    ELDORADO WATER COMPANY
    V.
    ENVIRONMENTAL
    PROTECTION
    AGENCY
    ORDER
    OF THE
    BOARD
    (by Mr. Dumelle):
    )
    )
    )
    )
    )
    )
    )
    )
    )
    PCB 74-99
    Petition filed March
    20,
    1974 is inadequate
    in that it
    does not report the result of copper sulfate dosages of the pre-
    vious variance, PCB
    73-207, granted June
    14,
    1973.
    Petitioner is ordered
    to supply
    to the Board within 30 days
    from the date
    of this order the copper concentrations actually
    achieved in the raw water intake
    to the treatment plant when
    dosing with copper sulfate under the conditions specified in
    PCB 73-207, especially Condition Nos.
    3 and 4.
    Failure to timely-file the information requested shall
    make the petition liable to dismissal for inadequacy.
    The
    90-day decision period specified under the Act.shall run from
    the date of filing the additional Information requested.
    IT IS SO ORDERED.
    I, Christan L.
    Moffet’t,
    Clerk of the Illinois Pollution ~~itrol
    Board, hereby certify the above Order was adopted on the
    ~
    /
    day
    of March,
    1974 by
    a vote of
    —~
    Illinois
    Pollution
    1
    Board
    11
    —653

    Back to top