Parameters
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Page 6
22.
Annually, the operator shall prepare an assessment of the monitoring program which
shall include an evaluation of the groundwater flow direction and the hydraulic gradients
at the facility. This assessment shall be submitted with the monitoring results due on July
15.
23.
Information required by Conditions 3 and 2 1 of Attachment A must be submitted in an
electronic format. The information is to be submitted as fixed-width text files formatted
as found in Attachment
C. Additional guidance regarding the submittal of the
information in an electronic format can be found at
www.epa.state.il.us/land/re~ulatory-
programs/permits-and-management/index.html.
24.
The operator shall collect one
(I) sample each of incoming landscape waste, screen
overs, and steel slag, then analyze each sample for chromium, copper, lead, magnesium,
and nickel using a 60-day SPLP extraction as proposed in the addendum, dated May 10,
2006, to Log No. 2004-308. Methodologies, as described in the addenda dated May
10,
2006 and July 20, 2006 to Log No. 2004-308 shall be utilized. Methodologies and
discussion of results shall be submitted to the Illinois EPA in the form of a
permit
application no later than January 15,2007.
25.
The operator shall excavate test pits (as proposed in the addendum dated May 10,2006 to
Log No. 2004-308) at the nine (9) locations specified in Attachment 1 to the addendum
dated July 20,2006 to Log No. 2004-308. Test pits shall be inspected in accordance with
the methods described in the addenda, dated May 10,2006 and July 20,2006, to Log No.
2004-308. Photographs, observations, and conclusions shall be submitted to the Illinois
EPA in the form of a permit application no later than January 15, 2007.
26.
The operator shall conduct a "downhole" survey at well
GlOl and G104 as proposed in
the addendum, dated February 9,2006, to Log No. 2004-308.
h/lethodologies, as
described in the addendum, dated February 9,2006, to Log No. 2004-308, shall be
utilized. Results and conclusions shall be submitted to the Illinois EPA in the form of
a
permit application no later than January 15, 2007.
27.
The operator shall collect one (1) sample from the outlet pipe for the facility's underdrain
system, as proposed in the addendum, dated May 10,2006, to Log No. 2004-308. The
sample will be analyzed for permitted groundwater parameters. Methodology, results,
and conclusions shall be submitted to the Illinois EPA in the form of a permit application
no later than January 15,2007.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ATTACHMENT B
A. This method should be used to predict the confidence limit when single groundwater
samples are taken from each monitoring (test) well.
1.
Determine the arithmetic mean (xbTof each indicator parameter for the
background sampling period. If more than one background (upgradient) well is
used, an equal number of samples must be taken from each well.
Where:
X
b
=
Average background value for a given chemical parameter
Xn
=
Background values for each upgradient sample
n
=
the number of background samples taken
2.
Calculate the background variance (Sb
2
)
and standard deviation (Sb) for each
parameter using the values
(Xn) from each background sample of the upgradient
well(s) as follows:
3.
Calculate the upper confidence limit using the following formula:
Where:
CL
=
upper confidence limit prediction
(upper and lower limits should be calculated for pH)
t
=
one-tailed t value at the required significance
level and at
n-1 degrees of freedom from Table 1
(a two-tailed t value should be used for pH)
4.
If the values of any routine parameter for any monitoring well exceeds the upper
confidence limit for that parameter, the permittee shall conclude that
a statistically
significant change has occurred at that well.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

5.
When some of the background (upgradient) values are less than the Method
Detection Limit (MDL), a value of one-half
(3) the MDL shall be substituted for
each background value that is reported as less than the MDL. All other
computations shall be calculated as given above.
B.
If all the background (upgradient) values are less than the MDL for a given parameter,
the Practical Quantitation Limit (PQL), as given in 35
Ill. Adm. Code Part 724 Appendix
I shall be used to evaluate data from monitoring wells.
Table 1
Standard T-Tables Level of Significance
-
t-values
t-values
Degrees of freedom
(one-tail)
(two-tail)*
99%
95%
99%
95%
3
4.541
2.353
5.841
3.182
4
3.747
2.132
4.604
2.776
5
3.365
2.01 5
4.032
2.571
6
3.143
1.943
3.707
2.447
7
2.998
1.895
3.499
2.365
8
2.896
1.860
3.355
2.306
9
2.821
1.833
3.250
2.262
10
2.764
1.812
3.169
2.228
11
2.718
1.796
3.106
2.201
12
2.681
1.782
3.055
2.179
13
2.650
1.771
3.012
2.160
14
2.624
1.761
2.977
2.145
15
2.602
1.753
2.947
2.131
16
2.583
1.746
2.921
2.120
17
2.567
1.740
2.898
2.110
18
2.552
1.734
2.878
2.101
19
2.539
1.729
2.861
2.093
2 0
2.528
1.725
2.845
2.086
2 1
2.518
1.721
2.83 1
2.080
22
2.508
1.717
2.819
2.074
23
2.500
1.714
2.807
2.069
2
4
2.492
1.711
2.797
2.064
25
2.485
1.708
2.787
2.060
3 0
2.457
1.697
2.750
2.042
4 0
2.423
1.684
2.704
2.02 1
Adopted from Table
I11 of "Statistical Tables for Biological Agricultural and Medical Research"
(1 947.
R.A. Fisher and F. Yates).
*For pH only.
SFN:JKR:bjh\O61581s.doc
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

