ILLINOIS POLLUTION CONTROL BOARD
February 14,
1973
COMMONWEALTH
EDISON COMPANY
~71—l29
v.
ENVIRONMENTAL PROTECTION AGENCY
ORDER OF THE BOARD
(BY SAMUEL
T.
LAWTON,
JR.):
We entered an Opinion and Order which, among other things,
granted
a variance with respect to Units
1,
2,
3 and 4 of Common-
wealth Edison’s Powerton Station in Pekin, Illinois.
Paragraph
9
of
the Order provided as
follows
(Order of October
14,
1971):
“The Company shall file quarterly reports, commencing
December 31,
1971, with the Agency,
detailing its progress
toward completion of its program.
Such reports shall also
detail Edison’s projected annual peak load,
its daily
projected peak load,
and the Powerton Station generation
for each day
in each month compared
to the power generation
for the same day in the same month in the previous two
years, prepared much in the manner as Commonwealth Edison
Exhibit
No.
53
.“
On February
1,
1973,
the Environmental Protection Agency
filed a
“Motion for Clarification of Quarterly Reports” asserting
that it could not tell from the quarterly reports whether Unit 5
of Powerton is included in the reports, and requested more accurate
reporting with respect to kw
hours generated by each unit,
the
scheduled outages on the system on a unit by unit basis and the
unscheduled outages on a unit by unit basis.
The Company’s response indicated that the reports do not include
Powerton Unit
5, which response should dispose of
this problem.
The
remainder of
the Company’s response indicated the difficulty and
impracticality of furnishing the information sought by the Agency.
We believe that the information sought by
the Agency
is not unreason-
able providing that it relates
to
a reporting of events that have
already occurred and not those which have been projected into the
future, and that reporting of kw hours generated by each unit be on
a gross generation basis.
We see no reason why the Company cannot
furnish the information sought on
a unit by unit basis and direct
that all future quarterly reports reflect such information as
is
sought
by
the
Agency
in
its
Motion
for
Clarification
consistent
with
this Order.
IT IS SO ORDERED.