VILLAGE OF
    SORENTO
    ILLINOIS POLLUTION CONTROL
    March
    21, 1974
    V.
    ENVIRONMENTAL PROTECTION AGENCY
    ORDER OF THE BOARD
    (by Mr. Dumelle):
    5
    PCB 74-97
    Petition filed March
    18, 1974
    is inadequate
    in that
    it
    does not report the results
    of copper sulfate dosages
    of the pre-
    vious
    variance, PCB 73-170, granted May 31,
    1973.
    Petitioner is ordered
    to supply to the Board within
    30 days
    from the date
    of this order the copper concentrations actually
    achieved in the raw water intake to
    the treatment plant when
    dosing with copper sulfate under the conditions specified in
    PCB 73-170, especially Condition Nos.
    3 and
    4.
    Failure
    to timely file the information requested
    shall
    make the petition liable
    to dismissal
    for inadequacy.
    The
    90-day decision period specified under the Act shall
    run from
    the date of filing the additional inform~ationrequested.
    IT
    IS SO ORDERED.
    I, Christan
    L. Moffett, Clerk of the
    Illinois Pollution Control
    Board, hereby certify the above Order was adopted on the
    ~
    ~
    day
    of March,
    1974 by
    a vote of
    ‘..~-O
    BOARD
    Illinois Pollution
    rol Board
    1~1
    —651

    Back to top