EXHIBIT B
OPERATING PLAN
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ANDREWS ENVIRONMENTAL ENGINEERING INC. 3535 Mayflower Blvd,, Springfield, IL 6271 1 / (21 71 787-2334
February 9, 2006
Gary Cima
Illinois Environmental Protection Agency
Bureau of Land
- #33
Permit Section
1021 North Grand Avenue East
P.O. Box 19276
Springfield,
IL 62794-9276
re:
091 0355001
- Kankakee County
Joyce Farms Recycling, Inc.
Renewal Permit Application
Permit Application, Log No. 2005-21 9
Dear Mr. Cima:
On behalf of our client, Joyce Farms Recycling, Inc. (Joyce Farms), we are pleased to
submit an original and three copies of a revised Operating Plan for the permitted
landscape waste compost facility. The Operating Plan has been revised based upon
comments received from the Illinois EPA during a December 6, 2005 meeting.
If you have any questions regarding this matter, please contact me at (217) 787-2334.
Thank you.
Sincerely;
Sean
C. Chisek, P.E.
Project Engineer
enclosure
cc:
Patrick Joyce
- Joyce Farms Recycling, Inc.
Tamra
J. Legacy - HomeStar Bank
Claire Manning
- Brown, Hay & Stephens, LLP
Donna Shehane - Kankakee County Planning Department
J:\2000-136\Doc\2006\CvrLtr 2-9-2006.doc
Made wifh Recycled Fiber
FAX: (21 7) 787-9495
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

~
Joyce Farms Recycling, Inc.

Back to top


Permitted Landscape Waste Compost Facility

Back to top


Operating Plan

Back to top


February 2006
Prepared for:
Joyce Farms Recycling, Inc.
Essex, Illinois
Prepared by:
Andrews Environmental Engineering Inc.
3 5 3
5
Mayflower Boulevard
Springfield, Illinois 627
1 1
Tel: (2 17) 787-2334
-
Fax: (717) 787-9495
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

JOYCE
FARMS
RECYCLING.
INC
.
PERMITTED LANDSCAPE WASTE
COMPOST
FAClLlTY
OPERATING PLAN
TABLE OF CONTENTS
I GENERAL
...............................................................................................................
1
2 PERSONNEL AND
JOB
RESPONSIBILITIES
......................................................
3 EQUIPMENT
................ ..
.....................................................................................
2
4 PROCESSING OF LANDSCAPE MATERIAL
........................................................
3
4.1
Incoming Material
...........................................................................................
4
4.2
Material Grinding and Mixing ........................................................................... 5
4.3
Windrow Formation and Management
.............................................................
5
4.4
Finished Compost ............................................................................................ 6
5
MONITORING
...................................................................................................
7
5.1
Windrow Monitoring
.........................................................................................
7
5.2
End-Product Compost Monitoring
....................................................................
9
6 LITTER CONTROL
...............................................................................................
10
7 TRAFFIC AND DUST CONTROL
.........................................................................
12
8 ODOR CONTROL
.................................................................................................
13
9 VECTOR CONTROL
..........................................................................................
14
10
FIRE
PROTECTION
.....................................................................................
15
I I
STORMWATER CONTROL
.......................................................................
15
12
.................................................................................
PERSONNEL TRAINING
17
13
CONTINGENCY PLAN
...................................................................................
17
14
RECORDKEEPING AND REPORTING REQUIREMENTS
...............................
19
Joyce Farms Recycling. Inc .
Operating
Plan (February
2006)
Andrews Environmental Engineering . Inc .
Page i
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

1 GENERAL
This document constitutes the operating plan for the permitted portion of Joyce Farms
Recycling Compost facility (Joyce Farms). Joyce Farms is a compost recycling facility
that receives landscape waste from a variety of sources, including corporations and units
of local government. The facility is subject to relevant provisions of Parts
830-832 of the
regulations of the Illinois Pollution Control Board ("Board")
35 111. Adrn. Code 830-832.
Figure 1 in Attachment 1 shows the general layout of Joyce Farms.
The provisions contained in this document do not constitute regulations, nor are they
specific permit conditions. While the operations of the facility are based upon this
Operating Plan, the plan itself is a working document. Reasonable variations from this
plan resulting from operational needs do not constitute violations of the permit, the rules
of the Pollution Control Board or the Environmental Protection Act.
2
PERSONNEL
AND
JOB RESPONSIBILITIES
The Operator of the facility is Patrick J. Joyce, who has been trained in the proper
operations of composting facilities by Advanced Composting Systems, Inc. Mr. Joyce
has ultimate responsibility for all of the activities and operations of the facility.
The facility employs adequate personnel to process landscape waste as required by the
provisions of the Board's rules referenced above. Personnel perform the following
specific job responsibilities and functions:
Gate Attendant
- The gate attendant will be responsible for maintaining volumetric
records of the inbound and outbound material. This person will also be responsible for
securing the site at the end of the operating day.
Equipment Operator-
The equipment operator will be responsible for building windrows,
combining materials into storage
piles, and for operating the grinder, trommels,
screening and windrow turning equipment. The equipment operator shall be responsible
for performing all maintenance activities on the equipment, watering the roadways and
collecting litter at the facility.
Laborers
- Laborers will be utilized at the facility on an as-needed basis. Laborers will
be used to collect litter, perform monitoring, watering of the roads
and windrows,
equipment maintenance and other duties assigned.
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrews Environmental Engrneering, lnc.
Page 1
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

3
EQUIPMENT
The facility maintains equipment adequate to process incoming landscape waste as
required by the relevant Board regulations. The following equipment, or equipment with
similar characteristics, will be utilized at the facility:
Frontier TB-12 Windrow Turner
- This unit is a tow-behind windrow turner capable of
turning all windrows in one day.
Case International 8940 Tractor
- This unit is used to tow the windrow turner.
Fiatallis Loader
- This unit is maintained to turn windrows in the event the Frontier
windrow turner is not operational.
Grinder
- Incoming material is passed through the grinder to obtain a more uniform
particle size.
Dump Trucks
- Trucks are used to place the material into windrows.
Tractors
with
Spreaders
- Tractors with spreaders are used to form composting
windrows.
Trommel Screens
- Trommels are used to screen the finished compost.
Loader
-
A
loader is used to load end-product compost into the trommels for screening
and to load end-product compost into trucks for use
offsite.
Proper maintenance of the facility's equipment is important to allow for proper operation
of the facility. All utilities necessary for safe operation including, but not limited to, lights,
power, water supply and communications equipment, will be available at the facility at all
times. The facility maintains a garage with supplies for the care and repair of equipment.
Equipment is visually inspected at the end of each operating day. Should an inspection
identify a problem with a piece of equipment, the piece of equipment will be repaired. In
the event a piece of equipment will be placed out of operation for longer than
24 hours, a
Joyce Farms Recycling, inc.
Operating Plan
(February
2006)
Arldrews Environmental Engineering, Inc.
Page 2
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

