ILLINOIS POLLUTION CONTROL BOARD
    January
    31,
    1974
    )
    DOMINIC VENTURI
    )
    )
    )
    v.
    )
    PCB 74-52
    )
    )
    ENVIRONMENTAL PROTECTION AGENCY
    )
    )
    ORDER
    OF
    THE
    BOARD
    (by
    Mr.
    Dume lie):
    Petition
    filed
    January
    29,
    1974
    is
    inadequate
    in
    that
    informa-
    tion on the size of the building and its load upon the sewer system
    is not given;
    the date of expected occupancy is not given;
    and
    the
    reasons
    for
    beginning construction
    at all
    in the face of the then
    existing
    sewer
    connection
    ban
    are
    not
    listed.
    Petitioner
    is
    ordered
    to
    amend
    his
    petition
    within
    15
    days
    from
    date
    of
    this
    order
    to
    provide
    the
    information
    listed
    above.
    A
    waiver of the 90-day decision period for the period elapsing
    between the date of order and the filing of the amended petition
    shall
    be
    made.
    The
    Agency
    is
    directed
    to
    render
    its
    recommendation
    as
    soon
    as
    possible
    and
    in
    no event
    later than
    35
    days
    from
    the date
    of
    this
    order.
    Failure
    to
    timely
    file
    the
    information
    requested
    shall
    render
    the
    petition
    liable
    to
    dismissal
    as
    inadequate.
    IT
    IS
    SO
    ORDERED.
    I,
    Christan
    L.
    Moffett,
    Clerk
    of
    the
    Illinois Pollution Cpntrol
    Board, hereby certify the above Order was
    adoptec1 on
    the
    ~3/”~
    day of January, 1974 by
    a vote of
    ~‘_~
    ________________
    ~ristan
    L,
    Moffetft,~,çlerk
    Illinois Pollutiont~e’ntrolBoard

    Back to top