ILLINOIS POLLUTION CONTROL BOARD
March
21,
1974
ELDORADO WATER COMPANY
V.
ENVIRONMENTAL
PROTECTION
AGENCY
ORDER
OF THE
BOARD
(by Mr. Dumelle):
)
)
)
)
)
)
)
)
)
PCB 74-99
Petition filed March
20,
1974 is inadequate
in that it
does not report the result of copper sulfate dosages of the pre-
vious variance, PCB
73-207, granted June
14,
1973.
Petitioner is ordered
to supply
to the Board within 30 days
from the date
of this order the copper concentrations actually
achieved in the raw water intake
to the treatment plant when
dosing with copper sulfate under the conditions specified in
PCB 73-207, especially Condition Nos.
3 and 4.
Failure to timely-file the information requested shall
make the petition liable to dismissal for inadequacy.
The
90-day decision period specified under the Act.shall run from
the date of filing the additional Information requested.
IT IS SO ORDERED.
I, Christan L.
Moffet’t,
Clerk of the Illinois Pollution ~~itrol
Board, hereby certify the above Order was adopted on the
~
/
day
of March,
1974 by
a vote of
—~
Illinois
Pollution
1
Board
11
—653