third-party equipment vendor, such as those listed below, will be contacted and a
replacement piece will be utilized until the piece of equipment is operational.
Union Hill Sales and Service, Inc.
61 Center Street
Union Hill,
IL
(8 1 5) 426-6 1 03
Vermeer-Illinois
(630) 820-3030
Wildcat Manufacturing Company, Inc.
(800) 627-3954
Tobey's Construction & Cartage
104 S. Park Road
Herscher,
IL
(8 1 5) 426-21 46
West Side Tractor
310
W. 162" Street
South Holland,
IL
(708) 331 -71 50
4
PROCESSING
OF
LANDSCAPE MATERIAL
The facility was established and originally permitted in 2000, for the purpose of receiving
landscape waste from haulers and producing compost for sale that meets the end-use
standards set forth in Subpart
E of Part 830 of the Board's rules.
The area of land dedicated to the permitted composting facility, which is the subject of
this Operating Plan, covers approximately 13.6 acres
in Essex Township, Kankakee
County, and is centrally located in the middle of a traditional farming operation, which
constitutes approximately 360 acres in total. This acreage has been operated as a farm
by the Joyce's for generations. The boundaries of the 13.6-acre permitted facility are
permanently staked so that such boundaries are immediately identifiable.
The actual entrance to the facility is located approximately one-half mile from
3000N
Road, which is a public road (a blacktopped township road) providing access to the
Joyce property and, ultimately, to Joyce Farms Recycling.
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, Inc.
Page
3
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

4.1
lncoming Material
The facility is open to receive material from
6:00 a.m. to 7:00 p.m. Monday through
Friday and
6:00 a.m. to noon on Saturday. As a practical matter, haulers are advised to
be at the facility, at the latest, by around
6:00 p.m. The facility processes landscape
waste and utilizes the additives listed below:
Water
o
End-cuts of dimension lumber
a
lnoculant bacteria
Fruit and vegetable waste from Del Monte Fresh Produce, 12 Stuart
Drive, Kankakee, Illinois.
Fruit and vegetable waste shall consist
primarily of lettuce, pineapple husks, melon rinds, cabbage, onions,
carrots, broccoli, cauliflower and grapes.
Other than water, no additive or combination of additives will exceed
10 percent by
volume of the composting material.
To ensure that additives do not exceed
10 percent
by volume of the composting material, a record of the quantity and type of landscape
waste and additives are kept and maintained at the facility. Additives will only be
accepted when there is sufficient volume of landscape waste or composting landscape
waste available that day to blend with the additives.
Trucks are unloaded in the facility's permitted receiving area.
While each truck is
unloading, the material will be inspected for litter. During unloading, the loads are turned
several times with
a loader to help in the removal of litter. Litter will be removed by
hand-picking when the material is unloaded and placed in covered receptacles for
disposal at a permitted facility. Litter control is discussed in detail in Section 6 of this
Operating Plan.
lncoming material will be processed within
24 hours after receipt into windrows or other
piles that promote proper conditions for composting, lncoming leaves, brush or woody
landscape waste need not be stored in windrows, but can be stored in designated areas
for ease of use as a carbon source and bulking agent.
Joyce Farms Recycling, Inc.
Operating Plan (Februaiy
2006)
Andrews Environmental Engineering, inc.
Page 4
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Up to 170,000 cubic yards of material may be received at the facility each year.
Attachment
2 contains a capacity calculation demonstrating the facility has the capacity
to compost this volume.
4.2 Material Grinding and Mixing
After unloading, landscape waste will be sent through the grinder to create a smaller,
more uniform particle size. The facility will maintain a
carbonhitrogen (CIN) ratio of
approximately
25 to 1 in the windrows. lncoming yard waste varies with the season and
weather conditions
(e.g., grass is generally plentiful in the spring and summer months, in
the fall, leaves are plentiful). Stored leaves and brush are utilized to maintain the proper
ratio. Spring months typically need
more carbon added than the summer and fall
months. To ensure a proper CIN ratio, material will be mixed as it is being ground, or
mixing will occur after grinding has been completed. Typically,
material grinding will
occur during the hours of
6:00 a.m. through 5:00 p.m. Monday through Friday and 6:00
a.m. to noon on Saturday. During peak seasons where the volume of incoming
landscape waste increases
(i.e., generally during the months of May, June and
November), material grinding will occur during the hours of
6:00 a.m. through 8:00 p.m.
Monday through Friday and
6:00 a.m. to 4:00 p.m. Saturday.
A stockpile of leaves is maintained at the facility to ensure there is an adequate volume
of material on site to maintain the appropriate CIN ratio during all seasons.
4.3 Windrow Formation
and
Management
After grinding is completed and the material has been mixed to the proper
CIN
ratio, the
material is placed into windrows. lncoming landscape waste will be processed into piles
or windrows within
24 hours after receipt. lncoming leaves, brush and woody landscape
material may be stockpiled in designated locations for future use as a carbon source
and/or bulking agent.
Two dump trucks and two tractors with spreaders are utilized in the formation of
windrows. Initially, windrows are approximately 6-feet high, 12-feet wide at the base,
and 6-feet wide at the top. Aisles between the windrows are maintained at approximately
10 feet in width, in order to provide sufficient space for housekeeping operations, visual
Joyce
Farms
Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, lnc.
Page 5
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

inspection and firefighting operations. Windrow formation occurs from 6:00 a.m. to
7:00
p.m. Monday through Friday and 6:00 a.m. to noon on Saturday.
Windrows are monitored to ensure the material is maintained in an aerobic state and is
composting properly. Section
5 of this Operating Plan contains the monitoring plan for
the windrows.
Windrows are turned a minimum of 4 times per year and not less than once every 6
months. Generally, windrows are typically turned
3 to 4 times during the first week after
formation;
3 times during the second week after formation; twice during the third week
after formation; and once per week the fourth week and after. The frequency of windrow
turning may vary slightly depending on temperature, moisture content and oxygen levels
of the windrows. Windrows are turned during the hours of
6:00 a.m. through 4:00 p.m.
Monday through Friday and
6:00 a.m. through noon Saturday.
In general, after approximately
3-4 weeks, the landscape waste has reduced in size
enough to allow windrows to be combined together. After combining, windrows are
approximately 6-feet high, 12-feet wide at the base, and 6-feet wide at the top.
Prior to turning windrows or moving compost material, the facility will consider time of
day, wind direction, percent moisture, estimated odor and dust potential, and degree of
compost maturity to minimize the impact to
offsite residences.
Incoming material is turned into finished compost after approximately 8 weeks, except
during winter months when the windrows are dormant.
4.4
Finished
Compost
Finished compost is stockpiled along the northeast corner of the facility prior to
screening. Finished compost may be screened with
2 trommel screens and one loader.
Screening operations may occur during the hours of 6:00 a.m. to 11:OO p.m. Monday
through Friday and
6:00 a.m. to 6:00 p.m. on Saturday.
The finished compost is passed through a
trammel equipped with a % inch screen to
remove any remaining non-compostables. After passing through the trommel, there are
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
Page 6
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

two material classifications, end-product compost and screen-overs.
End-product
compost is stockpiled in a designated location until it is loaded for use outside the
permitted facility. The screen-overs typically consist of non-compostable material and
finished compost. In the event the screen-overs contain a high percentage of finished
compost, based upon visual inspection, the screen-overs will be allowed to dry for up to
90 days. Screen-overs are stored in the western portion of the finished compost area
and are capped when necessary to prevent blowing litter. After drying, the screen-overs
will be passed through a trommel a second time to separate the finished compost from
the non-compostable material. The management of the non-compostable material is
discussed in Section
6, Litter Control.
The end-product compost is monitored to ensure it meets the criteria for general use
compost. The monitoring procedures of end-product compost are discussed in Section
5 of this Operating Plan.
After screening is complete, the end-product compost, which has met general use
standards, is loaded onto trucks for sale or use
offsite. The loading of end-product
compost occurs from 5:30 a.m. to 4:00 p.m. Monday through Friday and 6:00 a.m. to
noon Saturday.
5
MONITORING
Monitoring of the windrows is important to ensure the compost operation maintains an
aerobic state and to ensure the material will be composted quickly. Monitoring of end-
product compost is important to ensure the end-product compost meets the general use
compost standards described in 35
111. Adm. Code Part 830. This section describes the
procedures for monitoring the windrows and end product compost.
5.1
Windrow Monitoring
To maintain an aerobic operation and to minimize potential odors, careful monitoring of
the windrows will be conducted. Table
1 indicates the parameters to be monitored and
the desired parameter ranges to be maintained in the windrows.
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrdws Environmental Engineering,
inc.
Page 7
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Table1 . Monitoring Parameters and Desired Ranges
Temperature, moisture and oxygen will be monitored with appropriate equipment. The
temperature of each windrow is monitored at depths of
18 and 48 inches. Temperature
is monitored each operating day, except during the months of January and February.
During the months of January and February, the windrows are usually dormant due to
the low air temperature. During the months of January and February, the windrow
temperature will be monitored once per week. Moisture content is monitored twice per
week, except in January and February when windrows may be frozen at which time
moisture content will be monitored once per week,. Windrow Oxygen levels are
monitored once per week.
In the event monitoring indicates a windrow has fallen out of the desired ranges listed in
Table 1, the activities listed below will take place as necessary. These activities will be
completed within 24 hours of discovery the desired ranges are not being maintained.
The windrow may be turned to add oxygen, lower the temperature and dry the
material.
o
A carbon source, such as woody material may be added to increase aeration.
Water or other sources of moisture
(i.e., fruit and vegetable waste, etc.) may
be added to lower the temperature or to increase moisture content.
m
A nitrogen source, such as grass, may be added to increase the temperature.
Joyce Farms Recycling, Inc.
Operating Plan
(Febmary 2006)
Andrews Environmental Engineering, Inc.
Page 8
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

5.2 End-Product Compost Monitoring
It is planned that end-product compost will meet the general use compost standards and
be used
offsite as a vegetative amendment. In the event the monitoring described in this
Operating Plan indicates the end-product compost does not meet the general use
compost standards, the material will be placed into windrows for further composting.
Monitoring, inspection and testing of end-product compost will be performed to ensure
the compost:
Is free of any materials that pose a definite hazard to human health due to
physical characteristics, such as glass or metal shards;
a
Does not contain manmade materials larger than four millimeters in size
exceeding
1 percent of the end-product compost, on a dry weight basis;
a
Has a pH between 6.5 and 8.5;
Has reached stability, as demonstrated by one of the methods prescribed in
35
Ill. Adm. Code 830.Appendix B, or utilizing stability tests outlined by
Midwest Bio Systems contained in Attachment 3 of this Operating Plan;
a
Does not exceed, on a dry weight basis, the inorganic concentrations set forth
in
35 111. Adm. Code 830.Table A; and
a
Does not contain fecal coliform populations that exceed 1,000 MPN per gram
of total solids (dry weight basis),
or Salmonella species populations that
exceed 3
MPN per 4 grams of total solids (dry weight basis).
End-product compost will be analyzed for the parameters listed in
35 111. Adm. Code
830.503 at a frequency of once for every 5,000 yd3 of end-product compost shipped
offsite, or once per year if less than 5,000 yd3 of end-product compost is shipped offsite.
Sample collection, preservation and analysis will be done in a manner that assures valid
and representative results. A composite sample is prepared by utilizing either of the
following
two methods:
A. Twelve grab samples, each 550 milliliters in size, will be taken from the end-
product compost at the facility, in the following manner:
Joyce Farms Recycling, lnc.
Operating Plan (February 2006)
Andre~vs Environmental Engineering, Inc.
Page 9
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

1. Four grab samples from points both equidistant throughout the length and
at the center of the windrow or other pile, at a depth not less than one
meter from the surface of the windrow or other pile;
2. Four grab samples from points both equidistant throughout the length and
one quarter the width of the windrow or other pile, at a depth not less than
half the distance between the surface and the bottom of the windrow or
other pile; and
3. Four grab samples from points both equidistant throughout the length and
one eighth the width of the windrow or other pile, at a depth not less than
half the distance between the surface and the bottom of the windrow or
other pile.
4. The twelve grab samples will be thoroughly mixed to form a homogenous
composite sample. Analyses will be of a representative subsample. The
sample holding times, sample container types and minimum collection
volumes listed in
35 111. Adm. Code 830.Table B shall apply; or
B. Sampling methods set forth in Test Methods for Evaluating Solid Waste,
Physical/Chemical Methods (SW-846).
The performance test methods listed in 35 Ill. Adm. Code 830.Appendix B will be utilized
to ensure end product compost is stabilized and meets the general use compost criteria.
Compost samples will also be analyzed for the inorganic parameters listed in
35 111. Adm.
Code
830.Table A.
6
LITTER
CONTROL
The section discusses the various steps that the facility will employ to minimize the
presence of litter at the facility.
Generators, truck drivers and transfer stations will be instructed as to the types of
material the facility is permitted to accept.
As incoming vehicles are unloaded, laborers
will inspect the material for material that does not fit the permitted description.
Generally, two laborers will be assigned to inspect loads as they are unloaded. These
loads are then turned several times with a loader to assist in the efficiency of removing
any unpermitted material. When there are no trucks being unloaded, these same two
Joyce Farms Recycling, inc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
Page
10
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

laborers will remove unpermitted material while grinding operations are taking place.
Two additional laborers patrol the facility grounds and windrows each day the facility is
operating. These additional laborers can also be utilized to inspect incoming loads
during busy times of the year, such as the fall leaf season.
Haulers and generators that bring landscape waste with an unacceptable amount of
non-compostab[es, based upon visual inspection, will be subject to the following actions.
The driver will be informed of the types of waste the facility accepts;
a
The generator will be contacted and informed of the types of waste the facility
accepts;
a
The facility may reject the load.
If unpermitted material is found, it is removed and placed in a covered container.
An 8
cubic yard container is typically located on the east edge of the receiving pad. A 20
cubic yard dumpster is also located at the facility. Both containers can be moved around
the facility as needed to facilitate litter collection.
The area around the processing area will
be patrolled throughout each operating day by
all employees. This area has additional fencing to aid in containment of litter.
Unpermitted material is placed in garbage bags. Before lunch and at the end of the
day,
all collected material is placed in the two previously mentioned receptacles.
Litter screens are utilized to control litter during grinding and
trornmelling operations.
Screens are located at the down wind side of the grinding and screening areas. When
litter can not be contained due to excessive winds, grinding and
trommelling operations
will be suspended until weather conditions improve and litter can be controlled.
If necessary, a portable vacuum unit will be utilized to collect litter. Vacuumed litter
will
be placed in a covered receptacle and disposed at a permitted facility.
In the screening of end-product compost, all screen-overs will be placed in a designated
area. If necessary to contain the screen overs, the material will be covered with end
product compost. When screening operations are conducted, the screen overs are
visually inspected to determine their compost content. When the moisture content of the
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrews Environmental Engineering. Inc.
Page
I
I
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

end product compost is high, the screen overs may contain a high percentage of end
product compost.
If the compost content in the screen overs is high, the material
is
allowed to dry and is re-screened. When screening is completed, the screen overs are
disposed of at a permitted facility.
The receiving area will be inspected each operating day for litter. Aisles between
windrows will be inspected each operating day for litter. The windrows are also
inspected for litter after they are turned. Collected litter is placed in a covered receptacle
and disposed at a permitted facility.
Fencing is located around the agricultural buffer surrounding the site. This fencing is
inspected each operating day and is cleaned when necessary. In the event of high
winds, which carry litter outside the facility boundaries, additional laborers will be
obtained to control litter as necessary.
Salvaging is not permitted at the facility.
7
TRAFFIC AND DUST
CONTROL
Proper traffic control is important to minimize traffic related impacts to the surrounding
community. The facility may receive incoming loads of material from
6:00 a.m. to 7:00
p.m. Monday through Friday and 6:00 a.m. to noon on Saturday. Incoming trucks are
expected to comply with road weight limits and any other regulatory requirements when
delivering material. Joyce Farms informs incoming haulers of the road weight limits of
roadways leading to the facility.
Staging of incoming trucks on public roadways is not
permitted. Should a vehicle arrive before the facility's permitted receiving time, the
vehicle will be staged on the private lane leading to the facility, and not on a public
roadway.
To control dust, the facility's receiving area and entrance road are watered as
necessary. Water used in dust control will be obtained from
a watering tank that
contains water from the Joyce Farms private wells. Water for dust control is available at
all times the facility is operating. The entrance road is also periodically treated with
calcium chloride. Generally, the entrance road is treated with calcium chloride when the
Joyce
Farms
Recycling, lnc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
Page 12
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

adjacent public road is treated with calcium chloride, as the same company treats both
roadways.
Open burning is prohibited except in accordance with
35 111.
Adm. Code
200 through
245.
Mud tracking onto public roadways is prevented by the facility's access roadway, which
is approximately one-half mile in length. If necessary, vehicles exiting the facility will be
washed to minimize mud tracking.
8
ODOR CONTROL
Odor control measures are important to minimize odors from the permitted compost
facility. Odor control measures include the measures in this Section, plus proper
management of compost material, litter control, traffic control and dust control.
Generally, odors will be controlled by maintaining the windrows within the desired ranges
specified in Section
5 of this Operating Plan. Facility personnel will periodically check for
odors which may travel
offsite.
As discussed previously, all incoming loads are inspected when unloaded. Incoming
loads that are very odorous will be rejected.
The compost material is blended with leaves and brush as necessary to maintain the
desired
CIN ratio and to minimize odors. After grinding the incoming material will be
formed into windrows. Proper windrow size should be maintained so as to minimize
odors.
See Section
4.3. Maintaining the temperature, oxygen and moisture content of
the windrows within the desired ranges described in Table
1 will minimize the potential
for odor. In the event the temperature, oxygen or moisture content of a windrow falls
outside the desired ranges listed in Table
1, the steps described in Section 5.1 will be
taken to maintain the windrow within the desired operating ranges.
Bulking agents, such as woody landscape waste is maintained and available at the
facility to help aerate the windrows and minimize odors.
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, Inc.
Page
13
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Odor checks will be performed three times each operating day. Odor checks will be
performed at on- and
offsite locations. Generally, the odor checks will be performed at
approximately
6:00 a.m., midday and 6:00 p.m. The timing of the odor checks may
change based upon facility operations.
Odor checks generally consist of driving the
perimeter of the permitted facility, both up- and downwind, and driving around the one
square mile section surrounding the facility.
If an odor check detects an odor, a closer
inspection along the windrows will be conducted. After the source of the odor has been
identified, the actions described in Section 5.1 will take place to maintain the windrow
within the desired operating ranges. The results of the odor checks are kept in a log
maintained at the facility's office.
In the event the facility receives an odor complaint, the facility will record and report the
following to the Illinois
EPA within 24 hours after receiving the complaint:
The date and time received;
The name of complainant;
The address and phone number of complainant, if volunteered upon request;
and
o
The name of the personnel receiving the complaint.
The facility will record the date, time and nature of any action taken in response to an
odor complaint, and report this information to the Illinois EPA, at the address below,
within
7 days after the complaint is received.
Illinois Environmental Protection Agency
Bureau of Land, Permit Section
1021 North Grand Ave. East
P.O. Box 19276
Springfield, Illinois 62794-9276
9
VECTOR CONTROL
Vectors are controlled by removing non-compostables from the cornposting material and
storing of non-compostables in covered receptacles prior to disposal. Fly traps are
utilized at various locations throughout the facility.
Fly traps are relocated as necessary
to provide maximum effectiveness. Fly traps will be inspected once per week during the
months of March
- November.
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Gndrews Environmental Engineering, Inc.
Page 14
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

As discussed in Section 5.1, windrow temperature will be maintained between
135'
and
160°F during weeks
3 through 5 after windrow formation, so as to ensure fly eggs and
larva, as well as any parasitic organisms are destroyed. Maintaining windrows within the
desired ranges described in Section 5, and turning the windrows disrupts the lifecycle of
flies and minimizes the number of flies.
10
FIRE PROTECTION
Proper operation of the facility should eliminate the risk of fires. A supply of water is
maintained at the facility. Fire extinguishers will be maintained in the facility office and
garage. In the event of a fire that can not be contained by facility personnel, the fire
department will be called. Telephone access to the local fire department is provided in
the facility
ofice.
I?
STORMWATER
CONTROL
Proper grading and operations are important to maintain proper stormwater controls. In
accordance with 35
Ill. Adm. Code 830.202(g), the facility's grading and stormwater
retention pond are designed to manage runoff from the facility resulting from
precipitation less than or equal to the 10-year, 24-hour precipitation event. A
demonstration of the facility's stormwater management capacity was submitted to the
Illinois EPA in Permit Application, Log Nos. 2000-138 (approved on September
12,
2000) and 2005-1 60.
Water in the facility's stormwater retention pond will be pumped to a 1,000-gallon holding
tank and sprayed onto the windrows when windrow monitoring indicates the windrows
require additional moisture. The pump currently utilized is
a 5-horsepower,
1.5-inch
pump. This pump will be maintained in an operable condition. Should the pump fail, it will
be replaced by a pump of equal or greater capacity. Water from the retention pond is
pumped into a 1,000-gallon polyethylene tank, which is currently located on a trailer.
When windrows are turned, the trailer with the water tanks is towed by the windrow
turner and water is pumped into the windrows. Currently, water is pumped into the
windrows with a 5-horsepower pump. Should this pump fail, a new pump with similar
performance characteristics will be utilized. Generally, water is added to windrows as
they are turned when the retention pond is not frozen (typically during the months of
March through December). When the windrows are dormant (generally from January
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
Page 15
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

and February) the stormwater detention area is typically frozen and no pumping occurs
when the pond is frozen. The facility currently maintains an excavator on site should the
need arise to increase the size of the retention pond during emergency situations. In
addition, an additional pump will be utilized as necessary to pump water from the
retention pond during emergency situations.
The facility's retention pond has been sized to retain stormwater runoff resulting from a
10-year, 24-hour storm event. Generally, water in the retention pond will be allowed to
settle for a period of
2 days after a precipitation event. Based upon the types of
materials accepted at the facility
(i.e., leaves, grass, brush, fruit, wood), it is not expected
downstream waters will be impacted from the receipt of stormwater runoff from the
facility. Further, the retention pond is located approximately one mile from the nearest
source of surface water. Between the retention pond and the nearest source of surface
water is highly vegetated soil, which provides substantial filtering and effective
dispersion
of passing water. However, to ensure the protection of downstream water
quality, the gate valve which controls the discharge from the retention pond will only be
opened as needed
(e.g., after a storm greater than a 10-year, 24-hour storm), and only
for a maximum of
4 hours a day. All times when the gate valve is opened will be
recorded in
a log book maintained at the facility.
Within
48 hours after a precipitation event, the facility will be inspected. During the
inspection, facility staff will patrol aisles between
wind.rows. If an inspection indicates
there is water ponded between windrows, the area will be
diskedlbladed to eliminate
standing water. If and area cannot be
diskedlbladed to eliminate standing water, water
in that area will be removed by pumping to the
stormwater retention pond. Low spots
observed to be accumulating water during an inspection will be filled to promote surface
drainage in accordance with the currently approved site grading plan. Any disking,
blading, pumping or filling will be completed within
48 hours after the end of a
precipitation event.
Facility personnel are trained in regards to proper facility maintenance to ensure berms,
vegetative filters and ditches are maintained to properly control stormwater runoff.
Vehicles are not permitted to drive over the vegetative filters.
Joyce Farms Recycling, Inc.
Operating Plan
(February
2006)
Andrevvs Environmental Engineering, Inc.
Page 16
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

12 PERSONNEL TRAINING
The facility will train personnel in regards to the procedures and requirements contained
in this operating plan, the rules and regulations and the facility's permit to ensure
personnel are familiar with the requirements applicable to the facility. The facility
provides training in Spanish if necessary based upon the needs of its employees.
New employees will
be trained, prior to participating in, in facility operations,
maintenance procedures, and safety and emergency procedures relevant to their
employment.
In addition, annual personnel training will be provided, which will include, at a minimum,
a thorough explanation of the operating procedures for both normal and emergency
situations.
The operator will have personnel sign an acknowledgement stating that they have
received the training. These acknowledgements will be kept at the facility office.
This facility Operating Plan will be made available and explained to all employees.
13 CONTINGENCY PLAN
As discussed previously in this Operating Plan, the facility will implement measures to
control odors, vectors, traffic, dust and noise. As required by Section
830.212 of the
Board's rules, the facility also utilizes the following contingency plans when necessary.
a
Equipment Breakdown
As discussed in Section 3 of this Operating Plan, the facility maintains a
sufficient quantity of equipment for proper management of the facility, and
suppliers of replacement equipment are available if necessary.
Odors
Procedures for remedying odor complaints are contained in Section 8 of this
Operating Plan.
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, Inc.
Page
17
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

o
Unacceptable Waste Delivered to the Facility
The management of unacceptable wastes is discussed in Sections 5 and 7 of
this Operating Plan.
Groundwater Contamination
The facility will monitor groundwater in accordance with the approved permit.
Groundwater monitoring results will be reported to the Illinois
EPA in
accordance with the facility's permit. As the materials accepted at the facility
are natural
(i.e., leaves, grass, brush, fruit, wood), groundwater contamination
is not expected.
Any Accidental Release of Special Waste
The facility will not accept special waste. The facility implements a load
checking program and will reject loads carrying special waste. In the event a
special waste is received, the hauler who delivered the load will be contacted
to remove the load for disposal at an approved facility.
Conditions Such as Fire, Dust, Noise, Vectors, Power Outages, and Unusual
Traffic Conditions
Should a small fire develop, it will be extinguished with fire extinguishers
maintained at the facility. In the event of a fire that cannot be extinguished by
facility personnel, the fire department will be contacted.
Dust control is discussed in Section 7 of this Operating Plan.
Noise will be controlled by operating equipment during the times described in
Section
4 of this Operating Plan.
Vector control is discussed in Section
9 of this Operating Plan.
Should a power outage occur, equipment will be shut down as necessary
andlor a generator will be utilized until power is restored. A power outage is
not expected to cause an impact to human health
or the environment.
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, Inc.
Page 18
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Traffic control is discussed in Section 7 of this Operating Plan. The private
lane leading to the facility is long enough such that incoming trucks will not be
staged on public roadways.
14 RECORDKEEPING AND REPORTING REQUIREMENTS
Copies of the facility permit, design plans, operating plan and any required reports will
be kept at the facility so as to
be available during inspection of the facility.
The facility will keep records of the following information:
The quantity of each load of landscape waste received;
The origin, type and quantity of any additive accepted, when received at the
facility;
The type and quantity of any additive used in the composting process (water
added during composting need not be quantified), as quantified based on
a
monthly review of additives remaining;
The dates of turning of each windrow or other pile;
All monitoring data required pursuant to a facility permit;
Conditions evaluated to minimize dust and odor;
For any odor complaint received, the information collected as described in
Section
8 of this Operating Plan;
Details of all incidents that require implementation of the facility's
contingency plan, and methods used to resolve them;
Records pertaining to sampling and testing, as follows:
a. Locations in the composting area from which samples are obtained;
b. Number of samples taken;
c. Volume of each sample taken;
d. Date and time of collection of samples;
e. Name and signature of person responsible for sampling;
f. Name and address of the laboratory receiving samples, if applicable;
and
g. Signature of the person responsible for sample analysis.
Joyce Farms Recycling, lnc.
Operating Plan (February
2006)
Andrews Environmental Engineering, Inc.
Page 19
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

e
The daily quantity of each type of end-product compost removed from the
facility, according to the end-product compost classifications provided in
35
Ill. Adm. Code, Subpart E; and
Verification that requisite personnel training has been done.
The operator will keep dated copies of the end-product compost analyses required
pursuant to Section
830.504.
The records will be made available during normal business hours for inspection and
photocopying by the Illinois EPA. Such records will be kept for a period of three years,
subject to extension upon written request by the Illinois EPA and automatic extension
during the course of any enforcement action relating to the facility. Records will be sent
to the Illinois
EPA upon request.
On or before April
1 of each year, the operator will submit a written annual statement to
the Illinois EPA, on a form provided by the Illinois EPA the following:
An estimate of the amount of material, in tons, received for composting in the
previous calendar year;
An estimate of the amount and disposition of compost material (i.e., end-
product compost, chippedlshredded brush) in the previous calendar year;
and
a
A Composting Facility Financial Assurance Plan Compliance Certification in
accordance with the requirements contained in
35 111. Adm. Code 830.606.
Joyce Farms Recycling, Inc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
Page 20
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ATTACHMENT I
SITE LAYOUT DRAWING
Joyce Farms Recyciing, lnc.
Operating Plan (February 2006)
Andrews Environmental Engineering, Inc.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Back to top


*******I
***I****
*
* *
*
* *
%.
* *
"
* *
*
* *
* *
'UNllllgN
MARKER POST
* *
*
* *
*
* */
*
* *
*
* *
*
* *
*
**
w
/
/'
*
f
NOR OW^ '
*
4
*
* *
*
* *
*
* .I
*
*
*
*
* "
*
r---
W.1
*
*
"
*
*
*
"
V.
*
*.
*
*.
*
*.
GIUPRC
SCALE
*
*
*
*
9
*
*
*
*
+
*
*
*
*
WS ARE APPROXIMATE. THEY DIUENSIONS UAY
.
*.
*
*
.u
+.
.v
*
..
UPON OPERTATING CONDITIONS
SUCH
AS TIME
OF
V
*
*
*
*
*
*
*
*
*
*
*
*
*
*
I
IER. ME VCCUUES
ff
UATERIAL ACCEPTED. ETC
C IS
0-0
ON A ORABNG. AS-BUILTS PLAN.
XI
hl.
GINCERIDI. CEREAUX,
&
ASMaATE5.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ATTACHMENT 2
FACILITY CAPACITY
Joyce Farms Recycling, Inc.
Operating
Plan
(February
2006)
Andrews Environmental Engineering, Inc
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Given:
Average Windrow Length: 350 feet
Approximate Windrow Base Width: 12 feet
Approximate Windrow Top Width: 6 feet
Approximate Windrow Height:
6 feet
Average Number of Windrows: 35
Windrows are combined after 3-4 weeks, resulting in a capacity increase of 50%
Time to Finish Composting: 8 weeks
Average Number of Composting Cycles Per Year: 5
Volume of Each Windrow
= '/2 (1 2 ft + 6 ft) (350 ft) (6 ft) = 18,900 ft3/windrow
Total Volume of All Windrows
= (1 8,900 ft3/windrow) (35 windrows) = 661,500 ft3
Total As-Received Volume
Affer Windrows are Combined
= (1.5) (661,500 ft3) = 992,250 ft3
As-Received Annual Volume
= (992,250 ft3/cycle) (5 cycles/year) = 4,961,250 ft31year = 183,750 yd3/yr
As demonstrated above, the facility has the capacity to process up to 183,750 yd3 of
incoming material per year. However,
the facility will not accept over 170,000 yd3 of
incoming material per year.
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering, lnc.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

ATTACHMENT 3
MIDWEST 810 SYSTEMS COMPOST TESTING INFORMATION
Joyce Farms Recycling, Inc.
Operating Plan (February
2006)
Andrews Environmental Engineering,
Inc.
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

lHTERPWETATBOH"8UIBE
. .
b
A
. ..
BBC
L86wafo&s
. .
.
.
. .
. -
60MPOST MATUWJTV
Campost maturity
rafsrs
to
the
phytobxici~
(taxicity.ta
plank)
assscbted
w~th the
ccmpost, Immarure
ccmposrs can!ein
more growth inhibiting
substances than
rnolure
ccjrnpcasts.
Some
of
these
growth
inhibiting
compounds include
salts,
a,nrncnia,
phenglic
subs!ances.
heavy
mslals,
and
organic
aclds,
These rnaturjty
tests are conducted
on
both a Full
strength.compost extract
as
well
as a
orme-third
svength extract.
Use
the
results
from
the
full
strength
analysis
tor
ints-rpretatlon If
you
are using
compost as e
potting
material or for covaring a seed bed. If
your
compst
application includes incorporating the
compost
into
the
soll,
use
the
ant-third
6tmngth
analysis
results for
interpmbttion.
.
.
.
. .. ,
. . .
. .
.~-~
--
- ~-
Comport
strNlftyrefe~ to the dagree
lo
whlcir
composts
have
been
decomposed
to
mare
stable
materials.
This
analysis
can
tx
determined through
a
process
that
measures
the
amount of carbon
dioxide produced
'or
the arnounl
of oriygen
utilizad
by
a
spmlfl~ quantity or
compost over
a
s~ecific,amaunt
of
time under
conditions
spprdprl%te:
for microbial growth. This .
measuring
process
is
accomplished
with
s
respirometer which
tracks
carbon
dioxide and
oxygen
concentrations.
r
7
. ,, .
MATURIN
TEST
PARAMETER
Maturity
jgde,!'
Germlnation
Rsie
.
.
, I.
dm---.
-
.
.
A
mure
stable cornpast'~lll
have
lower
rsspication
rates
thar)
an unstable
cornpos!.
The
guidelirlas
usad
belw
are
e
goad gerieral referenbe,
for
compost
stgbility
as
determined
by
oxygen
utilization of
the
bjmpost
'
OPT~WL COMWST LEVELS
Greater
-....--
Ihsn
50%
Great&
than
85%
'
----..-.....-.....I.
em----
~or~~cult"rs
Applications -
Less
then
6
dS/m
Agricukure applications -
Less
lhan
tO
dSIm
6.5
- 8.5
. ..
. &
-
Respiration Uab
Cumrnenb
--
I
mp
G;IKa
compost
dry
sollde-h~ur
I
Accepbble
br
horficultural
app!bcaTbns with
. ..
--
I
scnsitive,planls
100
mg
Oz/Kg
compsc
dry
solids-tour
I
For addittonal joforrnatjon, visit the web site
rt
www.hbclsb.com
BBC
Ldorstorieu,
121
7
North
Stodcm DI-ivc,
Trmpc,
AZ 'A5281
(dBO) 967-5931
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Wad
Journal of
Environmemal
Qualb'.
-
2311
177-1
183
(19a)
Journal
of
Environmenfal
Quality,
23:1177-I183 (19H)
MaSA
104.3,
Saturated
Pask
'Sm
Attached I~rp~~on
Guide
?n C~mpast
M~bLldty
ELECTRONIC FILING, RECEIVED, CLERK'S OFFICE, SEPTEMBER 1, 2006
* * * * * PCB 2007-015 * * * * *

Back to top